Loading...
2019.0413 CPR 3 The Hutch - Street Light PlanMOUNTAIN VIEW ROAD SESPRAGUE ST NW#6CU#6CU#6CU#6CU#6CU BANBNBNBN'D' ROAD SE'A' ROAD SE 'B' LOOP SE 'C' ROAD SE 'B' ROAD SE'A' ROAD SEA#4 ACSRBNIRR??FUT: 1-2"MON??DEVELOPER RESPONSIBLEFOR CONDUIT/WIRE FROMV06 TO METER LOCATIONSCALE: NONESTREET LIGHT TUBE DETAILPlan View Detailof Street Light TubeWire EntranceSlotStreet LightTubeFieldSideRoadSideWireEntrance Slot45°45°Position 3" x 6" wire entrance slot 45 degreesleft or right from a line perpendicular to road-way through center of tube.Field Side3" x 6" WireEntrance Slot45°45°Street light tubeset 2" below grade.Road Side See street light table for tube dimensions.5'-0"20"26"1. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL".2. ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE.3. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED.4. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED.STREET LIGHT NOTESPOTELCO:1. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES.2. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE.3. DEVELOPER TO PROVIDE ALL TRENCHING AND CONDUIT WITH PULL-STRINGS FOR STREET LIGHTING CIRCUITRY.4. CONDUIT SHALL BE SCH 40 PVC, CONDUIT CROSSING ROADWAYS OR DRIVEWAYS SHALL BE SCH 80 PVC.DEVELOPER/CUSTOMER:ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.CABLE TVPHONEGASPROJECT PHASESt. LightTemporaryJob OrderDistributionHP MainHP Svc/MSRemovalNew InstallSuperiorPWRNOTIF#ORDER#NVicinity Map 46.9536, -122.6221Owner / Developer Contact InfoofficeATTN:Sheri Green253-284-0212PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"DESIGNED BY: PSEUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONACCOUNT MGRPERMITREAL ESTATE/EASEMENT21REV#3NEW BUSINESSDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPAndrew Allwardt425-603-5904Andrew Allwardt425-603-5904N/AN/ATHE HUTCHINSTALL STREET LIGHTS9306 SE MOUNTAIN VIEW ROAD, YELM, WA 985971050935161"=50'1 of XTHURSTON35151701E0521701E0521702E068YEL-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ACORRECTIVE /10 DAY WAIVEDTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)XJOB SITEMike Hammons425-765-1395Cell PhoneLars Larson425-456-2701Project Manager Contact Information:02/04/2002/04/20and that all quality requirements are met.I certify that the work performed meets PSE's standards and proceduresDeviations noted on the As-built and their reason.Correct QA Checklist(s) reviewed.Company ID#'s RECORDED in correct location on As-built.Total PRIMARY Cable noted on As-built.Material VERIFIED and CHANGES noted on Paperwork.Print Name ___________________________________ Date ______________Foreman's Signature _______________________________________________Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Field Changes RED-LINED on As-built.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.FOREMAN (CHECK BOX WHEN COMPLETED)SCALE: 1"=50'SITE PLAN508520624105093516105093516MATCHLINE A-A (SEE PAGE 2) KILLION ROAD SE'B' LOOP SE'A' ROAD SE 'E' ROAD SEFUT: 1-2"MON??ST LT??DESIGNED BY: PSEUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONACCOUNT MGRPERMITREAL ESTATE/EASEMENT21REV#3NEW BUSINESSDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPAndrew Allwardt425-603-5904Andrew Allwardt425-603-5904N/AN/ATHE HUTCHINSTALL STREET LIGHTS9306 SE MOUNTAIN VIEW ROAD, YELM, WA 985971050935161"=50'2 of XTHURSTON35151701E0521701E0521702E068YEL-25N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ACORRECTIVE /10 DAY WAIVEDTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)XLars Larson425-456-270102/04/2002/04/20SCALE: 1"=50'SITE PLAN105093516MATCHLINE A-A (SEE PAGE 1)STREET LIGHT TABLESITE#POLELUMINAIRETUBEPOLE BASE TYPE(Direct Buried orBasemount)WO #BILLINGSCH.TOTALCONN LOADGRID #TAG #TYPEMTG HT.ARMWATTSSTYLETUBELENGTHTUBEDIAMETERSL1XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL2XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL3XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL4XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL5XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL6XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL7XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL8XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL9XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL10XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL11XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL12XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL13XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL14XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240SL15XXXXXXXXXXXXGREENCONCRETE25'6'47WLED CHFL T3GREEN5'18"DIRECT BURIED10509351651120/240Electric Service Cable in Conduit2" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCover12" Typical(6" Min)Backfill for Conduit - Soil that is free from debris, sharp rocks, and rocks larger than 10" indiameter. Backfill shall not damage the conduit.Backfill for Conduit(See Definition Above)STREET LIGHTHANDHOLE "STUB" DETAILFEEDGRADEFEED TOSTREETLIGHTTUBEFEED12"15-7/18"21-18"2"17"ApproxApprox11-3/4"14-1/8"x19-1/4"NOT TO SCALEDEVELOPER TO:PROVIDE ALL TRENCHING AND INSTALL 5' DEEP X 18" STREET LIGHT TUBES.POTELCO NCC:INSTALL & ENERGIZE ALL CIC FOR STREET LIGHTS.POTELCO STREET LIGHT CREW TO:INSTALL 15 - 25' MH GREEN CONCRETE POLES WITH 15 - 47W LED CHFL T3 GREEN LUMINAIRE HEADS ON6FT GREEN ARMS.ORIENT AS SHOWNINSTALL STREET LIGHT TAGS