2019.0394 Drainge Report Addendum (Accepted)
TAHOMA TERRA PHASE II, DIVISION II
Yelm, WA
ADDENDUM
TO STORM DRAINAGE REPORT
For Tahoma Terra Divisions 5 & 6
Prepared by:
Benjamin E. Enfield, PE
KPFF Project No. 414004
May 26, 2020
100P
ROF
E
SSIONA L E N GINEERR
EGI S T E R EDTOSATEOFWASHIN
G
T
NBENJA M I N E.A.E
N
F
I
ELD
Tahoma Terra Phase II, Division II Storm Drainage Report Addendum
Yelm, WA
KPFF Consulting Engineers May 26, 2020
ATTACHMENTS
A. Updated Calculations for Existing Wetpond and Infiltration Pond
B. Stormwater Pond Maintenance and Modification Exhibit
C. Stormwater Conveyance Analysis
SUMMARY
This addendum has been prepared to address comment letters received from the City of Yelm
dated April 10, 2020 for Tahoma Terra Phase II, Division II (previously known as Tahoma Terra
Divisions 5 & 6). This addendum is prepared for the storm report dated May 12, 2014.
The proposed concept for water runoff treatment and flow control for this project remains
unchanged from the plan identified in the Master Plan documents. Per the May 24, 2016 ‘Letter
of Understanding – Tahoma Terra Master Plan Community, Stormwater Requirements &
Vesting” referenced in the Hearing Examiner conditions “The remaining development of the
198-lots, which may be phased, will not require any stormwater changes to the existing pond
system, unless the as stated monitoring or study of the facility determines it is not meeting the
original designed performance requirements.”
EXISTING POND BASIN AREAS AND POND SIZES
Analysis of the current basin areas for the existing storm ponds in comparison to the basins
used in 2006 and 2014 Storm Reports has determined that the currently proposed basins are
larger than the basins shown in the previous reports.
Table 1: Basin Area to Wetpond “A” and Infiltration Pond (acres)
2006/2014 Report Current
Impervious Area 23.20 31.551
Pervious Area 38.54 43.124
Total Basin Area 61.74 74.675
Updated calculations show that the original infiltration pond was designed with enough capacity
to handle runoff from the current basin area, but the existing wetpond is slightly undersized. See
Attachment A for supplemental stormwater calculations.
Increasing the wetpond depth in relation to the original design depth of 3.65’ to a depth 4.75’ will
provide the required pond volume as shown in the attached calculations. The ponds have
enough existing outer berm height that adjustment to the intermediate berm and spillway
elevations can be performed while still maintaining freeboard. The pond modification is
proposed in conjunction with recommended maintenance activities. To ensure protection of the
pond liner it is proposed to remove sediment from the wetpond to a pond bottom elevation of
342.0’ (1.0’ above the original pond bottom). The modifications proposed to the spillway to
provide the required wetpond storage include raising/rebuilding the rip rap spillway from the
wetpond to the infiltration pond to an elevation of 346.75’ (2.1’ above original design elevation)
and the top of berm between the ponds to an elevation of 347.75’ (1.75’ above original design).
See Attachment B for proposed pond maintenance and modifications exhibit.
NARRATIVE STORMWATER CONVEYANCE SYSTEM
The destination of stormwater generated from this project remains the same as previously
identified (the existing ponds located south of Tahoma Boulevard) but the conveyance system
Tahoma Terra Phase II, Division II Storm Drainage Report Addendum
Yelm, WA
KPFF Consulting Engineers May 26, 2020
within Tahoma Terra Phase II, Division II has been reconfigured to divert proposed runoff away
from the existing Tahoma Terra Divisions 3 & 4 conveyance systems. The Phase II, Division II
(aka Div. 5 & 6) storm conveyance system now conveys the majority of storm runoff south
though the current development area directly to the proposed Tahoma Boulevard storm system
rather than through the existing Div. 3 &4 system. The proposed conveyance system has been
designed with adequate capacity for development. Analysis of the 25-year and 100-year flow
events through the system was performed with a conservatively assigned backwater elevation
at the crown of the outfall pipe (an elevation above the pond spillway). The analysis showed the
HGL was below the minimum required 0.5’ depth below all catch basin rim elevations for the 25-
year design storm and below all structure rims for the 100-year design storm. See Attachment
C for stormwater conveyance analysis results.
Tahoma Terra Phase II, Division II Storm Drainage Report Addendum
Yelm, WA
KPFF Consulting Engineers May 26, 2020
Attachment A
Updated Calculations for Existing Wetpond “A” and Infiltration Pond
230 231 232 233 234 235 236 237 238 239 240
241
242
243
244
245
246
247
248
249
250251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268269
270
271
272
273
274
275
276
310
311
312
313
314
315
316
317
318
319
320
321
322
PARK
308
309
OPEN SPACE OPEN SPACE
OPEN SPACE
330 329
201202203204205206207208209
210 211 212 213 214 215 216 217 218
219220221222223224225226227228229
277 278 279 280 281 282 283 284 285 286 287 288 289
290291292293294295296297298299300301
302303304305
306
307
323
324
325
326
327
328331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354 355
356357358359360361362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
386 387 388 389 390 391 392 393 394 395 396 397 398
ALLEY 1
PARK
385
OPEN SPACE
WELL
OS
86
OPEN OPEN
OPENOPENOPEN
OPENO
P
E
N
72
71
70
69
68
67
66
65
64
63
62
61
60
59
58
57
56
55
54
53
52
51
50
49
48
47 46
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
1413121110987654321
ALLEY 1
41
44
43 42
45
73
74
75
76
77
78
79
80
81
82
83
84
85
87
88
89
90
91
92
93
94
95
96
97
98
99100101102103104105106107108109110111
112 113 114 115 116 117 118 119 120 121 122 123 124
125
126
127
128
129
130
131
132133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150151
152
153
154
155
156
157
158
159
160 161 162 163 164 165 166 167 168 169
170171172173174175176177178179180
181 182 183 184 185 186 187 188 189 190
191192193194195196197198199200
OPEN
OPENOPEN OPEN
PARKALLEY 250+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+0040+0041+0042+0043+0044+0045+0046+0047+0048+0049+00
345342345
34210+0029+00TAHOMA TERRA PH II, DIV II (aka DIV 5&6), PHASE 2
OVERALL BASIN TO EXISTING PONDS
DATE: 5/26/2020
EXISTING INFILTRATION POND EXISTING WET POND "A"
WELL 1A
TAHOMA BLVD
TAHOMA TERRA
PHASE II, DIVISION II
(aka DIV 5 & 6)
TAHOMA TERRA
DIV 3 & 4
(200 LOTS)
PH II, DIV II -
PHASE 2
(136 LOTS)
PH II, DIV II -
PHASE 1
(62 LOTS)
BASIN BOUNDARY TO
EXISTING STORM PONDS
Appended on: Saturday, May 23, 2020 7:52:16 AM
LPOOLCOMPUTE [N-Pond] SUMMARY using Puls, 24 hr Storm Event
Start of live storage:340 ft
Summary Report of all Detention Pond Data
Project Precips
BASLIST2
[B-Pond] Using [TYPE1a.rac] As [2 yr 24 hr] [24.0]
[B-Pond] Using [TYPE1a.rac] As [25 year] [24.0]
[B-Pond] Using [TYPE1a.rac] As [100 year] [24.0]
[B-Pond] Using [TYPE1a.rac] As [2 yr 24 hr] [24.0]
[B-Pond] Using [TYPE1a.rac] As [2 yr 24 hr] [24.0]
[B-Pond] Using [TYPE1a.rac] As [25 year] [24.0]
[B-Pond] Using [TYPE1a.rac] As [25 year] [24.0]
[B-Pond] Using [TYPE1a.rac] As [100 year] [24.0]
[B-Pond] Using [TYPE1a.rac] As [100 year] [24.0]
LSTEND
BASLIST
[B-Pond]
LSTEND
Record Id: B-Pond
Event Match Q (cfs)Peak Q (cfs)Max Depth (ft)Vol (cf)Vol (acft)Time to Empty (hr)
2 yr 24 hr 11.2451 8.9979 0.2479 4751.1206 0.1091 0.1667
25 year 23.0154 10.9654 2.1441 45334.4748 1.0407 0.1667
100 year 28.0127 11.9872 3.0839 68338.5944 1.5688 0.1667
Event Precip (in)
6-month 1.28
2 yr 24 hr 2.00
25 year 3.50
100 year 4.00
BasinID Event Peak Q (cfs)Peak T (hrs)Peak Vol (ac-cf)Area (ac)Method/Loss Raintype
B-Pond 2 yr 24 hr 11.2451 8.00 5.3641 74.675 SBUH TYPE1a.rac
B-Pond 25 year 23.0154 8.00 11.8272 74.675 SBUH TYPE1a.rac
B-Pond 100 year 28.0127 8.00 14.2295 74.675 SBUH TYPE1a.rac
B-Pond 2 yr 24 hr 11.2451 8.00 5.3641 74.675 SBUH TYPE1a.rac
B-Pond 2 yr 24 hr 11.2451 8.00 5.3641 74.675 SBUH TYPE1a.rac
B-Pond 25 year 23.0154 8.00 11.8272 74.675 SBUH TYPE1a.rac
B-Pond 25 year 23.0154 8.00 11.8272 74.675 SBUH TYPE1a.rac
B-Pond 100 year 28.0127 8.00 14.2295 74.675 SBUH TYPE1a.rac
B-Pond 100 year 28.0127 8.00 14.2295 74.675 SBUH TYPE1a.rac
Page 1 of 3
5/23/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
INFILTRATION POND
HYDLIST SUMMARY
[2 yr 24 hr out] [25 year out] [100 year out]
LSTEND
STORLIST
[N-DETPOND]
LSTEND
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 43.124 ac DCIA 31.551 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 30.2372 min DC TC 19.9246 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)43.124 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Dense grasses 0.24 280.00 ft 4.6%0.24 0.00 in 29.4799 min
Int Channel Earth-lined (n=0.025)270.00 ft 8.5%0.025 0.7572 min
Pervious TC 30.2372 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)31.551 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Smooth Surfaces. 0.011 17.00 ft 2.0%0.011 2.00 in 0.3714 min
Shallow Paved 255.00 ft 1.0%0.01 2.0907 min
Int Channel Concrete pipe (n=0.012)2297.00 ft 0.4%0.012 14.2546 min
Int Channel Concrete pipe (n=0.012)79.00 ft 0.95%0.012 0.3181 min
Int Channel Concrete pipe (n=0.012)63.00 ft 0.51%0.012 0.3462 min
Int Channel Concrete pipe (n=0.012)436.00 ft 1.2%0.012 1.5621 min
Int Channel Concrete pipe (n=0.012)220.00 ft 1.31%0.012 0.7544 min
Int Channel Concrete pipe (n=0.012)103.00 ft 3.17%0.012 0.2271 min
Pervious TC 19.9246 min
HydID Peak Q (cfs)Peak T (hrs)Peak Vol (ac-ft)Cont Area (ac)
2 yr 24 hr out 8.9979 8.33 5.3641 74.675
25 year out 10.9654 9.50 11.8272 74.675
100 year out 11.9872 9.67 14.2295 74.675
Page 2 of 3
5/23/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Record Id: N-DETPOND
DISCHLIST
[D-INF]
LSTEND
Record Id: D-INF
Licensed to: Debug License
Descrip:Prototype Record Increment 0.10 ft
Start El.340.00 ft Max El.347.00 ft
Void Ratio 100.00
Length 270.00 ft Width 70.00 ft
Length ss1 3.00v:1h Length ss2 3.00v:1h
Width ss1 3.00v:1h Width ss2 3.00v:1h
Consider wetted surface for infiltration
Trap Type Node
Infiltration
Descrip:Prototype Structure Increment 0.10 ft
Start El.340.00 ft Max El.347.00 ft
Infiltration rate 20.00 in/hr WP Multiplier 1.00
Page 3 of 3
5/23/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
EXISTING INFILTRATION POND HAS CAPACITY TO INFILTRATE ALL RUNOFF
Appended on: Saturday, May 23, 2020 6:57:12 AM
B-Pond Event Summary
Record Id: B-Pond
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 6.7784 8.00 2.8792 74.675 SBUH
2 yr 24 hr 11.2451 8.00 5.3641 74.675 SBUH
25 year 23.0154 8.00 11.8272 74.675 SBUH
100 year 28.0127 8.00 14.2295 74.675 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If
some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 43.124 ac DCIA 31.551 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 30.2372 min DC TC 19.9246 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)43.124 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Dense grasses 0.24 280.00 ft 4.6%0.24 0.00 in 29.4799 min
Int Channel Earth-lined (n=0.025)270.00 ft 8.5%0.025 0.7572 min
Pervious TC 30.2372 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)31.551 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Smooth Surfaces. 0.011 17.00 ft 2.0%0.011 2.00 in 0.3714 min
Shallow Paved 255.00 ft 1.0%0.01 2.0907 min
Int Channel Concrete pipe (n=0.012)2297.00 ft 0.4%0.012 14.2546 min
Int Channel Concrete pipe (n=0.012)79.00 ft 0.95%0.012 0.3181 min
Int Channel Concrete pipe (n=0.012)63.00 ft 0.51%0.012 0.3462 min
Int Channel Concrete pipe (n=0.012)436.00 ft 1.2%0.012 1.5621 min
Int Channel Concrete pipe (n=0.012)220.00 ft 1.31%0.012 0.7544 min
Int Channel Concrete pipe (n=0.012)103.00 ft 3.17%0.012 0.2271 min
Pervious TC 19.9246 min
Page 1 of 2
5/23/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
TREATMENT WETPOND
Wetpond volume after proposed revisions
elev.contour area (ft2)
incremental
volume (ft3)
342 21,653
343 23,760 22,707
344 25,923 24,842
345 28,143 27,033
346 30,420 29,282
346.75 32,165 23,469
Total Volume =127,332
Required Wetpond Volume (per updated StormShed 6-month storm) = 2.8792 ACFT = 125,418 cu. ft.
Original Designed Pond has dead storage volume of 92,548 cu. ft.
Proposed Wetpond dead storage volume after maintenenance/modifications = 127,332 cu. ft.
See wetpond maintenance/modification exhibit in Attachment B.
Tahoma Terra Phase II, Division II Storm Drainage Report Addendum
Yelm, WA
KPFF Consulting Engineers May 26, 2020
Appendix B
Stormwater Pond Maintenance and Modification Exhibit
41DEVELOPMENT REVIEW ENGINEERBY:DATE:APPROVED FOR CONSTRUCTIONAPPROVAL EXPIRES:CALL UNDERGROUND LOCATE TWOWORKING DAYS BEFORE YOU DIG1-800-424-5555R-1318ROADWAY & STORMDRAINAGE DETAILSVERTICAL DATUMNGVD 29PER THURSTONCOUNTY HIGHPRECISION NETWORKHORIZONTAL CONTROL:WASHINGTON STATE PLANE, SOUTHZONE PER TCHPN&THURSTON COUNTY HIGHPRECISION NETWORKA-A
~WETPOND "A" & INFILTRATION PONDSCALE: 1" = 40'C-C~D-D~WETPOND NOTE:WETPOND TO BE UTILIZED AS A TEMPORARY SEDIMENT BASIN. EXCAVATE TO 0.5' BELOW FINAL DESIGN ELEVATION (325.50),(340.50)87653412WETPOND "B"SCALE: 1" = 40'WETPOND "B"91012112B-B~INFILTRATION PONDWETPOND "A"RIP RAP /EMERGENCY SPILLWAYPOND(S) CORNER COORDINATE TABLE592955.6257NORTHING1107337.4940EASTINGBOTTOM RADIUS2.00'1234567891011122.00'2.00'2.00'2.00'2.00'2.00'2.00'5.00'5.00'5.00'5.00'592889.65311107335.5918592881.98661107601.4813592947.95921107603.3835592917.31891107649.2557592916.62081107715.2520593182.60591107718.0656593183.30401107652.0693593540.69851108516.8741593543.66971108522.0868593627.07261108474.5479593624.10141108469.3352C-C~D-D~B-B~A-A~TAHOM
A
B
L
V
D
.TYPE 1 CATCH BASINWITH SOLID COVER.SEE DETAIL ON THISSHEET - LEFT100 LF - 8" PVC @0.1%INV. OUT = 330.06RIP RAP SPILLWAYINV. OUT = 330.16WETPOND "B" RELEASESTRUCTURE DETAILNOT TO SCALESOLID LID8" PVCINV. ELV. = 330.1612" KNOCK OUTWITH 1/2" REBAR@4" O.C.1 11/2007 DLG CDP MRS AS BUILTSD. Re-build spillway toelevation 346.75 and topof berm to elevation347.75'WET POND "A" MAINTENANCE/ADJUSTMENTS:A. REMOVE ALL TREES AND LARGE SHRUBS FROM SEDIMENT POND.B. REMOVE ACCUMULATED SEDIMENT IN BOTTOM OF POND DOWN TO ELEVATION 342.0 (1.0' ABOVEORIGINAL POND DEPTH).C. PERFORM VISUAL INSPECTION AND HAND SHOVEL TESTS TO CONFIRM POND LINER MATERIAL ANDCONDITION. KPFF AND/OR INSIGHT GEOLOGIC TO WALK THE WETPOND AFTER EARLIER STEPS ARECOMPLETE AND INDICATE LOCATIONS TO PERFORM SHOVEL TESTS. D. RAISE/REBUILD SPILLWAY TO INFILTRATION POND "A" TO ELEVATION 346.75' AND TOP OF BERMBETWEEN PONDS TO ELEVATION 347.75' PER DETAIL ON THIS SHEET.E. SUPPLEMENT/RESTORE ROCK PAD AT WETPOND INLET PIPE.E. SUPPLEMENT/RESTORE ROCK PAD ATWETPOND INLET PIPE.A. REMOVE ALL TREES AND LARGESHRUBS FROM POND.B. REMOVE ACCUMULATED SEDIMENT INWETPOND TO AN ELEVATION OF 342.0'(1.0' ABOVE ORIGINAL POND DEPTH).D. RAISE/REBUILD RIP RAP SPILLWAY TOAN ELEVATION OF 346.75' AND TOP OFBERM BETWEEN PONDS TO ANELEVATION OF 347.75'MAY 2020 POND MAINTENANCE RECOMMENDATIONS BY KPFF CONSULTING ENGINEERSEXISTING TOP OF POND = 348'(WETPOND AND INFILTRATIONPOND)D. RAISE BERM TO347.75 (APPROX. 1.75')
Tahoma Terra Phase II, Division II Storm Drainage Report Addendum
Yelm, WA
KPFF Consulting Engineers May 26, 2020
Appendix C
Stormwater Conveyance Analysis
230 231 232 233 234 235 236 237 238 239 240
241
242
243
244
245
246
247
248
249
250251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268269
270
271
272
273
274
275
276
310
311
312
313
314
315
316
317
318
319
320
321
322
PARK
308
309
OPEN SPACE OPEN SPACE
OPEN SPACE
330 329
201202203204205206207208209
210 211 212 213 214 215 216 217 218
219220221222223224225226227228229
277 278 279 280 281 282 283 284 285 286 287 288 289
290291292293294295296297298299300301
302303304305
306
307
323
324
325
326
327
328331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354 355
356357358359360361362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
386 387 388 389 390 391 392 393 394 395 396 397 398
ALLEY 1
PARK
385
OPEN SPACE
WELL
OS
86
OPEN OPEN
OPENOPENOPEN
OPENO
P
E
N
72
71
70
69
68
67
66
65
64
63
62
61
60
59
58
57
56
55
54
53
52
51
50
49
48
47
46
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
1413121110987654321
ALLEY 1
41
44 43
42
45
73
74
75
76
77
78
79
80
81
82
83
84
85
87
88
89
90
91
92
93
94
95
96
97
98
99100101102103104105106107108109110111
112 113 114 115 116 117 118 119 120 121 122 123 124
125
126
127
128
129
130
131
132133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150151
152
153
154
155
156
157
158
159
160 161 162 163 164 165 166 167 168 169
170171172173174175176177178179180
181 182 183 184 185 186 187 188 189 190
191192193194195196197198199200
OPEN
OPENOPEN OPEN
PARKALLEY 250+00
31+00
32+00
33+00
34+00
35+00
36+00
37+00
38+00
39+0040+0041+0042+0043+0044+0045+0046+0047+0048+0049+00
345342345
34210+0029+002
3
4
522
6
7
10
27
21
30
29
3231
3433
37364646
43
47 49
48
51
19 20
52
53
18
17
54
55
58
57
98
72 73
59
61
60
74
11
63
62
13
15
68
67
16
70
69
71
75 76
78
77
40
39
38
64
23
56
79
83
81
41
10a
outfall
12
15
17a19a
21a
blvd 22
TAHOMA TERRA PH II, DIV II (aka DIV 5&6), PHASE 2
CONVEYANCE BASIN EXHIBIT
DATE: 5/26/2020
CONNECTION TO TAHOMA
BOULEVARD STORM
CONVEYANCE SYSTEM
EXISTING INFILTRATION POND EXISTING WET POND
TAHOMA BOULEVARD
CB 12 BASIN
CB 55 BASIN
CB 51 BASIN
CB 13 BASIN
CB 71 BASIN
CB 81 BASIN
CB 34 BASIN
CB 58 BASIN
CB 21A BASIN
CB 61 BASIN
WELL 1A
BASIN DIV 3&4DIV 5&6
Sub-Basin/ Tributary Inlet ## of Roofs tributary to Sub-Basin1Basin Boundary AreaTotal Area2RoadsRoof AreaDriveways(incl. all Lot Impervious)SidewalkLawn/LandscapeTotal Impervious55 17 2.5632.5210.2580.714 0.207 0.083 1.2581.26371273.1743.4680.6041.1340.2300.1811.3202.14951285.3985.3140.7281.1760.3450.2722.7932.52134345.7185.7180.6111.4280.3910.2183.0702.64881242.6062.8580.3531.0080.2070.1491.1411.71761231.1121.7840.2950.9660.0810.0960.3471.43713254.0774.0350.5911.0500.2990.2121.8832.15258112.6382.6380.5560.4620.1270.1581.3351.30221a04.8624.8622.0990.0000.0000.2722.4912.370127638.20831.5725.1273.1922.6911.57818.98412.588sub-totals26570.35564.76911.22111.1304.5773.21934.62230.147Pond Area9.9069.9061.4040008.5021.404Total Area to Ponds = 74.67512.62511.1304.5773.21943.12431.5511. # of roofs tributary to sub-basins based on roof drain connections to storm system. Div 3&4 has 133 lots with roof dry wells.2. Total area = basin boundary area + roof area for lots outside basin but tributary to basin SD - Roof area for lots in basin w/ roof drain connection to another basinBasin Area (Acres)Existing Storm Ponds Sub-Basin Areasto drywell or to another sub-basin.
Appended on: Friday, May 22, 2020 9:11:50 AM
B-CB 55 Event Summary
Record Id: B-CB 55
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.3387 8.00 0.1144 2.521 SBUH
2 yr 24 hr 0.5578 8.00 0.2071 2.521 SBUH
25 year 1.0901 8.00 0.4383 2.521 SBUH
100 year 1.3001 8.00 0.5226 2.521 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If
some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 1.258 ac DCIA 1.263 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 26.4383 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)1.258 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 195.00 ft 1.5%0.15 2.00 in 23.7246 min
Shallow Paved 122.00 ft 1.05%0.01 0.9761 min
Int Channel Concrete pipe (n=0.012)280.00 ft 0.4%0.012 1.7376 min
Pervious TC 26.4383 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)1.263 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Smooth Surfaces. 0.011 17.00 ft 2.0%0.011 0.00 in 0.3714 min
Shallow Paved 255.00 ft 1.05%0.01 2.0403 min
Int Channel Concrete pipe (n=0.012)280.00 ft 0.4%0.012 1.7376 min
Pervious TC 4.1493 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:58:56 AM
B-CB 71 Event Summary
Record Id: B-CB 71
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.5762 8.00 0.193 3.469 SBUH
2 yr 24 hr 0.9491 8.00 0.3391 3.469 SBUH
25 year 1.8146 8.00 0.6841 3.469 SBUH
100 year 2.1394 8.00 0.8068 3.469 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If
some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 1.32 ac DCIA 2.149 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 20.4517 min DC TC 5.0251 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)1.32 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 110.00 ft 1.4%0.15 2.00 in 15.4266 min
Shallow Paved 135.00 ft 0.51%0.01 1.5499 min
Int Channel Concrete pipe (n=0.012)560.00 ft 0.4%0.012 3.4752 min
Pervious TC 20.4517 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)2.149 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 135.00 ft 0.51%0.01 1.5499 min
Int Channel Concrete pipe (n=0.012)560.00 ft 0.4%0.012 3.4752 min
Pervious TC 5.0251 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:56:01 AM
B-CB 51 Event Summary
Record Id: B-CB 51
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.6723 8.00 0.2288 5.314 SBUH
2 yr 24 hr 1.1084 8.00 0.418 5.314 SBUH
25 year 2.2158 8.00 0.896 5.314 SBUH
100 year 2.6637 8.00 1.0714 5.314 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If
some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 2.793 ac DCIA 2.521 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 20.6459 min DC TC 6.1243 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)2.793 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 110.00 ft 1.5%0.15 2.00 in 15.0067 min
Shallow Paved 80.00 ft 1.17%0.01 0.6064 min
Int Channel Concrete pipe (n=0.012)811.00 ft 0.4%0.012 5.0329 min
Pervious TC 20.6459 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)2.521 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 144.00 ft 1.17%0.01 1.0915 min
Int Channel Concrete pipe (n=0.012)811.00 ft 0.4%0.012 5.0329 min
Pervious TC 6.1243 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:55:27 AM
B-CB 34 Event Summary
Record Id: B-CB 34
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.6902 8.00 0.2406 5.718 SBUH
2 yr 24 hr 1.1394 8.00 0.4413 5.718 SBUH
25 year 2.2794 8.00 0.9514 5.718 SBUH
100 year 2.743 8.00 1.1391 5.718 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If some design
event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 3.07 ac DCIA 2.648 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 23.2436 min DC TC 8.2146 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)3.07 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 120.00 ft 1.7%0.15 2.00 in 15.3029 min
Shallow Paved 215.00 ft 0.56%0.01 2.3556 min
Int Channel Concrete pipe (n=0.012)900.00 ft 0.4%0.012 5.5852 min
Pervious TC 23.2436 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)2.648 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 240.00 ft 0.56%0.01 2.6295 min
Int Channel Concrete pipe (n=0.012)900.00 ft 0.4%0.012 5.5852 min
Pervious TC 8.2146 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 1:51:32 PM
B-CB 81 Event Summary
Record Id: B-CB 81
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.4604 8.00 0.1544 2.858 SBUH
2 yr 24 hr 0.7583 8.00 0.2724 2.858 SBUH
25 year 1.4419 8.00 0.5531 2.858 SBUH
100 year 1.6982 8.00 0.6533 2.858 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm
duration. If some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 1.141 ac DCIA 1.717 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 27.6955 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)1.141 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 170.00 ft 1.0%0.15 2.00 in 25.0015 min
Shallow Paved 94.00 ft 1.5%0.01 0.6293 min
Shallow Paved 210.00 ft 1.2%0.01 1.5717 min
Int Channel Concrete pipe (n=0.012)94.00 ft 0.56%0.012 0.493 min
Pervious TC 27.6955 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)1.717 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 175.00 ft 1.2%0.01 1.3098 min
Int Channel Concrete pipe (n=0.012)300.00 ft 1.3%0.012 1.0327 min
Pervious TC 2.3425 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 11:51:38 AM
B-CB 61 Event Summary
Record Id: B-CB 61
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.3853 8.00 0.1281 1.784 SBUH
2 yr 24 hr 0.6347 8.00 0.2181 1.784 SBUH
25 year 1.1742 8.00 0.4172 1.784 SBUH
100 year 1.3632 8.00 0.4857 1.784 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm
duration. If some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 0.347 ac DCIA 1.437 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 17.5883 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)0.347 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 102.00 ft 1.5%0.15 2.00 in 14.127 min
Shallow Paved 182.00 ft 0.58%0.01 1.9593 min
Int Channel Concrete pipe (n=0.012)248.00 ft 0.42%0.012 1.5019 min
Pervious TC 17.5883 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)1.437 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 185.00 ft 0.58%0.01 1.9916 min
Int Channel Concrete pipe (n=0.012)195.00 ft 1.57%0.012 0.6108 min
Int Channel Concrete pipe (n=0.012)248.00 ft 0.42%0.012 1.5019 min
Pervious TC 4.1044 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:54:25 AM
B-CB 13 Event Summary
Record Id: B-CB 13
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.5771 8.00 0.1944 4.035 SBUH
2 yr 24 hr 0.9505 8.00 0.3487 4.035 SBUH
25 year 1.8672 8.00 0.7272 4.035 SBUH
100 year 2.2267 8.00 0.8642 4.035 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If some design
event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 1.883 ac DCIA 2.152 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 18.8187 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)1.883 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 105.00 ft 1.5%0.15 2.00 in 14.4585 min
Shallow Paved 178.00 ft 0.5%0.01 2.0639 min
Int Channel Concrete pipe (n=0.012)404.00 ft 0.54%0.012 2.1578 min
Int Channel Concrete pipe (n=0.012)67.00 ft 3.6%0.012 0.1386 min
Pervious TC 18.8187 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)2.152 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 178.00 ft 0.5%0.01 2.0639 min
Int Channel Concrete pipe (n=0.012)404.00 ft 0.54%0.012 2.1578 min
Pervious TC 4.2217 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:58:19 AM
B-CB 58 Event Summary
Record Id: B-CB 58
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.3491 8.00 0.118 2.637 SBUH
2 yr 24 hr 0.575 8.00 0.2141 2.637 SBUH
25 year 1.1462 8.00 0.4547 2.637 SBUH
100 year 1.3752 8.00 0.5425 2.637 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If
some design event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 1.335 ac DCIA 1.302 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 18.5884 min DC TC 5.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)1.335 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 139.00 ft 1.6%0.15 2.00 in 17.6348 min
Shallow Paved 58.00 ft 1.0%0.01 0.4755 min
Int Channel Concrete pipe (n=0.012)96.00 ft 5.55%0.012 0.1599 min
Int Channel Concrete pipe (n=0.012)79.00 ft 0.95%0.012 0.3181 min
Pervious TC 18.5884 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)1.302 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 224.00 ft 0.5%0.01 2.5972 min
Int Channel Concrete pipe (n=0.012)316.00 ft 0.95%0.012 1.2725 min
Pervious TC 3.8697 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:54:55 AM
B-CB 21A Event Summary
Record Id: B-CB 21A
Licensed to: Debug License
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 0.6317 8.00 0.2148 4.861 SBUH
2 yr 24 hr 1.0414 8.00 0.3908 4.861 SBUH
25 year 2.0369 8.00 0.8322 4.861 SBUH
100 year 2.4313 8.00 0.9937 4.861 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If some design
event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 2.491 ac DCIA 2.37 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 28.7772 min DC TC 6.211 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)2.491 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 270.00 ft 1.9%0.15 2.00 in 28.0025 min
Shallow Paved 150.00 ft 2.52%0.01 0.7747 min
Pervious TC 28.7772 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)2.37 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 292.00 ft 1.0%0.01 2.394 min
Int Channel Concrete pipe (n=0.012)158.00 ft 0.79%0.012 0.6977 min
Int Channel Concrete pipe (n=0.012)63.00 ft 0.51%0.012 0.3462 min
Int Channel Concrete pipe (n=0.012)103.00 ft 1.86%0.012 0.2964 min
Int Channel Concrete pipe (n=0.012)656.00 ft 1.31%0.012 2.2495 min
Int Channel Concrete pipe (n=0.012)103.00 ft 3.17%0.012 0.2271 min
Pervious TC 6.211 min
Page 1 of 1
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
Appended on: Friday, May 22, 2020 8:51:57 AM
B-CB 12 Event Summary
Record Id: B-CB 12
Event Peak Q (cfs)Peak T (hrs)Hyd Vol (acft)Area (ac)Method
6-month 3.0782 8.00 1.1521 31.572 SBUH
2 yr 24 hr 5.0915 8.00 2.1689 31.572 SBUH
25 year 10.1964 8.00 4.8523 31.572 SBUH
100 year 12.3229 8.00 5.8557 31.572 SBUH
All results based on storm duration of 24.0 hours. This is ok if all precipitations are appropriate for the storm duration. If some design
event precipitations are for different duration storms, those results are incorrect
Design Method SBUH Rainfall type TYPE1a.rac
Hyd Intv 10.00 min Peaking Factor 484.00
Storm Duration 24.00 hrs Abstraction Coeff 0.20
Pervious Area 18.984 ac DCIA 12.588 ac
Pervious CN 68.00 DC CN 98.00
Pervious TC 38.2518 min DC TC 12.2275 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns,parks (>75% grass)18.984 ac 68.00
Pervious Composited CN (AMC 2)68.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Short prairie grass and lawns. 0.15 206.00 ft 1.3%0.15 2.00 in 26.2497 min
Shallow Paved 177.00 ft 0.7%0.01 1.7345 min
Int Channel Concrete pipe (n=0.012)528.00 ft 1.49%0.012 1.6977 min
Int Channel Concrete pipe (n=0.012)1192.00 ft 0.5%0.012 6.6163 min
Int Channel Concrete pipe (n=0.012)108.00 ft 1.83%0.012 0.3133 min
Int Channel Concrete pipe (n=0.012)216.00 ft 0.5%0.012 1.1989 min
Int Channel Concrete pipe (n=0.012)134.00 ft 1.42%0.012 0.4414 min
Pervious TC 38.2518 min
DCI - CN Calc
Description SubArea Sub cn
Impervious surfaces (pavements, roofs, etc)12.588 ac 98.00
DC Composited CN (AMC 2)98.00
DCI - TC Calc
Type Description Length Slope Coeff Misc TT
Shallow Paved 200.00 ft 0.7%0.01 1.9599 min
Int Channel Concrete pipe (n=0.012)528.00 ft 1.49%0.012 1.6977 min
Int Channel Concrete pipe (n=0.012)1192.00 ft 0.5%0.012 6.6163 min
Int Channel Concrete pipe (n=0.012)108.00 ft 1.83%0.012 0.3133 min
Int Channel Concrete pipe (n=0.012)216.00 ft 0.5%0.012 1.1989 min
Int Channel Concrete pipe (n=0.012)134.00 ft 1.42%0.012 0.4414 min
Pervious TC 12.2275 min
Page 1 of 2
5/22/2020file:///C:/Users/bene/Desktop/TT%205&6/Convayance.html
OUTFALL TO CB 3 - 25-YR EVENT
CB 3 TO CB 55 - 25-YR EVENT
CB 51 TO CB 71 - 25-YR EVENT
CB 3 TO CB 13 - 25-YR EVENT
CB 58 TO CB 81 - 25-YR EVENT
OUTFALL TO CB 3 - 100-YR EVENT
CB 3 TO CB 55 - 100-YR EVENT
CB 51 TO CB 71 - 100-YR EVENT
CB 3 TO CB 13 - 100-YR EVENT
CB 58 TO CB 81 - 100-YR EVENT