2021.0120.SF0014 Plan 2609 calcs2(:./
�, -7
THOMPS®N Date: X11 By: �
E N G I N E E R I N G
Sheet: Page of
THOMPSON
E N G. 1 N E E R I N O
Randall Thompson, P.E.
Shaer. Pagz_of�_
S 11---[ 11 \RYl LL ®ESIVN C if \MI
WALL
LINE
.STORY
LEVEL
!HEAP
FORCE
(lbs)
AVAILABLE
SHEAKWALL (S.W.)
TOTAL
S.W.
SHEAR
(Fif)
5 W.
TYPE
ANCHOR BOLTS
UPLIFT
(Ibs)
S.W.
SECTION
DEAD
LOAD
(Ifl
NET
UPLIFT
{lbs)
TOTAL
UPLIFT
(lbs)
HOEDOWN OP710N5
(n) / dia. (s)
r
i
I
�
'-
WA
7 2. '�
1
v, Ito)
I
t