Loading...
Yelm Field RMS Plan Set - 2200807504030201010203040504030201010203040THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE APPROXIMATE ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT INCUR DUE TO THE CONTRACTOR'S FAILURE TO LOCATE EXACTLY AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. AHBL ASSUMES NO LIABILITY FOR THE LOCATION OF UNDERGROUND UTILITIES. FILL MATERIAL SHALL NOT CONTAIN PETROLEUM PRODUCTS, OR SUBSTANCES WHICH ARE HAZARDOUS, DANGEROUS, TOXIC, OR WHICH OTHERWISE VIOLATE ANY STATE, FEDERAL, OR LOCAL LAW, ORDINANCE, CODE, REGULATION, RULE, ORDER, OR STANDARD. AN AUTOCAD DRAWING FILE IS AVAILABLE TO ASSIST WITH SITE LAYOUT. PLEASE NOTE THAT ELECTRONIC FILES ARE PROVIDED FOR CONTRACTOR'S CONVENIENCE AND SHALL NOT REPLACE NOR BE USED TO SUBSTITUTE THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT LAYOUT ACCORDING TO CONTRACT DOCUMENTS AND COST FOR ELECTRONIC AUTOCAD FILES. PHONE: (253) 383-2422 FAX: (253) 383-2572 CONTACT: N GRAPHIC SCALE 0 50 100 1" = 50 FEET 25 EXISTING LEGEND: SET NAIL AND WASHER FOUND MONUMENT AS NOTED HUB AND TACK SET REBAR AND CAP BOLLARD MAIL BOX SIGN SANITARY SEWER MANHOLE SANITARY SEWER CLEANOUT STORM CATCH BASIN STORM MANHOLE ROOF DRAIN GAS METER GAS VALVE TRAFFIC SIGNAL POLE TRAFFIC CABINET POWER TRANSFORMER GUY ANCHOR UTILITY POWER POLE ELECTRICAL VAULT JUNCTION BOX POWER METER LUMINAIRE TELEPHONE RISER TELEPHONE VAULT FIRE DEPARTMENT CONNECTION FIRE HYDRANT IRRIGATION CONTROL VALVE HOSE BIB WATER METER WATER VALVE WATER VAULT A=APPLE, B=BIRCH, F=FIR, P=PINE, HA=HAWTHORNE HO=HOLLY, M=MAPLE, O=OAK, U= UNKNOWN STORM LINE SANITARY SEWER LINE GAS LINE ELECTRICAL LINE COMMUNICATIONS LINE WATER LINE IRRIGATION PER RECORD DRAWING OVERHEAD UTILITIES STEAM LINE FENCE CONCRETE ASPHALT CONTOUR MAJOR INTERVAL CONTOUR MINOR INTERVAL PROPERTY/RIGHT-OF-WAY LINE HB WV N 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON DATE: March 19, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-COVR.dwg C0.00 COVER SHEET 1 AHBL, INC. 2215 N. 30TH ST., SUITE 300 TACOMA, WA 98403 PHONE: (253) 383-2422 FAX: (253) 383-2572 CIVIL CONTACT: TODD SAWIN, P.E. YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 PH: (360) 458-6128 EMAIL: CHRIS_HANSEN@YCS.WEDNET.EDU CONTACT: CHRIS HANSEN AHBL, INC. 2215 N. 30TH ST., SUITE 300 TACOMA, WA 98403 PHONE: (253) 383-2422 FAX: (253) 383-2572 SURVEY CONTACT: DAVE FOLLANSBEE, PLS CLIENT SURVEY CIVIL SITE ADDRESS 909 MILL ROAD SOUTHEAST, YELM, WASHINGTON 98597 PARCEL NUMBER 21725140100 NAVD 1988 VERTICAL DATUM ON ORTHOMETRICALLY CORRECTED GPS OBSERVATIONS USING WSRN AND GEOID 2012A. VERTICAL DATUM NAD 1983/11 WASHINGTON STATE PLANE SOUTH PROJECTION, BASED ON GPS OBSERVATIONS USING WSRN AND GEOID 2012A. UNITS OF MEASUREMENT ARE US SURVEY FEET. BASIS OF BEARING IF WORKERS ENTER ANY TRENCH OR OTHER EXCAVATION FOUR OR MORE FEET IN DEPTH THAT DOES NOT MEET THE OPEN PIT REQUIREMENTS OF WSDOT SECTION 2-09.3(3)B, IT SHALL BE SHORED AND CRIBBED. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR WORKER SAFETY AND AHBL ASSUMES NO RESPONSIBILITY. ALL TRENCH SAFETY SYSTEMS SHALL MEET THE REQUIREMENTS OF THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT, CHAPTER 49.17 RCW. THE EXISTING CULTURAL AND TOPOGRAPHIC DATA SHOWN ON THESE DRAWINGS HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, AHBL CANNOT ENSURE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO THESE DRAWINGS AS A RESULT. TRENCH NOTE TOPOGRAPHIC NOTE UTILITY NOTE FILL SPECIFICATION AUTOCAD FILE PROPOSED IMPROVEMENTS TO BE BUILT IN A SINGLE PHASE CONSTRUCTION SEQUENCING TOTAL AREA PAVED/COVERED LAND: 143,185 SF TOTAL AREA DISTURBED ONSITE: 143,185 SF PROPOSED SURFACING PER YELM, WASHINGTON ARCGIS: 25-17-1E PT NE4 NKA TR B BLA-8144 2407/527 LEGAL DESCRIPTION Sheet List Table Sheet #Sheet Title C0.00 COVER SHEET C0.01 TOPOGRAPHIC SURVEY C1.00 TESC AND DEMOLITION PLAN C1.01 TESC AND DEMOLITION NOTES AND DETAILS C2.00 GRADING, DRAINAGE, AND UTILITY PLAN C2.01 DRAINAGE NOTES AND DETAILS C3.00 HORIZONTAL CONTROL AND SURFACING PLAN C3.01 SURFACE DETAILS RIDGELINE MIDDLE SCHOOL VICINITY MAP SCALE: 1" = 1/4 MILE (1,320') SITE LEGEND 2215 North 30th Street, Suite 200 Tacoma, WA 98403 253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES 82 DFGD JANUARY 11, 2021 2200807.50 DONNY JONES 2804 269TH AVENUE NE REDMOND, WA 98053 FIELDTURF YELM SCHOOL DISTRICT FIELD UPGRADES A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17 N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON. YELM SCHOOL DISTRICT FIELD UPGRADES C0.01 TOPOGRAPHIC SURVEY UTILITY NOTES EQUIPMENT USED SURVEYOR'S CERTIFICATE N GRAPHIC SCALE 0 20 40 FEET 1" = 20 FEET 10 VERTICAL DATUM BASIS OF BEARING 356356IP IP IP IP IP IP IP IP CL CL CL CL SF SF SF REMOVE EXISTING SAND BOX REMOVE EXISTING SAND BOX REMOVE EXISTING RUBBER TRACK REMOVE EXISTING TRACK SURFACING REMOVE EXISTING GOAL POST REMOVE EXISTING GOAL POST REMOVE EXISTING SHOT-PUT PAD AND THROWING AREA REMOVE EXISTING DISCUS PAD, POSTS, AND CAGE HYDROSEED ALL DISTURBED AREAS REMOVE ALL EXISTING UTILITIES WITHIN FIELD AREA PROTECT EXISTING TRACK CURBING PROTECT EXISTING TRACK CURBING PROTECT EXISTING UTILITY REMOVE EXISTING CONCRETE SIDEWALK. PROTECT EXISTING STAIRS. REMOVE EXISTING CONCRETE SIDEWALK. PROTECT EXISTING STAIRS. REMOVE EXISTING CURB PROTECT EXISTING CURB REMOVE EXISTING CURB 77.3' 28.9' 17.5' REMOVE EXISTING CURB PROTECT EXISTING IRRIGATION PROTECT EXISTING IRRIGATION EXISTING GRAVEL ACCESS ROAD SHALL BE PROTECTED AND UTILIZED AS STABILIZED CONSTRUCTION ENTRANCE CLEARING LIMITS TESC LEGEND FILTER FABRIC FENCE CL FF REMOVE EXISTING UTILITY IP INLET PROTECTION 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON GRAPHIC SCALE 0 30 60 1" = 30 FEET 15 N DATE: March 19, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-TESC.dwg C1.00 TESC AND DEMOLITION PLAN 2 PER BMP C120 (TEMPORARY AND PERMANENT SEEDING) OF THE 2012 WASHINGTON STATE DEPARTMENT OF ECOLOGY DOE STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON: 1.BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND SEDIMENTATION BASINS. 2.THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING SURFACE ROUGHENING. 3.TEMPORARY SEEDING SHALL BE THE FOLLOWING MIXTURE APPLIED VIA BROADCAST APPLICATION: 40% CHEWINGS FESCUE (FESTUCA RUBRA VAR. COMMUTATA OR POD ANNA) 50% PERENNIAL RYE (LOLIUM PERENNE) 10% REDTOP OR COLONIAL BENTGRASS (AGROSTIS ALBA OR AGROSTIS TENUIS) SEED MIX SHALL NOT CONTAIN CLOVER (TRIFOLIUM REPENS) REFER TO LANDSCAPE PLANS FOR PERMANENT SEED MIX. ALTERNATIVE SEED MIXES APPROVED BY THE ENGINEER MAY BE USED. 4.TEMPORARY SEED INSTALLED BY HAND SHALL BE: a.COVERED BY STRAW, MULCH, OR TOPSOIL b.APPLIED AT A RATE OF 120 POUNDS PER ACRE, WHICH CAN BE REDUCED IF SOIL AMENDMENTS OR SLOW-RELEASE FERTILIZERS ARE USED. 5.THE OPTIMUM SEEDING WINDOWS FOR WESTERN WASHINGTON ARE APRIL 1 THROUGH JUNE 30 AND SEPTEMBER 1 THROUGH OCTOBER 1. 6.SEED BEDS PLANTED BETWEEN BETWEEN JULY 1 AND AUGUST 30 WILL REQUIRE IRRIGATION UNTIL 75 PERCENT GRASS COVER IS ESTABLISHED. OTHER MAINTENANCE WILL BE REQUIRED AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. 7.SEED BEDS PLANTED BETWEEN OCTOBER 1 AND MARCH 30 WILL REQUIRE A COVER OF MULCH WITH STRAW OR AN EROSION CONTROL BLANKET UNTIL 75 PERCENT GRASS COVER IS ESTABLISHED. ARMORING OF THE SEED BED WILL BE NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING). 9.REVIEW ALL DISTURBED AREAS IN LATE AUGUST TO EARLY SEPTEMBER AND COMPLETE ALL SEEDING BY THE END OF SEPTEMBER. OTHERWISE, VEGETATION WILL NOT ESTABLISH ITSELF ENOUGH TO PROVIDE MORE THAN AVERAGE PROTECTION. 10.FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. TEMPORARY SEEDING NOTES FOR EROSION CONTROL 1.PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE REQUIREMENTS OF THE WSDOT STANDARD SPECIFICATIONS SECTION 9-14.5. 2.COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12 INCH OVERLAP OF ALL SEAMS. 3.CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED. 4.WHEN THE COVERING IS USED ON UN-SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE NEXT SEEDING PERIOD. 5.PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS. 6.PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. PLASTIC COVERING NOTES: 3 C1.01 2 C1.01 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON C1.01 TESC AND DEMOLITION NOTES AND DETAILS 3 1.CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL UTILITIES HAVE BEEN DISCONNECTED PRIOR TO COMMENCING DEMOLITION. 2.DEMOLITION: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO INCLUDE THE DEMOLITION OF ALL EXISTING BUILDINGS, PAVING, UTILITIES AND OTHER EXISTING SITE IMPROVEMENTS INCLUDING THEIR UNDERGROUND COMPONENTS AS INDICATED BY THIS DRAWING AND AS REQUIRED FOR NEW CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY REVIEW THE SITE CONDITIONS AND TO CORRELATE THESE OBSERVATIONS WITH THE PROJECT WORK AND INCLUDE ALL NECESSARY DEMOLITION, WHETHER SHOWN OR NOT, AND INCLUDE ALL SUCH COSTS IN THE BASE BID. 3.CLEARING: IT IS THE INTENT OF THE WORK UNDER THIS CONTRACT TO CONDUCT ALL CLEARING NECESSARY TO BE ABLE TO COMPLETE ALL THE WORK OF THIS PROJECT. 4.CONTRACTOR SHALL LEGALLY DISPOSE OF THE OWNER'S PROPERTY, ALL DEMOLISHED AND REMOVED MATERIALS, UNLESS INDICATED OTHERWISE. 5.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLETELY COORDINATE UTILITY DEMOLITION WITH NEW CONSTRUCTION. CONTRACTOR SHALL ENSURE THAT ADEQUATE FIRE PROTECTION IN ACCORDANCE WITH THE FIRE MARSHALL REQUIREMENTS IS PROVIDED FOR THE NEW BUILDING. 6.COORDINATE POWER DEMOLITION WITH THE CITY OF YELM AND ELECTRICAL PLANS. CONTRACTOR TO ENSURE THAT DEMOLITION OF LINES WILL NOT COMPROMISE POWER TO OTHER AREAS. 7.POWER AND CABLE SERVING BUILDINGS AND LIGHT POLES TO REMAIN RUN THROUGH THIS SITE. CONTRACTOR SHALL INSTALL NEW SERVICES TO BUILDINGS AND LIGHT POLES REMAINING PRIOR TO DEMOLISHING EXISTING LINES. 8.GAS DISCONNECTION BY P.S.E. CONTRACTOR TO COORDINATE WORK WITH PSE. CONTRACTOR TO DEMOLISH ABANDONED SERVICE. CONTRACTOR TO ENSURE THAT DEMOLITION OF GAS LINES WILL NOT IMPACT GAS SERVICE TO OTHER AREAS. NO DISRUPTION IN SERVICE ALLOWED. 9.ANY ABANDONED SIDE SEWER(S) SHALL BE PLUGGED OR CAPPED AT THE RIGHT-OF-WAY OR PROPERTY LINE. 10.CONTRACTOR SHALL MINIMIZE DUST GENERATION ONSITE BY SPRINKLING THE SITE WITH WATER UNTIL SURFACE IS WET. SEE BMP C140. 11.SAWCUT CONCRETE SIDEWALK AT THE NEAREST JOINT. 12.REMOVAL OF THE EXISTING UNDERGROUND OIL TANK AND ASSOCIATED APPURTENANCES REQUIRES AN UNDERGROUND STORAGE TANK (UST) REMOVAL PERMIT FROM THURSTON COUNTY HEALTH DEPARTMENT. 13.REFER TO LANDSCAPE ARCHITECTURE DRAWINGS FOR INVASIVE SPECIES REMOVAL REQUIREMENTS AND TREE PROTECTION REQUIREMENTS. 14.REFER TO HAZARDOUS MATERIAL DRAWING H1.10 FOR LEAD AND ARSENIC SOIL MIXING REQUIREMENTS. 15.THE CLEARING LIMITS DEPICTED ON THESE PLANS REPRESENT THE EDGE OF CIVIL-RELATED WORK SUCH AS GRADING, UTILITY, STORM DRAINAGE, AND PAVING IMPROVEMENTS. WORK SUCH AS ARSENIC AND LEAD SOIL REMEDIATION AND ASSOCIATED STABILIZATION AND INVASIVE SPECIES REMOVAL MAY OCCUR BEYOND THE CLEARING LIMITS. REFER TO THE HAZARDOUS MATERIAL DRAWINGS AND LANDSCAPE ARCHITECTURE DRAWINGS FOR ADDITIONAL INFORMATION. 16.ALL MONUMENTS DISTURBED AS A RESULT OF CONSTRUCTION ACTIVITIES SHALL BE REPLACED PER WAC 332-120 AT NOT ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL APPLY FOR PERMIT FROM THE DEPARTMENT OF NATURAL RESOURCES AS NECESSARY. DEMOLITION NOTES 8' MAX. 1 1 PROVIDE SAND BAGS 10' O.C. TO HOLD PLASTIC COVERING IN PLACE STOCKPILE AREA EXISTING GRADE 1 1 NOTES: 1.STOCKPILES SHALL BE STABILIZED WITH PLASTIC COVERING OR OTHER APPROVED DEVICE. 2.SEDIMENT LEACHING FROM STOCKPILES SHALL BE PREVENTED DURING ALL SEASONS. 1 NOT TO SCALE STOCKPILE 48"36" GEOTEXTILE FABRIC OVERFLOW (TO BYPASS PEAK STORM VOLUMES) 24" EXISTING CATCH BASIN SEDIMENT ACCUMULATION NOTES: 1.FILTERS SHALL BE i NSPECTED AFTER EACH STORM EVENT AND CLEANED OR REPLACED WHEN 1/3 FULL. 2.INSTALL INLET PROTECTION IN ALL NEW STORM STRUCTURES THAT WILL COLLECT STORMWATER AS THEY ARE INSTALLED. ADAPTOR SKIRT RETRIEVAL STRAP 2" X 4" WOOD POSTS, STANDARD OR BETTER, OR STEEL FENCE POST BURY BOTTOM OF FILTER MATERIAL IN 8"X12" TRENCH 2" X 4" BY 14 GA. WIRE FABRIC OR EQUIVALENT ORANGE FILTER FABRIC MATERIAL 60" WIDE ROLLS - USE RINGS TO ATTACH ATTACH TO WIRE FABRIC 2" X 4" WOOD POST OR STEEL FENCE POST PROVIDE 3/4" - 1 1/2" WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OF FILTER FENCE FABRIC ON THE SURFACE 2" X 2" BY 14 GA. WIRE FABRIC OR EQUIVALENT, AFFIX TO POST FILTER FABRIC MATERIAL MIRAFI 100 NS OR EQUIVALENT SIDE VIEW FRONT VIEW CHAINLINK FENCE 6' MAX. EXISTING GRADE2.0'2.5'5.0'8" 2.0' MIN.5.0'1.0'2.0'0.5'2 NOT TO SCALE INLET PROTECTION 3 NOT TO SCALE SILT FENCE 1.MULCH MATERIALS USED SHALL BE STRAW AND SHALL BE APPLIED AT THE RATE OF 1.5 TO 2.5 TONS/ACRE MIN 2" THICK. 2.MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1. 3.MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. 4.ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER FIRST (1). 1.STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) DAILY BETWEEN NOVEMBER 1 AND MARCH 31. 2.IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. 3.TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. 4.PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE APPROVED PLAN. 5.ALL STOCKPILES SHALL BE COVERED WITH PLASTIC COVERING. SEE PLASTIC COVERING NOTES ON THIS SHEET. SOIL STOCKPILE NOTES MULCHING NOTES: 1.ON-SITE EROSION CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE OF THE STORM SYSTEM BY THE OWNER, SHALL BE CORRECTED BY THE CONTRACTOR. 2.IN CASE EROSION OR SEDIMENTATION OCCURS TO ADJACENT PROPERTY, ALL CONSTRUCTION WORK THAT WILL AGGRAVATE THE SITUATION MUST CEASE AND THE CONTRACTOR SHALL IMMEDIATELY COMMENCE RESTORATION OR MITIGATION MEASURES. RESTORATION ACTIVITY SHALL CONTINUE UNTIL SUCH TIME AS THE PROBLEM IS RECTIFIED. 3.ALL APPLICABLE EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THESE DRAWINGS SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OF SITE PREPARATION FOR SAID PHASE OF CONSTRUCTION 4.THE CITY OF YELM AND OWNER/ENGINEER SHALL BE RESPONSIBLE FOR THE INSPECTION AND ACCEPTANCE OF ALL CLEARING AND GRADE WORK AND EROSION EROSION AND SEDIMENTATION CONTROL FACILITIES. 5.THE APPLICANT AND/OR CONTRACTOR SHALL NOTIFY THE CITY OF YELM AND OWNER/ENGINEER FORTY-EIGHT HOURS IN ADVANCE OF EACH REQUIRED EROSION AND SEDIMENTATION CONTROL INSPECTION: INSPECTION NO.1 - INSTALLATION OF EROSION CONTROL FACILITIES/PRIOR TO CLEARING INSPECTION NO.2 - COMPLETION OF CLEARING INSPECTION NO.3 - UPON COMPLETION OF EXCAVATION, FILLING, AND EARTHWORK. INSPECTION NO.4 - COMPLETION OF PROJECT INSPECTION NO.5 - AS NEEDED TO DETERMINE COMPLIANCE WITH APPROVED PLANS AND/OR SPECIFICATIONS (DOES NOT REQUIRE ADVANCED NOTICE). 6.ALL WORK ASSOCIATED WITH THE STABILIZING THE DISTURBED AREAS SHALL BE IN ACCORDANCE WITH THE 2014 WASHINGTON STATE DEPARTMENT OF ECOLOGY DOE STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON. 7.ALL NECESSARY FACILITIES SHALL BE MAINTAINED ON SITE TO PREVENT DEBRIS, DUST, AND MUD FROM ACCUMULATING ON THE PUBLIC RIGHT-OF-WAY. 8.THE CONTRACTOR SHALL ADHERE TO STORMWATER POLLUTION PREVENTION PLAN (SWPPP). THE SWPPP AND THE CONSTRUCTION GENERAL PERMIT (CGP) MUST BE FOLLOWED AS APPROPRIATE UNTIL FINAL STABILIZATION HAS OCCURRED. THE SWPPP IS A LIVING DOCUMENT AND MUST BE UPDATED WHEN SITE CONDITIONS CHANGE. 9.CONTRACTOR TO HAVE WATER TRUCK ONSITE DURING CONSTRUCTION TO CONTROL DUST. WATER SITE AS NECESSARY TO CONTROL DUST. OWNER AND ENGINEER WILL HAVE AUTHORITY TO STOP CONSTRUCTION IF DUST IS NOT ADEQUATELY CONTROLLED. 10.CONTRACTOR TO DETERMINE AREAS FOR LAY DOWN, STOCK PILE, TRAILERS & PARKING. COORDINATE WITH GC/CM. 11.CONTRACTOR TO REMOVE CONSTRUCTION DEBRIS, MUD, ROCKS, DIRT, ETC FROM EXISTING ROAD DAILY. 12.PROVIDE INLET PROTECTION AS NEW CATCH BASINS/AREA DRAINS ARE CONSTRUCTED. 13.CONTRACTOR SHALL ACCEPT, MAINTAIN, AND REMOVE AT PROJECT COMPLETION ALL EXISTING TESC MEASURES CURRENTLY INSTALLED ONSITE. 14.COORDINATE ALL EARTHWORK ACTIVITIES WITH GEOTECHNICAL ENGINEER. SEE GEOTECHNICAL REPORT PREPARED BY LANDAU ASSOCIATES DATED AUGUST 1, 2019 REGARDING RECOMMENDATIONS FOR STRIPPING DEPTH, SUBGRADE PREPARATION, UTILITY TRENCH EXCAVATION, CONSTRUCTION DEWATERING, REUSE OF ONSITE MATERIALS AS STRUCTURAL FILL, AND STRUCTURAL FILL PLACEMENT AND COMPACTION. 15.ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLANS SHALL BE CLEARLY FLAGGED BY THE PROJECT SURVEYOR IN THE FIELD AND OBSERVED DURING CONSTRUCTION. 16.ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES, AND PROTECTIVE MEASURES FOR CRITICAL AREAS AND SIGNIFICANT TREES SHALL BE INSTALLED PRIOR TO INITIATING ANY CONSTRUCTION ACTIVITIES. 17.ALL REQUIRED SEDIMENTATION AND EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO ANY LAND CLEARING AND/OR OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER ANY EXISTING DRAINAGE SYSTEM. THE CONTRACTOR SHALL SCHEDULE AN INSPECTION OF THE EROSION CONTROL FACILITIES PRIOR TO ANY LAND CLEARING AND/OR OTHER CONSTRUCTION. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION AS DETERMINED BY THE E.S.C.L UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON-SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, AND ADDITIONS TO THE EROSION AND SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 18.THE EROSION AND SEDIMENTATION CONTROL SYSTEM FACILITIES DEPICTED ON THESE PLANS ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR STORM DRAINAGE SYSTEMS. 19.ANY DISTURBED AREA WHICH HAS BEEN STRIPPED OF VEGETATION AND WHERE NO FURTHER WORK IS ANTICIPATED FOR A PERIOD OF 7 DAYS OR MORE DURING THE DRY SEASON (MAY 1-SEPT 30) OR 2 DAYS OR MORE IN THE WET SEASON (OCT 1-APR 30), SHALL BE IMMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING, OR OTHER APPROVED EROSION CONTROL TREATMENT APPLICABLE TO THE TIME OF YEAR IN QUESTION. GRASS SEEDING ALONE WILL BE ACCEPTABLE ONLY DURING THE MONTHS OF MAY THROUGH SEPTEMBER INCLUSIVE. SEEDING MAY PROCEED OUTSIDE THE SPECIFIED TIME PERIOD WHENEVER IT IS IN THE INTEREST OF THE CONTRACTOR BUT SHALL BE AUGMENTED WITH MULCHING, NETTING, OR OTHER TREATMENT APPROVED BY THE ENGINEER. 20.NO TEMPORARY OR PERMANENT STOCKPILING OF MATERIALS OR EQUIPMENT SHALL OCCUR WITHIN CRITICAL AREAS OR ASSOCIATED BUFFERS, OR THE CRITICAL ROOT ZONE FOR VEGETATION PROPOSED FOR RETENTION. GENERAL EROSION CONTROL NOTES 504030201010203040504030201010203040356327 LF 8" PERF. PVC @ 0.20% 319 LF 8" PERF. PVC @ 0.20%56 LF 12 " CPEP @ 5 .84% HP: 356.27 HP: 356.28 HP: 356.29 MATCH EG: 355.79± MATCH EG: 355.78± MATCH EG: 355.79± MATCH EG: 355.79± 0.5% M A X 0.5% M A X 0.5% M A X 0.5% M A X 0.5% M A X 0.5% M A X 0.53%0.5 3 %0.54%0.5 5 % PROVIDE POSITIVE DRAINAGE TO EXISTING CB ADA LEVEL LANDING. SLOPE CANNOT EXCEED 2% IN ANY DIRECTION. ADA LEVEL LANDING. SLOPE CANNOT EXCEED 2% IN ANY DIRECTION. ADA ACCESSIBLE ROUTE. CROSS SLOPE CANNOT EXCEED 2%, RUNNING SLOPE CANNOT EXCEED 5%. ADA ACCESSIBLE ROUTE. CROSS SLOPE CANNOT EXCEED 2%, RUNNING SLOPE CANNOT EXCEED 5%. PROVIDE TURFCOOL QUICK CONNECT VALVE BOX MODEL NUMBER TC-3700-GCV BY SPORTSFIELD SPECIALTIES PROVIDE TURFCOOL QUICK CONNECT VALVE BOX MODEL NUMBER TC-3700-GCV BY SPORTSFIELD SPECIALTIES PROVIDE TURFCOOL QUICK CONNECT VALVE BOX MODEL NUMBER TC-3700-GCV BY SPORTSFIELD SPECIALTIES PROVIDE TURFCOOL QUICK CONNECT VALVE BOX MODEL NUMBER TC-3700-GCV BY SPORTSFIELD SPECIALTIES 110 LF 1"Ø POLY PIPE 94 LF 1"Ø POLY PIPE 81 LF 1"Ø POLY PIPE 94 LF 1"Ø POLY PIPE 239 LF 1"Ø POLY PIPE 192 LF 1"Ø POLY PIPE CONNECT TO EXISTING IRRIGATION AND IRRIGATION CONTROL MATCH EG: 355.37± MATCH EG: 355.38± MATCH EG: 355.41± MATCH EG: 355.36± MATCH EG: 355.34± MATCH EG: 355.38± MATCH EG: 355.35± MATCH EG: 355.37± MATCH EG: 355.12± MATCH EG: 355.61± MATCH EG: 355.66± MATCH EG: 355.70± MATCH EG: 355.77± MATCH EG: 355.41± MATCH EG: 355.42± MATCH EG: 355.40± MATCH EG: 355.39± 355.40 355.32 MATCH EG: 355.38± 355.47 355.56 SDCO 02, CLEANOUT RIM: 355.79 IE: 353.16 8" (SE) SDCO 03, CLEANOUT RIM: 355.80 IE: 353.17 8" (SE) SDCO 04, CLEANOUT RIM: 355.84 IE: 353.81 8" (NW) IE: 353.81 8" (SE) SDCO 05, CLEANOUT RIM: 355.73 IE: 353.81 8" (SE) IE: 353.81 8" (NW) OUTLET 1 IE: 349.24 12" (SE) CONNECT TO EXISTING IRRIGATION AND IRRIGATION CONTROL SDCO 06, CLEANOUT RIM: 355.80 IE: 354.13 8" (NE) IE: 354.13 8" (SW) 161 LF 8" PERF. PVC @ 0.20% 163 LF 8" PERF. PVC @ 0.20% 161 LF 8" 8" CPEP @ 0.20% 168 LF 8" 8" CPEP @ 0.20% SDCO 01, CLEANOUT RIM: 355.80 IE: 352.83 8" (SW) IE: 352.83 8" (NE) IE: 352.50 12" (NW) PROPOSED MINOR CONTOUR LEGEND PROPOSED MAJOR CONTOUR SPOT ELEVATION SLOPE 361 360 OR 3:11.0% HIGH POINT SPOT ELEVATION STORM DRAIN PIPE CLEANOUT GRADE BREAK LINE IRRIGATION LINE UNDERDRAIN LINE 360.00 HP: 360.00 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON GRAPHIC SCALE 0 30 60 1" = 30 FEET 15 N DATE: March 18, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-GRAD.dwg C2.00 GRADING, DRAINAGE, AND UTILITY PLAN 4 3 C2.01 5 C2.01 4 C2.01 4 C2.01 1 C2.01 1 C2.01 2 C2.01 1 C2.01 1 C2.01 1 C2.01 1 C2.01 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON DATE: March 19, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-DETL.dwg C2.01 DRAINAGE NOTES AND DETAILS 5 INLET PIP E INLET/OUTFALL PIPE OUTFALL P I P E *8' 2'DIA. + 4'* UNLESS OTHERWISE NOTED ON PLANS EXISTING AND/OR PROPOSED GROUND 4" MIN. FACE QUARRY ROCK 12" MIN. DEPTH (12"Ø PIPE) 18" MIN. DEPTH (15"-18"Ø PIPE) 24" MIN. ( 24"-30"Ø PIPE) 8" PERFORATED DRAIN PIPE SEE NOTES ON SHEET C3.2 DAYLIGHT FLAT DRAIN PIPE INTO PERFORATED DRAIN PIPE TRENCH. FOREVERLAWN PER SECTIONS ON SHEET C2.1. HYDRAWAY DRAIN 2000 (1"x12") FLAT DRAIN SLOPE PER PLAN UPPER 2' OF DRAIN PIPE TRENCH WALLS SHALL BE EXCAVATED AT A 1:1 SLOPE (TYP) MIRAFI 140N NON-WOVEN GEOTEXTILE, OR APPROVED EQUIVALENT, UNDER ENTIRE FOREVERLAWN AREA. 24" 6" (MIN) GRAVEL BACKFILL FOR DRAINS PER WSDOT 9-03.12(4) EXISTING SUBGRADE FOREVERLAWN PER SECTIONS ON SHEET C2.1. HYDRAWAY DRAIN 2000 (1"x12") FLAT DRAIN 3" (MIN) 5" (MIN)6" MIRAFI 140N NON-WOVEN GEOTEXTILE, OR APPROVED EQUIVALENT. 1 NOT TO SCALE COLLECTOR DRAIN CROSS SECTION 2 NOT TO SCALE HYDRAWAY DRAIN 2000 3 NOT TO SCALE RIP RAP OUTLET PROTECTION CAST IRON RING AND LOCKING COVER 7-3/4" 15" 8-3/4" 7" 9" 10" 5/8" 1'-0" 12"Ø 1" 4-3/4" 2'-0" SEWER 1/2" NOTES: 1. PIPE MATERIAL PER PLAN. 2. PIPE DIAMETER PER PLAN. 3. ABS TO PVC USE PVC ADAPTOR OR FERNCO W/STAINLESS STEEL CLAMPS OR APPROVED EQUAL. 4. PVC TO CAST IRON OR CONCRETE USE FERNCO W/STAINLESS STEEL CLAMPS OR APPROVED EQUAL. PROVIDE WATER TIGHT PLUG FIBRE JOINT PACKING 45° (1/8) BEND 3000 psi CLASS C CONCRETE (TYP) PIPE BEDDING PER W.S.D.O.T. 9-03.12, (3) PAVEMENT BASE COURSE AND SUBBASE PER PLAN FLEXIBLE (CPEP, CMP, PVC) RIGID (D.I., CONC.) 1.5 X I.D. + 18" 24" MIN. PIPE AS SPECIFIED ON PLAN OR SPECS. 6" MIN.DIA.6"8" TYP NOTES: 1.BACKFILL MATERIAL SHALL NOT HAVE ROCKS OR PARTICLES LARGER THAN 1" WITHIN 12" OF THE PIPE. BACKFILL MATERIAL SHALL BE PLACED IN 8" MAXIMUM LOOSE LIFTS AND COMPACTED TO 95% MAXIMUM DRY DENSITY PER MODIFIED PROCTOR TEST (ASTM D-1557). 2.CONSTRUCT ALL STORM AND ROOF DRAINS IN CONFORMANCE WITH THIS DETAIL UNLESS NOTED OTHERWISE ON THE PLANS. 3.ALL TRENCH EXCAVATIONS SHALL BE SLOPED, SHORED, SHEETED, BRACED, OR OTHERWISE SUPPORTED IN COMPLIANCE WITH OSHA REGULATION AND LOCAL ORDINANCES. 4.IF ORGANIC MATERIAL IS ENCOUNTERED DURING UTILITY EXCAVATION, OVEREXCAVATE TRENCH TO INCREASE PIPE BEDDING DEPTH TO 18" OR MORE AS REQUIRED TO COMPACT BEDDING TO FIRM AND UNYIELDING CONDITION. BACKFILL WITH BANK RUN GRAVEL FOR TRENCH BACKFILL PER WSDOT 9-03.19 OR SUITABLE NATIVE MATERIAL0.15 x DIA. OR 4" MIN. "SEWER" LETTERING FOR SANITARY SEWER, "CO" LETTERING FOR STORM DRAINAGE 1/8" RAISE - 1/2" WIDE BORDER 4" DRILL & TAP (SPLITTING THE SEAM) SET MADE BOLT-DOWN WITH 3/8" STAINLESS STEEL ALLEN-HEAD BOLTS - 2 PLACES 4 NOT TO SCALE STORM AND UTILITY TRENCH 5 NOT TO SCALE CLEANOUT 504030201010203040504030201010203040SHOT-PUT PAD DISCUS PAD PROVIDE TFDCHS DISCUS CAGE BY SPORTSFIELD SPECIALTIES OR APPROVED EQUIVALENT JUMPFOAM LONG JUMP SAND PITS BY SPORTSFIELD SPECIALTIES MODEL SP6020 OR APPROVED EQUIVALENT. PROVIDE TFLT008SS 8" TAKE-OFF BOARDS BY SPORTSFIELD SPECIALTIES OR APPROVED EQUIVALENT. (TYP.) PROVIDE HJ168DZ DURAZONE HIGH JUMP LANDING PAD SYSTEM BY SPORTSFIELD SPECIALTIES OR APPROVED EQUIVALENT PROVIDE GOAL POST AND SOCCER GOAL TO BE SPORTSFIELD SPECIALTIES MODEL SG4985HSPL ROUND FACED GOAL PAK WITH PLATE MOUNTING. COORDINATE LOCATION WITH FIELDTURF AND OWNER (TYP.) N 590069.54 E 1111342.35 N 590491.96 E 1111333.32 N 590280.26 E 1111337.17 N 590089.69 E 1111478.72 N 590426.15 E 1111169.62 N 590508.89 E 1111207.35 N 590149.82 E 1111502.37 N 590056.34 E 1111373.19 EXISTING POND EXISTING PARKING LOT RUBBER TRACK SURFACING OVER ASPHALT CONCRETE SIDEWALK TURF SECTION SAND SECTION LEGEND 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON GRAPHIC SCALE 0 30 60 1" = 30 FEET 15 N DATE: February 8, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-HZ.dwg C3.00 HORIZONTAL CONTROL AND SURFACING PLAN 6 1 C3.01 2 C3.01 3 C3.015 C3.01 4 C3.01 6 C3.01 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX YELM SCHOOL DISTRICT FIELD UPGRADES RIDGELINE MIDDLE SCHOOL YELM SCHOOL DISTRICT #2 404 E YELM AVE YELM, WA 98597 CHRIS HANSEN 2200807.10 03/18/2021 PERMIT SET CHS SBK TCS 8 YELM SCHOOL DISTRICT FIELD UPGRADES- RIDGELINE MIDDLE SCHOOL A PORTION OF THE SW 1/4 OF THE NE 1/4 OF SEC. 25, TWN. 17N., RGE. 01 E. W.M. CITY OF YELM, THURSTON COUNTY, WASHINGTON DATE: March 19, 2021 FILENAME: Q:\2020\2200807\10_CIV\CAD\RMS\2200807-SH-DETL.dwg C3.01 SURFACE DETAILS 7 4" OF CRUSHED STONE BASE COURSE, AS PER SPECS. COMPACTED TO 95% PROCTOR AND GRADED TO WITHIN 0-1/2" OF DESIGN GRADE, AND WITHIN 0-1/4" IN 10 FT. (USE LASER GUIDED GRADER) 2-1/2" PILE FIELDTURF WITH 1-3/3" DEEP INFILL MIRAFI 140 NON-WOVEN GEOTEXTILE OR APPROVED EQUIVALENT SUBGRADE COMPACTED TO 95% PROCTOR AND GRADED TO WITHIN 1/2" OF DESIGN GRADE. SUBGRADE COMPACTED TO 95% PROCTOR AND GRADED TO WITHIN 1/2" OF DESIGN GRADE. 1/2" RUBBER TRACK SURFACE3" PAVING 6" OF 3/4" CRUSHED STONE, COMPACTED TO 95% PROCTOR AND GRADED TO WITHIN 0-1/2" OF DESIGN GRADE, AND WITHIN 0-1/4" IN 10 FT. (USE LASER GUIDED GRADER)6"SAND MIX SUBGRADE COMPACTED TO 95% MAXIMUM DRY DENSITY 2" OF CRUSHED STONE TOP COURSE, AS PER SPECS. COMPACTED TO 95% PROCTOR AND GRADED TO WITHIN 0-1/2" OF DESIGN GRADE, AND WITHIN 0-1/4" IN 10 FT. (USE LASER GUIDED GRADER) 1 NOT TO SCALE FIELD TURF SECTION 2 NOT TO SCALE TRACK SECTION 3 NOT TO SCALE SAND FIELD SECTION TOE BOARD TO BE SPORTSFIELD SPECIALTIES MODEL TFSPTAL OR APPROVED EQUIVALENT. 4 NOT TO SCALE SHOT-PUT PAD 5 NOT TO SCALE DISCUS PAD SUBGRADE CEMENT CONCRETE PAVEMENT6" CRUSHED SURFACING BASE COURSE PER WSDOT 9-03.9(3)4" 9-12" NOTES: 1.DEPTHS INDICATED ARE COMPACTED THICKNESSES. 2.CEMENT CONCRETE PAVEMENT SHALL CONSIST OF PORTLAND CEMENT CONCRETE WITH A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AND A MINIMUM RUPTURE MODULUS OF 650 PSI. 3.GRANULAR SUBBASE SHALL CONSIST OF "BALLAST" PER WSDOT 9-03.9(1), "GRAVEL BORROW" PER WSDOT 9-03.14, OR CRUSHED RECYCLED CONCRETE PROVIDED THAT IT MEETS THE SAME TEXTURAL CRITERIA AS "BALLAST" OR "GRAVEL BORROW." 4.UP TO 20% BY WEIGHT OF THE BASE COURSE MATERIAL MAY BE SUBSTITUTED WITH CRUSHED CEMENT CONCRETE, PROVIDED THAT THE FINAL MIXTURE MEETS THE SAME TEXTURAL CRITERIA AS THE SPECIFIED WSDOT MATERIAL. 5.ALL BASE MATERIAL SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% BASED ON THE MODIFIED PROCTOR MAXIMUM DRY DENSITY PER ASTM D-1557. 6.SUBGRADE SHALL BE COMPACTED TO A FIRM AND UNYIELDING CONDITION PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. ANY LOCALIZED ZONES OF SOFT, ORGANIC-RICH, OR DEBRIS-LADEN SOILS SHOULD BE OVEREXCAVATED AND REPLACED WITH STRUCTURAL FILL MATERIAL. 6 NOT TO SCALE CONCRETE SIDEWALK SECTION