2019.0052 MU Tahoma Terra - Retaining Wall Plans ApprovedREINFORCED SOIL 32°0 PSF 120 PCF SILTY SAND RETAINED SOIL 32°0 PSF 120 PCF SILTY SAND FOUNDATION SOIL 32°0 PSF 120 PCF SILTY SAND Tahoma Terra Phase II, Div II Yelm, WA SUGGESTED QUALITY ASSURANCE PROVISIONS: 1.WALL CONSTRUCTION SHALL BE SUPERVISED BY A QUALIFIED ENGINEER OR TECHNICIAN TO VERIFY FIELD AND SITE SOIL CONDITIONS. IF THIS WORK IS NOT PERFORMED BY THE SITE GEOTECHNICAL ENGINEER, A QUALIFIED GEOTECHNICAL ENGINEER/TECHNICIAN SHALL BE CONSULTED IN THOSE MATTERS PERTAINING TO THE SOIL CONDITIONS AND WALL PERFORMANCE. 2.THE FOUNDATION SOILS AT THE BASE OF THE WALL(S) SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER. ANY UNSUITABLE SOILS OR IMPROPERLY COMPACTED EMBANKMENT MATERIAL SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE ENGINEER PRIOR TO WALL CONSTRUCTION TO PROVIDE ADEQUATE BEARING CAPACITY AND MINIMIZE SETTLEMENT. 3.ALL WALL EXCAVATION AND RETAINED SOILS SHALL BE INSPECTED FOR GROUNDWATER CONDITIONS. ANY ADDITIONAL DRAINAGE PROVISIONS REQUIRED IN THE FIELD SHALL BE INCORPORATED INTO THE WALL CONSTRUCTION AS DIRECTED BY THE GEOTECHNICAL ENGINEER. 4.WALL BACKFILL MATERIAL SHALL BE TESTED AND APPROVED BY THE ENGINEER, MEETING THE MINIMUM REQUIREMENTS OF THE APPROVED DESIGN PLANS OR SPECIFICATIONS. 5.ALL SOIL BACKFILL SHALL BE TESTED BY THE GEOTECHNICAL ENGINEER FOR MOISTURE, DENSITY, AND COMPACTION PERIODICALLY (EVERY 2' VERTICALLY, 100'-200' C/C) MEETING THE MINIMUM REQUIREMENTS OF THE APPROVED DESIGN PLANS OR SPECIFICATIONS. 6.THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN QUALITY CONTROL FOR THE CONSTRUCTION OF THE WALL TO ASSURE COMPLIANCE WITH CONTRACT REQUIREMENTS AND MAINTAIN RECORDS OF ITS QUALITY CONTROL. 7.ALL WALL ELEVATIONS, GRADES, AND BACK SLOPE CONDITIONS SHALL BE VERIFIED BY THE ENGINEER IN THE FIELD FOR CONFORMANCE WITH APPROVED DESIGN PLANS. ANY REVISIONS TO THE STRUCTURE GEOMETRY OR DESIGN CRITERIA SHALL REQUIRE DESIGN MODIFICATIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. 8.SURFACE WATER SHALL BE DIVERTED AWAY FROM THE RETAINING WALL AND WALL REINFORCED ZONE. WHERE WATER CANNOT BE DIVERTED, NOTIFY THE ENGINEER FOR DESIGN OF A SWALE TO DIVERT THE FLOW OR A DROP BOX TO DRAIN THE WATER THROUGH THE WALL. DESIGN PROVISIONS: 1.THE FOLLOWING EFFECTIVE STRENGTH PARAMETERS WERE ASSUMED IN THE PREPARATION OF THE STRUCTURAL CALCULATIONS FOR THE RETAINING WALL SYSTEM: SOIL TYPES AND DESIGN PROPERTIES SHALL BE CONFIRMED BY THE SITE GEOTECHNICAL ENGINEER PRIOR TO WALL CONSTRUCTION. 2.THE WALL(S) ARE DESIGNED TO SUPPORT THE FOLLOWING MAXIMUM SURCHARGE LOADINGS: LIVE LOAD: NONE DEAD LOAD: NONE BACK SLOPE: NONE SEISMIC: 0.33g 3.HYDROSTATIC: NOT APPLICABLE 4.THE FOUNDATION SOILS AT WALL LOCATIONS SHALL BE CAPABLE OF SAFELY SUPPORTING THE MAXIMUM APPLIED BEARING PRESSURE, AS SHOWN ON THE WALL PROFILES, WITHOUT FAILURE OR EXCESSIVE SETTLEMENT. LOCAL BEARING CAPACITY SHALL BE CONFIRMED BY THE SITE GEOTECHNICAL ENGINEER AFTER FOUNDATION EXCAVATION AND PRIOR TO WALL CONSTRUCTION. 5.REFERENCES: 5.1.GEOTECHNICAL REPORT 5.1.1.Geologic Assessment, Proposed Tahoma Terra Residential Development 2-9, Yelm, WA, Insight Geologic, PLLC, March 4, 2005. SHEET DESCRIPTION T-1 TITLE PAGE/SPECIFICATIONS P-1 OVERALL PLAN VIEW P-2 ENLARGED PLAN VIEW 1-1 WALL 1 2-1 WALL 2 3-1 TO 3-2 WALL 3 4-1 TO 4-2 WALL 4 D-1 GRAVITYSTONE EDGE DETAILS D-2 FENCE POST DETAIL GravityStone Edge Retaining Wall PART 1: GENERAL 1.01 Description A.The work to be performed includes sourcing, providing and installing concrete retaining wall blocks to the lines and grades as specified on the project construction drawings and as may be further specified herein. B.Work includes preparing foundation soil, furnishing and installing leveling pad, unit fill and backfill to the lines and grades shown on the construction drawings. C.Work includes furnishing and installing all related materials required for construction of the retaining wall as shown on the construction shop drawings. 1.02 Reference Standards A.ASTM D448 Sizes of Aggregate for Road and Bridge Construction. ASTM D698 Laboratory Compaction Characteristics using Standard Effort. 1.03 Quality Assurance A.Owner shall be responsible for soil testing and inspection quality control during earthwork operations. PART 2: MATERIALS 2.01 Definitions A.Retaining Wall Unit - A segmental concrete facing block that is able to be arranged, stacked, placed, combined, or interchanged easily into an assembled wall system. B.Leveling Pad - A compacted crushed stone pad which serves as a flat surface for placing the initial course of precast units. C.Granular Aggregate - Clean 1" minus crushed angular rock located within and immediately behind the retaining wall units to facilitate drainage and avoid compaction in close proximity to the retaining wall units. D.Joint Geotextile - A filter fabric installed to prevent infill and/or backfill material from migrating through the joints. E.Foundation Soil - Soil zone immediately beneath the retaining wall facing units, the wall leveling pad and the reinforced soil zone. F.Retained Soil - Soil immediately behind the retaining wall facing drainage aggregate or reinforced backfill if present. G.Subsurface Drainage System - A system for removing water from behind the wall and channeling it to a point of positive drainage. 2.02 GravityStone Edge Units A.GravityStone Edge wall units shall have a minimum 28-day compressive strength of 3,000 psi. B.Texture on the face of the block shall be specified. Other surfaces to be smooth form type. 2.03 Base Leveling Pad Material A.Material shall consist of compacted crushed stone as shown on the construction drawing. 2.04 Gravel Layer A.Gravel layer shall consist of clean 1" minus crushed stone or crushed gravel meeting the following gradation: Sieve Size % Passing 1"100 3/4"100-75 No. 4 0-10 No. 50 0-5 2.05 Retained Backfill A.Backfill shall be free of debris or organic material. Plasticity Index (PI)<20 and Liquid Limits (LL)<40 B.Material can be site excavated material when the above requirements are met. Unsuitable soils for backfill (high plastic clays or organic materials) shall not be used in the retained soil mass. PART 3: EXECUTION 3.01 Excavation A.Contractor shall excavate to the lines and grades shown on the construction drawings. Contractor shall be careful not to disturb embankment and foundation materials beyond lines shown. 3.02 Foundation Soil Preparation A.Foundation soil shall be excavated as required for leveling pad dimensions shown on the construction drawings, or as directed by the Geotechnical Engineer. B.Unsuitable soils shall be removed and replaced with acceptable material. C.Over-excavated areas shall be backfilled with approved compacted backfill material. 3.03 Base Leveling Pad A.Leveling pad materials shall be placed upon approved foundation as shown on the construction drawings to a minimum thickness of 6". B.Aggregate material shall be compacted to provide a dense, level surface on which to place the first course of modular units. Compaction shall be to 95% of Standard Proctor Density as determined in accordance with ASTM D698. For crushed rock, material shall be densely compacted as determined by visual observation. 3.04 Unit Installation A.The first course of concrete modular wall units shall be carefully placed on the base leveling pad. Each unit shall be checked for level and alignment. B.Units are placed side by side for full length of wall alignment. Alignment may be done by means of a string line or offset from a base line. C.Sweep excess material from top of units and install next course. Ensure that each course is completely unit filled between and 12" behind block. Backfill and compact prior to proceeding to next course. 3.05 Fill Placement A.Backfill material shall be placed with a maximum of 8" lifts and compacted to 95% of Standard Proctor Density. As determined in accordance with ASTM D698. The in place moisture content shall not exceed the optimum moisture content as determined in accordance with ASTM D698 and be no lower than 2% below optimum moisture content. B.Only hand-operated compaction equipment shall be allowed within 3' of the back surface of the concrete units. RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. T-1 TITLE PAGE / SPECIFICATION 2/5/2020 12:35:10 PM BEGIN WALL 1 NW WALL BEGIN WALL 2 N MIDDLE WALL BEGIN WALL 3 NE WALL BEGIN WALL 4 SW WALL GRAPHIC SCALE IN FEET 0 100 200 300 RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. P-1 PLAN VIEW GENERAL DESIGN NOTES: THE SITE PLAN IS FOR ILLUSTRATION ONLY. IT WAS REPRODUCED FROM: Grading Plan, Tahoma Terra Phase II, Div II, Phase 2, Yelm, WA., KPFF, Job No. 406030.06, Sheets R1, R2, 11/8/2019. 2/5/2020 12:35:11 PM BEGIN WALL 1 NW WALL BEGIN WALL 2 N MIDDLE WALL BEGIN WALL 3 NE WALL GRAPHIC SCALE IN FEET 0 40 80 120 GENERAL DESIGN NOTES: THE SITE PLAN IS FOR ILLUSTRATION ONLY. IT WAS REPRODUCED FROM: Grading Plan, Tahoma Terra Phase II, Div II, Phase 2, Yelm, WA., KPFF, Job No. 406030.06, Sheets R1, R2, 11/8/2019. RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. P-1 PLAN VIEW NORTH WALLS SOUTH WALL 2/5/2020 12:35:18 PM Outside CnrSta 930 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 376.5 374.83 373.5 371.5 369.5 367.5 365.5 364.17 362.17 360.17 358.17 356.17 355.5 354.83 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 L=14ft 2600psf SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 L=14ft 2500psf SG200- L=6 SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 1100psf SG200- L=4 SG200- L=4 L=4ft 600psf CAP MATCH LINEEL AT BASE OF UNIT SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 L=12ft 2300psf SG200- L=10 SG200- L=10 SG200- L=10 SG200- L=10 SG200- L=10 SG200- L=10 SG200- L=10 L=10ft 1900psf SG200- L=8 SG200- L=8 SG200- L=8 SG200- L=8 SG200- L=8 L=8ft 1500psf GS EDGE SG200 GEOGRID REINFORCING 355 360 365 370 375 380 Rein Bearing(psf) Wall No: 00001 NW 355 360 365 370 375 380 Rein Bearing(psf) Wall No: 00001 NW DETAIL 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 376.5 354.83 354.17 354.83 356.83 358.83 360.83 362.83 364.83 366.83 368.83 370.83 372.83 374.83SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 900psf SG200- L=6 L=6ft 500psf SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 L=14ft 2700psf SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 L=14ft 2700psfMATCH LINECAP SG200 GEOGRID REINFORCING GS EDGE SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 L=12ft 1700psf SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 SG200- L=12 L=12ft 1300psf SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 SG200- L=14 L=14ft 2400psf EL AT BASE OF UNIT RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 1-1 WALL 1 2/5/2020 12:35:30 PM Inside CnrSta 360 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 378.33 379.66 380.33 381 380.33 379.66 379 378.33 377.66 377.33 376.66 376 SG200- L=4 L=4ft SG200- L=4 L=4ft SG200- L=4 L=4ft SG200- L=4 L=4ft 200psf L=0.88ft 200psf L=0.88ft 300psf 400psf 500psf 500psf 200psf L=0.88ft 200psf L=0.88ft SG200- L=4 SG200- L=4 L=4ft 500psf SG200- L=4 L=4ft 400psf SG200- L=4 L=4ft 300psf CAP GS EDGE SG200 GEOGRID REINFORCING MATCH LINEEL AT BASE OF UNIT 375 380 Rein Bearing(psf) Wall No: 2 N MIDDLE 375 380 Rein Bearing(psf) Wall No: 2 N MIDDLE 120 125 130 377 200psf L=0.88ft 200psf L=0.88ftMATCH LINERACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 2-1 WALL 2 2/5/2020 12:35:32 PM 370 375 380 Rein Bearing(psf) Wall No: 3 NE Outside CnrSta 910 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 377.67 378.33 379 379.67 380.33 381 376 376.67 377.33 376.67 376 SG200- L=4 L=4ft SG200- L=4 L=4ft 200psf L=0.88ft 300psf 500psf SG200- L=4 L=4ft 600psf SG200- L=4 L=4ft 600psf SG200- L=4 L=4ft 500psf SG200- L=4 L=4ft 500psf SG200- L=4 L=4ft 400psf MATCH LINESG200- L=4 L=4ft 300psf CAP GS EDGE SG200 GEOGRID REINFORCING EL AT BASE OF UNIT 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 380.33 375.33 374.67 374 373.33 372.67 373.33 SG200- L=5 SG200- L=5 SG200- L=5 L=5ft 900psf SG200- L=4 SG200- L=4 L=4ft 600psfMATCH LINEMATCH LINEDETAIL SG200- L=5 SG200- L=5 SG200- L=5 SG200- L=5 L=5ft 900psf SG200- L=5 SG200- L=5 SG200- L=5 SG200- L=5 L=5ft 900psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=5 SG200- L=5 SG200- L=5 L=5ft 800psf CAP GS EDGE SG200 GEOGRID REINFORCING EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 3 NE 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 379.67 379 373.33MATCH LINEMATCH LINESG200- L=4 SG200- L=4 SG200- L=4 L=4ft 800psf SG200- L=4 SG200- L=4 L=4ft 700psf CAP GS EDGE SG200 GEOGRID REINFORCING EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 3 NE RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 3-1 WALL 3 2/5/2020 12:35:33 PM 360 365 370 375 380 385 390 395 400 405 410 415 420 425 430 435 440 445 450 455 460 465 470 475 480 378.33 374 SG200- L=4 SG200- L=4 L=4ft 600psfMATCH LINEMATCH LINESG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 L=4ft 600psf GS EDGECAP SG200 GEOGRID REINFORCING EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 3 NE 480 485 490 495 500 505 510 515 520 525 530 535 540 545 550 377.67 377 376.33 375.67 375 375 374 200psf L=0.88ft 200psf L=0.88ft SG200- L=4 L=4ft 400psf SG200- L=4 L=4ft 300psf SG200- L=4 L=4ft 500psfMATCH LINECAP SG200 GEOGRID REINFORCING GS EDGE EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 3 NE RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 3-2 WALL 3 2/5/2020 12:35:35 PM 370 375 380 Rein Bearing(psf) Wall No: 4 SOUTH 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 375.33 376 376.67 377.33 378 378.67 379.33 374.33 373.67 SG200- L=4 L=4ft SG200- L=4 SG200- L=4 L=4ft 200psf L=0.88ft 200psf L=0.88ft 300psf 600psf SG200- L=4 SG200- L=4 L=4ft 600psf SG200- L=4 SG200- L=4 L=4ft 500psf SG200- L=4 SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 L=4ft 600psf CAP GS EDGE MATCH LINESG200 GEOGRID REINFORCING EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 4 SOUTH 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 380 379.33 373 372.33 SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 1000psf SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 900psf SG200- L=4 SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 900psf GS EDGE MATCH LINEMATCH LINECAP SG200 GEOGRID REINFORCING EL AT BASE OF UNIT RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 4-1 WALL 4 2/5/2020 12:35:37 PM 370 375 380 Rein Bearing(psf) Wall No: 4 SOUTH 240 245 250 255 260 265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340 345 350 355 360 378.67 378 377.33 376.67 376 371.67 371 SG200- L=6 SG200- L=6 SG200- L=6 L=6ft 900psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 SG200- L=4 SG200- L=4 L=4ft 800psf SG200- L=4 SG200- L=4 SG200- L=4 L=4ft 800psf SG200- L=4 SG200- L=4 L=4ft 800psfMATCH LINEMATCH LINECAP GS EDGE SG200 GEOGRID REINFORCING EL AT BASE OF UNIT Outside CnrSta 438Outside Cnr360 365 370 375 380 385 390 395 400 405 410 415 420 425 430 435 440 445 450 455 460 465 470 475 480 376 375.33 374.67 374 374 373.33 370.33 369.67 369 SG200- L=4 SG200- L=4 L=4ft 500psf SG200- L=4 SG200- L=4 L=4ft 600psf SG200- L=4 L=4ft 500psf SG200- L=4 L=4ft 600psf SG200- L=4 SG200- L=4 L=4ft 600psf SG200- L=4 SG200- L=4 L=4ft 700psf SG200- L=4 L=4ft 500psf CAP GS EDGE MATCH LINEMATCH LINESG200 GEOGRID REINFORCING EL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 4 SOUTH Outside CnrSta 483Inside CnrSta 540480 485 490 495 500 505 510 515 520 525 530 535 540 545 550 555 560 565 570 372.67 372 372.67 372.67 369.67 370.33 371SG200- L=4 L=4ft 400psf 200psf L=0.88ft 200psf L=0.88ft 300psf L=0.88ft 200psf L=0.88ft 200psf L=0.88ft SG200- L=4 SG200- L=4 L=4ft 600psf CAP SG200 GEOGRID REINFORCING GS EDGE MATCH LINEEL AT BASE OF UNIT 370 375 380 Rein Bearing(psf) Wall No: 4 SOUTH RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. 4-1 WALL 2 2/5/2020 12:35:38 PM 8"24 " 10.5" 18 " 10"4"24 10"4"24 "8"10.5" Drainage Fill Place Additional Pieces of Geogrid When Angle Exceeds 20degs. 3'' of Soil Fill is Required Between Overlapping Geogrid for Proper Anchorage. (Typ.) Additional Drainage Fill Extend Wall Height/2 Geogrid Installation at Corners 14' CAP FILTER FABRIC OVER GRAVEL ZONE 12" CRUSHED STONE 4" PERFORATED DRAINAGE PIPE OUTLET 50' C/C 6" CRUSHED STONE LEVELING PAD SG200 GEOGRID REINFORCING WALL 1 NW STA 153 RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. D-1 DETAILS 2/5/2020 12:35:40 PM CAP FILTER FABRIC OVER GRAVEL ZONE 12" CRUSHED STONE 40° FENCE POST SLEEVE-IT NOTE: WHERE POST OF 2' OR MORE AWAY FROM THE WALL, A SONO-TUBE MAY BE USED. RACE ENGINEERING ASSOC. 4851 Four Seasons Ct Eagan, MN 55122 e: rrace@rea-llc.com t: 612-670-7009 Tahoma Terra Phase II, Div II Yelm, WA 19-013-01 1/11/20 DESIGN INFORMATION PROVIDED FOR INTERNAL STABILITY ONLY. EXTERNAL STABILITY, INCLUDING BUT NOT LIMITED TO FOUNDATION SETTLEMENT, GLOBAL STABILITY AND SLOPE STABILITY IS THE RESPONSIBILITY OF THE OWNER AND OWNER'S ENGINEER. D-2 HANDRAIL DETAILS 2/5/2020 12:35:41 PM