2021.0018 Popeyes Yelm M&P PERMIT Set_2021-02-12 stampedUPDNTHRUTHRUDNUPUPDNTHRU24 x 12HVAC SYMBOL LEGENDTRTU-1R YAEXHAUST HOOD NOTESSECTION 15B - HEATING, VENTILATION, AIRCONDITIONING AND REFRIGERATIONEXHAUST HOOD DUCT NOTES (BY G.C.)1. FRYER EXHAUST DUCTWORK ARE SIZED TO MAINTAIN A MINIMUM 1660FPM EXHAUST AIR VELOCITY. ALL GREASE EXHAUST DUCTWORK SHALLBE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH NFPA-96 AND2015 IMC. GREASE EXHAUST DUCTWORK SHALL HAVE ALL SEAMS,JOINTS AND PENETRATIONS SEALED LIQUID TIGHT.2. ALL HORIZONTAL RUNS OF GREASE DUCT, EXHAUST AND CONDENSATESHALL SLOPE BACK TOWARD THE HOOD, GRILLE OR DRAIN AT A SLOPEOF 1" PER FOOT.3. THE MECHANICAL CONTRACTOR IS TO PROVIDE CLEANOUTS, ASREQUIRED PER DETAIL ON M5 SHEET.4. THE DISCHARGE OF THE GREASE EXHAUST FAN SHALL BE UPWARD ANDA MINIMUM OF 40" ABOVE THE ROOF SURFACE AND A MINIMUM OF 10'FROM ANY OUTSIDE AIR INTAKE AND PARAPET.5. ALL GREASE EXHAUST DUCTS SHALL HAVE RADIUSED ELBOWS.6. GREASE EXHAUST DUCT SHALL BE CARBON STEEL 16 GAUGE WELDEDDUCTS PER NFPA-96 AND IMC.1. THE FOLLOWING EQUIPMENT SHALL BE SUPPLIED BY OWNER ANDINSTALLED BY THE HVAC CONTRACTOR.1.1. U.L. LISTED STAINLESS STEEL HOODS AS SPECIFIED PRE PIPED FORFIRE PROTECTION SYSTEM, CEILING CLOSURE STRIP, AND ALLEXHAUST FANS AND CURBS.2. THE HVAC CONTRACTOR SHALL RECEIVE THE ABOVE EQUIPMENT,UNCRATE, BE RESPONSIBLE FOR REPORTING DAMAGE RECEIVEDDURING SHIPMENT, AND BE RESPONSIBLE FOR LOSS OR DAMAGE TOTHE ABOVE EQUIPMENT ONCE RECEIVED ON THE JOB.3. EXHAUST HOODS PROVIDED WILL MEET OR EXCEED THE FOLLOWINGREQUIREMENTS, OR AS BY THE ACTIONABLE CODE:3.1. NSF # 1362 BEAR THE NSF SEAL OF APPROVAL3.2. U.L. CLASSIFICATION # 24N13.3. MEET OR EXCEED NFPA # 96, 1998 EDITION3.4. 2015 IMC4. NOTE NOT USED.5. THE HOOD MANUFACTURER SHALL PROVIDE PRE-PIPED AUTOMATICFIRE CONTROL SYSTEMS FOR THE FRYER HOOD INCLUDING FIRECONTROL CABINETS - AND FURNISH A 2 POLE MICRO SWITCHFURNISHED FOR EQUIPMENT SHUT OFF. THE HVAC CONTRACTORSHALL BE RESPONSIBLE FOR FINAL INSTALLATION AND INSPECTIONS OFTHE HOOD EXHAUST SYSTEM HOOD EXTINGUISHING SYSTEM BYCERTIFIED FIRE SUPPLY CONTRACTOR.6. THE PLUMBING CONTRACTOR SHALL INSTALL THE MECHANICAL GASSHUT-OFF SOLENOID VALVE IN ACCORDANCE WITH THE APPLICABLECODES. THE VALVE SHALL BE PROVIDED BY PLUMBING CONTRACTOR.7. THE ELECTRICAL CONTRACTOR SHALL PROVIDE WIRING INACCORDANCE WITH THE "HOOD WIRING DIAGRAM" SHEET AS DIRECTEDBY THE ELECTRICAL ENGINEER.8. MANUAL PULL STATION SHALL BE PROVIDED BY HOOD CONTRACTORAND INSTALLED BY FIRE SUPPLY CONTRACTOR.GENERAL PROVISIONS1. SCOPE: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT INACCORDANCE WITH THESE SPECIFICATIONS AND THE ACCOMPANYINGDRAWINGS TO PROVIDE A COMPLETE AND PROPERLY OPERATINGHEATING, VENTILATING, AND AIR CONDITIONING SYSTEM.REFRIGERATION SYSTEMS BY OTHERS. WORK UNDER THIS SECTIONINCLUDES, BUT IS NOT NECESSARILY LIMITED TO:1.1. FURNISH AND INSTALL THE FOLLOWING: ROOFTOP UNITS ANDCURBS, INSULATION, DUCT WORK FOR AIR DEVICES, HVACCONTROLS AND PROPER LOW VOLTAGE COMPONENTS FORCOMPLIANCE WITH NFPA 96 AND 72 AND 2015 IMC.1.2. INSTALL THE FOLLOWING: - EXHAUST FANS, HOODS, AND GREASEDUCT RISER. ICE MACHINE AIR COOLED CONDENSER ON ROOF BYOTHERS.1.3. GENERAL REQUIREMENTS: ALL WORK UNDER THIS CONTRACTSHALL BE ACCOMPLISHED IN STRICT ACCORDANCE WITH FEDERAL,STATE, AND LOCAL CODES. WHERE THESE PLANS ANDSPECIFICATIONS ARE IN CONFLICT WITH SUCH CODES, THE MOSTSTRINGENT REQUIREMENT (ACCORDING TO THE ENGINEER) SHALLAPPLY. PAY FOR AND OBTAIN NECESSARY CONSTRUCTIONPERMITS AND CERTIFICATES OF INSPECTION.COORDINATION:COORDINATE WORK WITH OTHER TRADES. LOCATIONS SHOWN ONDRAWINGS ARE APPROXIMATE. FIELD LOCATE ROOF CURBS BASED ON THEGENERAL DIRECTIONS GIVEN ON CONSTRUCTION DOCUMENTS.MATERIALS AND PERFORMANCE:1. MATERIALS: ALL MATERIALS SHALL BE NEW AND OF THE QUALITYINDICATED BY THE SPECIFIED BRAND NAMES. SUBSTITUTIONS OFMATERIAL OF EQUAL QUALITY BY OTHER FIRST-LINE MANUFACTURERSMAY BE ACCEPTABLE PROVIDED A LIST OF SUCH SUBSTITUTIONS ISAPPROVED IN WRITING BY POPEYES DEVELOPMENT. A SUBSTITUTIONSLIST SHALL BE SUBMITTED IN TRIPLICATE FIVE (5)DAYS BEFORE THECONTRACT IS TO BE LET.2. NATIONAL ACCOUNTS: ROOFTOP HVAC EQUIPMENT, TOILET EXHAUSTFANS, HVAC DUCT SYSTEMS, AND HVAC DIFFUSERS, GRILLES, ANDPLENUM BOXES ARE AVAILABLE FROM NATIONAL ACCOUNTS INDICATEDON THE DRAWING COVER SHEET. INSTALL ALL EQUIPMENT INACCORDANCE WITH PLANS AND MANUFACTURERS' INSTRUCTIONS.FOR NATIONAL ACCOUNTS INFO REFER TO DIRECTORY.3. ROUTING OF DUCT SYSTEMS: COORDINATE ROUTING OF DUCTSYSTEMS WITH OTHERS, LINE UP WORK TRUE TO ADJACENT SPACESAND IN A WORKMANLIKE MANNER, AND USE STANDARD RADIUS 90ELBOWS. WHERE REQUIRED, DUCTWORK IS TO BE STURDILYSUPPORTED AND SEPARATED IN ACCORDANCE WITH ASHRAE &SMACNA STANDARDS AND IMC.4. DUCTWORK FOR HVAC SYSTEM:NOTE:A LICENSED TEST AND BALANCE CONTRACTOR SHALL PROVIDE ALL TOOLSAND TEST EQUIPMENT NECESSARY FOR BALANCING ALL HVAC ANDEXHAUST AIR SYSTEMS. A "DIGITAL" ANEMOMETER MODEL DA 4000 WITH A275 PROBE IS RECOMMENDED FOR MEASURING HOOD EXHAUST.4.1. GENERAL NOTES:4.1.1. VOLUME DAMPERS SHALL BE INSTALLED AT ALL BRANCHRUNOUTS.4.1.2. DUCT DIMENSIONS INDICATED ARE INSIDE DIMENSIONSDIMENSIONS.4.1.3. DUCT WORK SHALL BE BUILT IN ACCORDANCE WITH ASHRAE ANDSMACNA STANDARDS.4.1.4. DUCT BOARD IS NOT ALLOWED.4.2. METAL DUCT WORK:4.2.1. DUCT WORK SHALL BE CONSTRUCTED OF G-90 GALVANIZEDSHEET METAL.4.2.2. THE GAUGES OF METAL TO BE USED AND THE CONSTRUCTIONAND BRACING OF JOINTS SHALL BE IN ACCORDANCE WITHASHRAE, IMC AND SMACNA STANDARDS.4.2.3. METAL DUCT SHALL BE SUPPORTED FROM BUILDING STRUCTUREON STRIP HANGERS NOT OVER 5'-0" APART.4.3. EXTERNAL S/A, R/A DUCT WRAP:4.3.1. INSULATE EXTERIOR OF ALL S/A, R/A METAL DUCT FITTINGS WITH2" THICK FIBERGLASS, 3/4 LB.DENSITY, BLANKET INSULATION WITHFOIL BACKING AND UL LABELED.4.3.2. INSULATION SHALL HAVE A FLAME SPREAD OF TWENTYFIVE(25)OR LESS AND A SMOKE DEVELOPED RATING OFFIFTY(50)OR LESS.4.3.3. INSULATION SHALL BE OWENS-CORNING FRK25 OR EQUAL.4.3.4. INSULATION SHALL BE LIGHTLY LAPPED WITH 2" WIDE VAPORBARRIER PRESSURE-SENSITIVE TAPE. SEE DETAIL ON M4 SHEET.4.3.5. DUCT WRAP SHALL BE INSTALLED IN A NEAT AND COMPETENTMANNER WITH ALL EDGES COVERED WITH APPROVED METALLICDUCT TAPE TO VAPOR-PROOF THE ENTIRE DUCT.4.4. FLEX CONNECTORS/FLEX DUCT:4.4.1. FLEXIBLE DUCTWORK SHALL BE CLASS 1 RATED. INSULATION ANDVAPOR BARRIERS PRESENT ON ALL FLEXIBLE DUCTS SHALL BEFITTED OVER THE CORE CONNECTION AND SHALL BESUPPLEMENTALLY SECURED WITH A DRAW BAND AND TAPED. SEEDETAIL ON M4 SHEET.5. TEMPERATURE SETTINGS:5.1. AT CONCLUSION OF PROJECT, SET POINTS SHALL BEAPPROXIMATELY COOLING 78 DEGREES F/ HEATING 68 DEGREES F,AND INSTRUCT OWNER HOW TO RESET.6. ROOF CURBS:6.1. CURBS TO BE FURNISHED BY NCA CONSULTANTS AND INSTALLED INACCORDANCE WITH DETAILS ON SHEET M2. COORDINATE WITH ROOFCONTRACTOR. RTU'S SHALL BE INSTALLED SUCH THAT ROOF DECK ISCONTINUOUS BENEATH, AND OPEN PLENUM CURBS FLANGE TOFLANGE. SEE M2 SHEET.7. TESTING AND ADJUSTING OF HVAC SYSTEM:7.1. UPON COMPLETION OF THE INSTALLATION, THE PROJECT SHALL BETESTED AND ADJUSTED AS FOLLOWS:7.1.1. ADJUST FAN DRIVES TO ACHIEVE REQUIRED AND RATED CFM.7.1.2. ADJUST TEMPERATURE AND FAN CONTROL SEQUENCE.7.1.3. ADJUST THE ENTIRE INSTALLATION AS TO MINIMIZE NOISE ANDVIBRATION FROM FANS.7.1.4. ELIMINATE ANY DUCT PULSATION BY USE OF STIFFENERS ORADDITIONAL SUPPORTS AS REQUIRED.7.1.5. CORRECT ANY EQUIPMENT OR COMPONENT WHICH ISGENERATING OBJECTIONABLE NOISE IN THE OPINION OF THEOWNER OR BY LOCAL AUTHORITIES.7.1.6. BALANCE EXHAUST AND OUTSIDE AIR TO QUANTITIES INDICATEDON THE PLANS. REFER TO BUILDING AIR BALANCE SCHEDULE.7.1.7. PROVIDE OWNER AND ENGINEER OF RECORD TWO(2)COPIES OFA WRITTEN AIR BALANCE REPORT INDICATING ALL FINALEXHAUST, SUPPLY, AND OUTSIDE AIR FLOWS.7.2. COMMISSIONING:7.2.1. ALL HVAC SYSTEMS SHALL BE COMMISSIONED PER THE ENERGYCODE. SEE ENERGY MATRIX FOR ADDITIONAL REQUIREMENTS.8. PIPING TO BE HERMETICALLY SEALED.9. CONTROLS: FURNISH AND INSTALL AS INDICATED ON DRAWINGS.FURNISH AND INSTALL ALL CONTROL WIRING AND CABLES FROM HVACUNITS, TEMPERATURE SENSORS, PHOTOCELL, AND CONTRACTORPANEL IF USED. ROUTE CONTROL WIRING IN RACEWAY IN EQUIPMENTIF PROVIDED.10. HOOD EXHAUST FANS AND DUCTWORK: INSTALL ALL HOOD EXHAUSTFANS IN ACCORDANCE WITH THE PLANS AND MANUFACTURER'SINSTALLATION INSTRUCTIONS. COOKING EXHAUST FANS ARE SUPPLIEDBY OWNER. VENTILATOR EXHAUST DUCT SHALL BE INSTALLED INACCORDANCE WITH NFPA 96 AND PER CODE.11. CLEANUP: AFTER COMPLETION OF THE WORK BEFORE FINALINSPECTION CLEAN HVAC EQUIPMENT.12. FILTERS: PROVIDE CLEAN SET OF FILTERS FOR EACH HVAC UNIT WHENTURNED OVER TO THE OWNER.13. HVAC OPERATOR'S MANUAL AND DIAGRAMS AND PER COMMISSIONINGREQUIREMENTS:13.1. PROJECTS PARTICIPATING IN THE NATIONAL ACCOUNTS PROGRAMSHALL FOLLOW THE PROCEDURE OUTLINED IN THE NATIONALACCOUNT AND PER COMMISSIONING REQUIREMENTS.13.2. PROJECTS NOT PARTICIPATING IN THE NATIONAL ACCOUNT SHALLFOLLOW THE FOLLOWING PROCEDURE:13.2.1. PREPARE IN DUPLICATE A MANUAL DESCRIBING THE PROPERMAINTENANCE AND OPERATION OF THE SYSTEM. THIS MANUALSHALL NOT CONSIST OF STANDARD FACTORY-PRINTEDINSTRUCTIONS, ALTHOUGH THESE MAY BE INCLUDED, BUTSHALL BE PREPARED TO DESCRIBE THIS PARTICULARPROJECT.13.2.2. THE MANUALS SHALL BE BOUND, INDEXED, DATED, AND SIGNEDBY THE GENERAL CONTRACTOR. ONE (1)COPY SHALL BE SENTTO POPEYES DEVELOPMENT AND THE OTHER TO THE OWNER.QUALIFIED REPRESENTATIVES OF THE AIR CONDITIONINGCONTRACTOR SHALL MEET WITH THE DESIGNATEDREPRESENTATIVE OF THE OWNER. THE OWNER'SREPRESENTATIVE SHALL BE INSTRUCTED IN THE PROPEROPERATION AND MAINTENANCE OF THE HVAC AND CONTROLSYSTEM.14. GUARANTEE: MATERIALS AND WORKMANSHIP SHALL BE GUARANTEEDFOR ONE (1)YEAR FROM DATE OF COMPLETION. IN ADDITION, ALLREFRIGERATION COMPRESSORS SHALL BEAR A NON-PRORATED 5-YEARFACTORY WARRANTY, AND ALL EXTENDED WARRANTIES.15. SERVICE ACCESS::15.1. PROVIDE SERVICE ACCESS AS REQUIRED IN MANUFACTURER'SINSTALLATION INSTRUCTIONS. IF SUCH ACCESS IS NOT AVAILABLE,NOTIFY OWNER AND ATTEMPT TO SEE IF NECESSARY CHANGESCAN BE WORKED OUT WITH OTHER TRADES. IF NOT, DO NOTINSTALL EQUIPMENT WHICH DOES NOT MEET MANUFACTURER'SREQUIREMENTS FOR ACCESSIBILITY. IN NO CASE BID, SUBMIT, ORINSTALL EQUIPMENT IN SITUATIONS THAT DO NOT MEET THEMANUFACTURER'S WARRANTY REQUIREMENTS.16. ENVIRONMENTAL CORROSION PROTECTION. CONDENSER,COOLING/HEATING COILS:16.1. REQUIRED FACTORY DIPPED COATING WITHIN ONE MILE OF ANYSALT WATER BODY. FACTORY PRE-COAT WITHIN ONE TO FIVEMILES OF ANY SALT WATER BODY.GENERAL NOTES:1. HVAC CONTRACTOR SHALL VERIFY THAT ALL EQUIPMENT. AS SHOWNON THESE DRAWINGS, WILL NOT CONFLICT WITH ANY DRAINS,SCUTTLES, JOINTS, VENTS, ETC.2. ALL ROOF MOUNTED EQUIPMENT AND PENETRATIONS SHALL BEFLASHED A MINIMUM OF 12" ABOVE THE ROOF. PROVIDE AMPLE CURBS.3. ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10'-0" FROM ANYEXHAUST FAN OR PLUMBING VENT. REFER TO ROOF PLAN.4. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR ADMINISTERINGALL WARRANTIES ON EQUIPMENT WHICH HE INSTALLS, AND OTHERITEMS FURNISHED BY OTHERS AS WELL AS THOSE FURNISHED BY HIM.5. CONDENSATE DRAINAGE FROM ROOF TOP HVAC UNITS SHALL BETRAPPED. REFER TO ROOF PLAN.6. PROVIDE VIBRATION ISOLATION GASKETS AT FLANGE MARRIAGES. SEEDETAIL ON M4 SHEET.7. ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDEDIMENSIONS.8. MECHANICAL CONTRACTOR SHALL COORDINATE ALL DUCT ANDDIFFUSER LOCATIONS WITH LIGHTING LAYOUTS AS REQUIRED.9. THE CONTRACTOR SHALL PROVIDE COMPLETE INFORMATION ANDCOOPERATION TO THE OTHER CONTRACTORS AND TRADES ASREQUIRED FOR COMPLETION AND COORDINATION OF THE COMPLETEPROJECT.10. THIS CONTRACTOR SHALL COORDINATE WITH THE GENERALCONTRACTOR AND OTHER TRADES, ALL REQUIRED OPENINGS, WALLSAND ROOFS SHALL BE DESIGNED INTO THE STRUCTURE INITIALLY BYTHE USE OF SLEEVES, CURBS, ETC. CUTTING AND PATCHING SHALL BEHELD TO A MINIMUM.11. THERMOSTATS SHALL BE LOCATED GENERALLY AS SHOWN BUT THEIREXACT LOCATION SHALL BE FIELD COORDINATED TO AVOIDNTERFERENCE WITH WALL MOUNTED ITEMS. MOUNT 54" AFF.12. MECHANICAL CONTRACTOR TO INSULATE BACKSIDE OF ALL DIFFUSERS.13. ALL DAMAGED COIL FINS SHALL BE COMBED STRAIGHT.HVAC CONTROL NOTES:THE HVAC CONTRACTOR SHALL PROVIDE ALL CONTROL WIRINGDIAGRAMS FOR THE HVAC EQUIPMENT. 24 VOLT WIRING ANDCONDUIT SHALL BE PROVIDED AND INSTALLED BY THEMECHANICAL CONTRACTOR. PROVIDE ADDITIONAL 24 VOLTTRANSFORMERS AS REQUIRED.ROOFTOP AIR CONDITIONING UNITSTHE AIR CONDITIONING UNIT FANS, HEATING AND COOLING SHALLBE CONTROLLED FROM 24 VOLT ROOM THERMOSTATS LOCATEDAPPROXIMATELY AS SHOWN ON THE PLANS. THE THERMOSTATSSHALL BE MOUNTED BY THIS CONTRACTOR 54" A.F.F.FANSEF-1 THRU EF-3 SHALL EACH BE CONTROLLED BY A SEPERATESWITCH LOCATED ON THE HOOD SERVED BY THAT FAN.EF-1 SHALL BE CONTROLLED BY A DIGITAL TIME SWITCH LOCATEDIN OFFICE REFER TO ELECTRICAL DRAWINGS.HVAC UNITS RTU-1 AND RTU-2 SHALL BE PROGRAMMED FOR"FAN-ON" DURING OCCUPIED TIMES, FAN SHALL CYCLE WITHUNITS DURING UNOCCUPIED TIMES.SMOKE DETECTORSPROVIDE EACH AIR CONDITIONING UNIT WITH A DUCT MOUNTEDSMOKE DETECTOR IN THE RETURN AIR DUCT SYSTEM PRIOR TOMIXTURE OF OUTSIDE AIR CAPABLE OF SHUTTING DOWN ITSRESPECTIVE AIR CONDITIONING UNIT UPON ACTIVATION. THESMOKE DETECTOR SHALL CONSIST OF A SIMPLEX DUCTDETECTOR WITH PHOTOELECTRIC DETECTOR, AND SAMPLINGTUBE. ALL LINE VOLTAGE WIRING AND CONDUIT SHALL BE BY THEELECTRICAL CONTRACTOR AND ALL OTHER WORK SHALL BE BYTHE HVAC CONTRACTOR. ACTIVATION OF A DUCT SMOKEDETECTORS SHALL INITIATE A VISIBLE AND AUDIBLESUPERVISORY SIGNAL AT A CONSTANTLY ATTENDED LOCATION.APPROVED HVAC NATIONAL ACCOUNTAPPROVED VENDORS:CARRIERTRANELENNOXNOTE:GENERAL CONTRACTOR SHALLCOORDINATE TRUSS SPACING PLUMTO ACCOMMODATE STRAIGHT GREASERISERS FROM HOOD TO FAN INLET.AFF ABOVE FINISHED FLOORCFM CUBIC FEET PER MINUTEHP HORSEPOWERKW KILOWATTOA OUTSIDE AIRRPM REVOLUTIONS PER MINUTERTU ROOFTOP UNITSUPPLY AIR (SA) DUCTWORKRETURN AIR (RA) DUCTWORKEXHAUST AIR (EA) DUCTWORKWB WET-BULBWALL MOUNTED THERMOSTAT FOR UNIT INDICATEDREMOTE DUCT TEMPERATURE SENSORFUSIBLE LINKDUCT SECTION, POSITIVE PRESSURE, FIRST FIGUREIS ARROW SIDEDUCT SECTION, EXHAUSTDUCT SECTION, NEGATIVE PRESSURE, RETURNCEILING DIFFUSERCEILING RETURNCEILING EXHAUSTRADIUS ELBOW - INSIDE RADIUSMINIMUM ONE HALF DUCT WIDTHSQUARE TO ROUND TRANSITIONREMOTE HOOD PULL STATIONM0MECHANICALSPECIFICATIONSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
M0AMECHANICALCALCULATIONSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
M0BMECHANICAL ENERGYFORMSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
M1HVAC PLAN, NOTES &SCHEDULESCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
SLOPE 3/8" PER FT.COOLER/FREEZER CONDENSING UNITS.UNIT SUPPLIED BY WALK-IN MFR.INSTALLATION AND HOOK UPS TO BESUPPLIED BY GC.WALKWAY PAD IF SINGLEPLY ROOF BY ROOFINGMFR., TYP.WALKWAY PADS BYROOFING MFR., TYP.EF-23" WATER HEATERVENTS4" VTRICE MACHINE CONDENSING UNITON STAND.ROOF HATCHEF-3EF-4RTU-3RTU-1RTU-2EF-1CRICKETCRICKETCRICKETSL.
SLOPESLOPE
SLOPESLOPECRICKETSL.SL.METAL CANOPY, TYP.CRICKETM2HVAC ROOF PLAN &DETAILSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565PRESSURE RELIEF DETAIL
"PRINCE CASTLE" # HPC-2ACONTROL W/ J-BOX MOUNTON S/S HOUSING OF ITEM F15A"PRINCE CASTLE" # HPC-2ACONTROL W/ J-BOX MOUNTON S/S ANGKE HEREM3HOOD DETAILSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
M4HOOD DETAILSM41CAPTIVEAIRE HOOD DETAILS3/8"=1'-0"CHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
IF THE KITCHEN A/C SWITCH IS IN THE OCCUPIED POSITION, THE HOOD VENTILATION SYSTEM CAN BE STARTED.THE UNDER HOOD EQUIPMENT SHALL BE STARTED BY MOVING THE EXHAUST FANS ON/OFF SWITCH TO THE ON POSITION.ACTIVATION OF THE HOOD FIRE SUPPRESSION SYSTEM SHALL DE-ENERGIZE THE A/C UNITS AND CONTROLLED COOKING EQUIPMENT BOTH ELECTRICAL AND GASFIRED. THEHOODS EXHAUST SYSTEM SHALL CONTINUE TO OPERATE TO DRAW OUT SMOKE. THE FIRE SUPPRESSION SYSTEM SHALL BE MANUALLY RESET.EXTERIOR LIGHTING CONTROLHOOD VENTILATION SYSTEMMANUAL CONTROL SYSTEMSEQUENCE OF OPERATIONPOPEYESALL OF THE EXTERIOR LIGHTING SHALL BE CONTROLLED, WITH THE EXCEPTION OF THE SECURITY LIGHTS WHICH SHALL BE OPERATED BY ITS OWN PHOTOCELL. SECURITYLIGHTING IS OPTIONAL.THE SIGNAGE SELECTOR SWITCH (3-POS.) CONTROLS THE PRIME SIGN, ALL MARQUEE SIGNS, AND BUILDING ACCENT LIGHTING.ON POSITION: LIGHTING SHALL BE ON PERMANENTLY.OFF POSITION: LIGHTING SHALL BE OFF PERMANENTLY.AUTO POSITION: LIGHTING SHALL BE CONTROLLED BY THE PHOTO CELL, AND A SET OPENING AND CLOSING TIME.THE LOT LIGHTS THREE POSITION SWITCH WORKS AS FOLLOWS:ON POSITION: WSEC DOES NOT ALLOW PERMANENT ON CONTROL.OFF POSITION: LIGHTING SHALL BE OFF PERMANENTLY.AUTO POSITION: LIGHTING SHALL AUTOMATICALLY DIM BY 30% FROM NO LATER THAN MIDNIGHT TO 6AM OR FROM 1 HOUR AFTER CLOSE TO ONE HOUR BEFORE OPENINGOR DURING A PERIOD OF 15 MINUTES OF INACTIVITY.NOTE: UNOCCUPIED-OCCUPIED / MASTER RELAY PANEL SHALL BE COMPLETE WHEN SHIPPED TO THE JOB SITE. NO INTERNAL WIRING SHALL BE REQUIRED. MAKE ALL EXTERNALWIRING CONNECTIONS AS REQUIRED.PANEL SCHEMATIC DIAGRAMSAIR CONDITIONING UNIT TO THE "UNOCCUPIED-OCCUPIED" PANEL.AIR CONDITIONING UNIT TO THE NIGHT SETBACK THERMOSTAT LOCATION,TERMINATION OF ALL 24 VOLT AIR CONDITIONING CONTROL WIRING SHALL BERUN 0NE (10) CONDUCTOR 18 GAUGE THERMOSTAT CABLE FROM THE ROOFTOPRUN 0NE (10) CONDUCTOR 18 GAUGE THERMOSTAT CABLE FROM THE ROOFTOPRUN 0NE (10) CONDUCTOR 18 GAUGE THERMOSTAT CABLE FROM THE "UNOCCUPIED-ELECTRICAL CONTRACTOR NOTES:OCCUPIED" PANEL TO THE THERMOSTAT LOCATION.DONE BY THE MECHANICAL CONTRACTOR.4.3.2.1.IF NOT CONTROLLED WITH P-374-2700 T-STAT. REFER TO SHEET M-1ELECTRICAL CONTRACTOR SHALL RUN LINE VOLTAGE FROM THE CURRENT SENSOR 5.LOCATED IN THE BROILER HOOD EXHAUST FAN TO THE CONTACTOR PANEL LOCATED BY THE SWITCHGEAR.Current sensors are factory wired but must befield adjusted for proper operation. With the hood exhaustfans running, spin the potentiometer dials counterclockwiseuntil the status "OFF" green LED lights and cookingequipment contactors de-energize. Then turn dials backclockwise one full turn. If the current sensors are improperlyadjusted, cooking equipment may not shut off should ahoods exhaust fan fail. If the cooking equipment fails tooperate while the hood switches are on and the exhaustfans are running, spin the appropriate setpoint dialclockwise until the status "ON" red LED lights.IT WILL DISABLE THE LINE VOLTAGE TO THE COOKING EQUIPMENT UNDER THE HOOD.WHEN THE HOOD EXHAUST FAN CURRENT SENSOR DETECTS A DROP IN AMPERAGE MIN AFTER THE SECURITY DEPARTURE SWITCH IS ACTIVATED.THE PARKING LOT POLE LIGHTS & SECURITY LIGHTS SHALL REMAIN ON FOR 15 THE SIGNAGE LIGHTING & LOT LIGHTING SHALL BE DISABLED IF SWITCHES ARE IN THE OFF POSITION. THE COOKING EQUIPMENT SHALL BE DISABLED.THE HEATING AND COOLING OPERATION SHALL REVERT TO SYSTEM NIGHT SET BACK MODE. EXHAUST FANS, SUPPLY FANS, AND EVAPORATOR BLOWERS WILL SHUT DOWN.WHEN A/C UNOCCUPIED-OCCUPIED SWITCH IS TURNED TO THE OFF POSITION:THE COOKING EQUIPMENT AND EXHAUST FANS CAN BE TURNED ON ONCE THE BUILDING IS UP TO TEMPERATURE AND THE AIR CONDITIONERS WILL BEGIN TO COOL OR HEAT AT THE OCCUPIED TEMPERATURE SETPOINT.DAMPERS WILL NOT OPEN DURING NIGHT SET BACK MODE. THE SEATING UNIT OUTDOOR DAMPERS WILL REMAIN CLOSED UNTIL ZONE COMES UP TO TEMPERATURE SETPOINT AND THE AIR CONDITIONING FANS WILL START AND RUN CONTINUOUSLY. THE AIR CONDITIONING SYSTEM WILL GO FROM NIGHT MODE TO SYSTEM ON.WHEN A/C UNIT UNOCCUPIED-OCCUPIED SWITCH IS TURNED TO THE ON POSITION:THE A/C UNITS UNOCCUPIED-OCCUPIED SWITCH IS USED TO: TURN THE STORE ON IN THE MORNING AND OFF IN THE EVENING.OCCUPIED UNOCCUPIEDCOOLING73° DEGREES 80° DEGREESOCCUPIED UNOCCUPIEDHEATING 70° DEGREES 62° DEGREESDRW: S. BROADBEARREV 2.0C 2012Suncoast EnvironmentalControls, Inc.PH: (727) 544-6679FX: (727) 544-6670RY1W1 COOLING HEATING 24V POWERR-3,4R-5,6R-1,2REDGRN ROOFTOP UNIT TERMINALS S.E.C. FIRE INTERLOCK TERMINALS LOW VOLTAGE A/C CONTROL FIELD WIRING DETAILBURGER KING LOW VOLTAGE WIRING CONNECTIONSDATE: 7 / 19 / 2012RGRCK1CKGNDY1Y2W1W2CW2CHEATING ST. 2COMMONG FAN CONTROLY2 COOLING ST. 2W2GY1W1 FAN CONTROL COOLING HEATINGHEATING ST. 2CKCK1CK 1CK GND THERMOSTAT VENSTAR T-2700R 24V POWERMISC COOLING ST. 2C 24V COMMONUNITSTAT1YELBLUWHTBLKBRNGNDRS+5RS1RS GNDRS+5RS1RS GND REMOTE TEMP. SENSOR ACC0400 (OPTIONAL)REMOTE SENSORREMOTE SENSORREMOTE SENSOR4 POLE CONTACTOR120V COIL 30 AMP RES.ON W/PHOTOCELL IN AUTO,ON/OFF WITH O/R SWITCH,TIMED DELAY TO OFF WITHSECURITY DEPARTURESWITCHC - 1C - 2C - 3BUILDING/SIGN LTS.LOT POLE LTS.LOT POLE LTS.C - 4BUILDING/SIGN LTS.C - 5BUILDING/SIGN LTS. ON/OFF W/ PHOTOCELL INAUTO,ON/OFF WITH O/R SWITCHC - 7UNDER HOODFRYERCOOKING EQUIP.C - 6UNDER HOODBROILERCOOKING EQUIP.ON/OFF WITH BROILEREXHAUST FAN SW.(15MIN. DELAY TO OFF)(ON UPONINTERRUPTION OF FIRESUPPRESSION LOOP )MS-1BROILER HOODEXAUST FAN-1MS-2FRYER HOODEXAUST FAN-2ON/OFF WITH FRYEREXHAUST FAN SW.(ON UPONINTERRUPTION OF FIRESUPPRESSION LOOP)ON/OFF WITH BROILEREXHAUST FAN SW.(OFF UPONINTERRUPTION OF FIRESUPPRESSION LOOP)C - 8REFRIGERATOR/FREEZER/GASVALVEALWAYS ON EXCEPTUPON INTERRUPTIONOF FIRE SUPPRESSIONLOOP4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.4 POLE CONTACTOR120V COIL 30 AMP RES.COIL A2
N.C.
N.O.R-7FIRE INT.COIL A1
12 11 10 9
43 21
87 54
COIL A2
N.C.
N.O.R-8EF-1INTERLOCKCOIL A1
12 11 10 9
43 21
87 54 TB - 3 TB - 1CIRCUIT - -CIRCUIT - ___ - ___LOT POLE LIGHTSCIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___56783421CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___9101112CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___13141516CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___17181920CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___21222324CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___C1C2C3C4C5C625262728CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___C729303132CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___C833343536CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___MS137383940CIRCUIT - -CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___CIRCUIT - ___ - ___MS2BROILER FANTIME DELAY RELAYTDR#2LOT POLE LIGHTSBLDG./SIGN LTS.BLDG./SIGN LTS.BLDG./SIGN LTS.UNDER HOOD EQUIP.FRYERREFRIGERATORFREEZERGAS VALVEFRYER FAN EF-1FRYER FAN EF-1FRYER FAN EF-2FRYER FAN EF-256783421910111213141516171819202122232425262728293031323334353637383940C1C2C3C4C5C6C7C8MS1MS2AIROTRONICSTH3P103HAS1120V AC 1AMP 1 2 345EXH. FANCURRENT SENSORSCS1CS256783421910NEUTRALBUILDING LIGHTS (AUTO)FIRE INT. 120V LOOP120VAC CONTROLLOT LIGHTS (AUTO)LOT LIGHTS (ON)BUILDING LIGHTS (ON)EX. FANS / COOK EQUIP.A/C 120V INTERLOCKL1NNEUTRAL120VAC CONTROL POWERP5P6P3P4P2P1PHOTOCELL NEUTRALPHOTOCELL LINEPHOTOCELL LOADPHOTOCELL NEUTRALPHOTOCELL LINEPHOTOCELL LOADLOT LIGHTS PHOTOCELLBLDG. LIGHTS PHOTOCELLINCOMING CONTROL POWERROUTE TO TB 6 IN ON/OFF CONTROL PANELA1A2FIRE INTERLOCK (COM.)FIRE INTERLOCK (N.C.)ROUTE TO HOODS MICROSWITCHESLOAD SIDE TB - 2 TB - 5 TB - 4GROUNDON/OFF WITH FRYEREXHAUST FAN SW.(OFF UPONINTERRUPTION OF FIRESUPPRESSION LOOP)F1F2NEUTRALOPT. ELECT FRY CONT.ROUTE TO OPTIONAL ELECT. FRY PANELLINE SIDEON / OFF CONTROL PANEL WIRINGMASTER RELAY PANEL WIRINGR-1R-2R-3R-4R-5R-6 SWITCH - 3 SIGN LIGHTS SWITCH - 4 LOT LIGHTSKITCHEN SETBACKDINING SETBACKDINING FANKITCHEN FANANSUL/ FIRE INT.CUST. SUPPLIED MEANS OFBRANCH CIRCUIT DISCONNECT INACCORDANCE WITH THE N.E.C.(UL 489 LISTED 20A BREAKER)SEE SOURCE SHEET FORBREAKER SIZE AND AMPRAGEFOR ALL CONNECTED LOADSN.C.COM.LOT LIGHTSLOT - "AUTO"LOT - "ON"SIGN - "AUTO"SIGN - "ON"BROILERBLACKBLACKBLACKWHITEREDRED/ YELLOWGREENTANBLUEREDRED/ YELLOWGREENTANWHITEBLACKANSUL PROVENEUTRAL WHITE120V POWER2A C. BREAKER MOMENTARY SWITCH FOR O/RBLUEBLACKRED/ GREENRED/ GREENRED/ BLACKTANREDRED/ YELLOWBLACKBLACKBLACK TIME DELAY RELAYBUILDING LIGHTSEXHAUST FAN -1BROILER CONTROLEXHAUST FAN -2FRYER CONTROLFIRE INTERLOCK RELAYANSUL/ FIRE INT.C-1C-2C-3C-4C-5MS1MS2NEUTRAL120V POWERNL1120V PHOTOCELL #1LOT LIGHTS(MANAGER'S OFFICE) 7 6 1 2 3FIELD WIRING VIA3/4" EMT PIPE120V PHOTOCELL #2BLDG. SIGNS01020304050607080102030405060708A1A2TDR#2N.O.N.C.113711N.O.N.C.ORGORGBLUYELPURBRN ORGREDGRYBLKBLKBLKBLK GRYPURBLUTB-4OPTIONAL ELECTRIC FRYER PANEL NEUTRALOPTIONAL ELECTRIC FRYER PANEL POWERC 2012Suncoast EnvironmentalControls, Inc.PH: (727) 544-6679FX: (727) 544-6670ANSUL / AMEREX FIRE SUPRESSIONCONTACTS LOCATED AT HOOD(Interuption of the fire supression loop will result in the exhaust fans running,MUA(A/C units) shutting down and all equipment under the hood(s) de-energizing)PANEL WIRINGFIELD WIRINGNO CONNECTIONCONNECTIONBRNBRNBRNBRNORGYELREDBLKWHTWHTWHTWHTWHTWHTWHTWHTWHTWHTWHTWHTBRNORGYELREDWHTWHTINTERMATICMOD# K4221CUNOCCUPIED OCCUPIED AUTO OFF ON AUTO OFF ONLOT LTS.BLDG LTS.KITCHEN A/C SECURITY DEPARTURE SWITCHBUILDING CONTROLOFF ONUNOCCUPIED OCCUPIEDDINING A/CEXHAUST FANSAIROTRONICSTH3P103HAS1120V AC 1AMPTDR#1TIME DELAY RELAY 1 2 3 7 615 PIN CABLECONTROL CIRCUIT BREAKER (2A)KITCHEN A/C UNIT #____(R) FROM A/C UNITG FAN CONTROLY-1 COOLING -1Y-2 COOLING -2W-1 HEATING -1W-2 HEATING -2C- 24V COMMON(CK1) THERMOSTATRU(R) TO THERMOSTATRTGY1Y2W1W2CCK1(CKGND) THERMOSTATCK-GNDKITCHEN A/C UNIT #____DINING A/C UNIT #____DINING A/C UNIT #____DINING A/C UNIT #____ TB - 6NEUTRALBUILDING LIGHTS (AUTO)FIRE INT. 120V LOOP56783421910GROUND120VAC CONTROLLOT LIGHTS (AUTO)LOT LIGHTS (ON)BUILDING LIGHTS (ON)EX. FANS / COOK EQUIP.A/C 120V INTERLOCKROUTE FROM TB#2 IN MASTER RELAY PANEL(R) FROM A/C UNITG FAN CONTROLY-1 COOLING -1Y-2 COOLING -2W-1 HEATING -1W-2 HEATING -2C- 24V COMMON(CK1) THERMOSTATRU(R) TO THERMOSTATRTGY1Y2W1W2CCK1(CKGND) THERMOSTATCK-GND(R) FROM A/C UNITG FAN CONTROLY-1 COOLING -1Y-2 COOLING -2W-1 HEATING -1W-2 HEATING -2C- 24V COMMON(CK1) THERMOSTATRU(R) TO THERMOSTATRTGY1Y2W1W2CCK1(CKGND) THERMOSTATCK-GND(R) FROM A/C UNITG FAN CONTROLY-1 COOLING -1Y-2 COOLING -2W-1 HEATING -1W-2 HEATING -2C- 24V COMMON(CK1) THERMOSTATRU(R) TO THERMOSTATRTGY1Y2W1W2CCK1(CKGND) THERMOSTATCK-GND(R) FROM A/C UNITG FAN CONTROLY-1 COOLING -1Y-2 COOLING -2W-1 HEATING -1W-2 HEATING -2C- 24V COMMON(CK1) THERMOSTATRU(R) TO THERMOSTATRTGY1Y2W1W2CCK1(CKGND) THERMOSTATCK-GND TB - 7 TB - 8 TB - 9 TB - 10 TB - 11COIL A2N.C.N.O.COIL A112 11 10 943 2187 54 R-1KITCHEN SETBACKCOIL A2N.C.N.O.COIL A112 11 10 943 2187 54COIL A2N.C.N.O.COIL A112 11 10 943 2187 54COIL A2N.C.N.O.COIL A112 11 10 943 2187 54COIL A2N.C.N.O.COIL A112 11 10 943 2187 54COIL A2N.C.N.O.COIL A112 11 10 943 2187 54 R-2 DININGSETBACK R-3KITCHEN A/C FAN R-4 DININGA/C FANR-5A/CFIRE INT.R-6A/CFIRE INT.ELECTRICAL CONTRACTOR SHALL COORDINATE WITH MECHANICAL CONTRACTOR5.FOR ADDITIONAL WIRING AND CONTROLS.THEN WILL OPEN TO THE PRESET POSITION.THE KITCHEN UNITS OUTDOOR AIR DAMPERS SHALL OPEN TO THE PRESET CONDITION.HEATING AND COOLING SHALL CYCLE THROUGH STAGES AS NEEDED. 1ST STAGE COOLING SHALL BE ECONOMIZER IF OUTSIDE AIR CONDITIONS ARE GOOD.OUTDOOR AIR DAMPERS ARE OPEN.OUTSIDE AIR DAMPERS SHALL CLOSE.RENSCH ENGINEERING HAS REVIEWED THIS SHEET FOR GENERAL CODE COMPLIANCE AND HAS ONLY MADE CHANGES TO THE SEQUENCEOF OPERATION. THE CONTRACTOR SHALL COORDINATE WITH THE CONTROL VENDOR TO FURNISH AND INSTALL A COMPLETE &OPERATIONAL SYSTEM IN COMPLIANCE WITH POPEYE'S STANDARDS AND CODE/AUTHORITIES REQUIREMENTS.THE CONTROL VENDOR SHALL PROVIDE THE FOLLOWING ADDITIONAL/REVISED CONTROL REQUIREMENTS:1. HVAC ECONOMIZER CONTROL: RTU-1,2,3 WILL BE PROVIDED WITH ECONOMIZER CONTROLS, INCLUDING FAULT DETECTION ANDDIAOGNOSTICS. CONTROL ON-OFF PANEL SHALL BE COMPATIBLE WITH ECONOMIZER OPERATION (COORD. W/MECH.)2. INTERIOR LIGHTS: PROVIDE CONTROLS AS NEEDED FOR INTERIOR TO MEET WSEC. LIGHTS TO AUTOMATICALLY TURN "OFF" WHENSTORE IS CLOSED AND "ON" WHEN STORE IS OPEN. PROVIDE A 1HR OVERRIDE FUNCTION.3. LOT LIGHTS ARE ALL 120V AND REQUIRE 1-POLE RELAYS. LIGHT CONTROL SHALL FOLLOW MODIFIED SEQUENCE OF OPERATION ANDCOMPLY WITH WSEC.4. THERMOSTAT INTERLOCK: RTU-1, 2 & 3 SHALL ALL BE INTERLOCKED TO ENSURE SYSTEMS DO NOT SIMULTANEOUSLY HEAT ANDCOOL. DINING UNIT SHALL HAVE PRIMARY CONTROL OF FUNCTION.5. RTU-1, 2 & 3: SHALL BE PROVIDED WITH (3) STAGES OF MECHANICAL COOLING, (2) STAGES OF HEATING AND (2) STAGES OF SUPPLYFAN CONTROL MEETING WSEC REQUIREMENTS. FANS SHALL RUN AT 100% AIRFLOW WHENEVER HOODS ARE OPERATIONAL. 2-STAGEFAN CONTROL SHALL ONLY BE OPERATIONAL IF HOODS ARE NOT ACTIVE.6. PROVIDE SHUT-OFF AND INTERLOCK WITH ANSUL SYSTEM FOR ALL ELECTRICAL EQUIPMENT UNDER HOODS.RENSCH ENGINEERING NOTES:M5INTERLOCK PANELDETAILSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
GAS LINES/S. CLOSUREPANEL AT ENDS18 GA. S.S. EX. DUCTGREASE EXHAUSTFANSGAS LINEGREASE LINEHOOD M.C.P.JUNCTION BOX FORGREASE LINE HEATTAPEPRINCECASTLEFIRE SUPRESSIONBOX(3) FIRE SUPRESSION PIPINGNOTE:GC SHALL INSTALL 20 GA GRADE 304 S/SPANELS 18" FROM THE EDGE OF ALL HEATPRODUCING EQUIPMENT.S/S WALL PANELS CEILINGFIRE WRAP DUCT FORZERO CLEARANCE TOCOMBUSTIBLES(SEE DETAILS).SEE HOOD DETAILSHEET NOTINGLISTED EXCEPTIONTO HOODOVERHANGREQUIREMENTSS.SCLOSUREPANEL(BEYOND) M6M61M62FRYER HOODDETAILSM62CHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
SHEET NO.SCALE:DWG.#:DRAWNDATE: BY:REVISIONSwww.captiveaire.com MASTER DRAWINGOhio Selected Accounts100 E. Campus View Blvd., Suite 250, Westerville, OH, 43082 PHONE: (614) 679-7626 FAX: (919) 800-4534 EMAIL: tim.anderson@captiveaire.comSHEET NO.SCALE:DWG.#:DRAWNDATE: BY:REVISIONSwww.captiveaire.com MASTER DRAWINGOhio Selected Accounts100 E. Campus View Blvd., Suite 250, Westerville, OH, 43082 PHONE: (614) 679-7626 FAX: (919) 800-4534 EMAIL: tim.anderson@captiveaire.comSHEET NO.SCALE:DWG.#:DRAWNDATE: BY:REVISIONSwww.captiveaire.com MASTER DRAWINGOhio Selected Accounts100 E. Campus View Blvd., Suite 250, Westerville, OH, 43082 PHONE: (614) 679-7626 FAX: (919) 800-4534 EMAIL: tim.anderson@captiveaire.comSHEET NO.SCALE:DWG.#:DRAWNDATE: BY:REVISIONSwww.captiveaire.com MASTER DRAWINGOhio Selected Accounts100 E. Campus View Blvd., Suite 250, Westerville, OH, 43082 PHONE: (614) 679-7626 FAX: (919) 800-4534 EMAIL: tim.anderson@captiveaire.comM7CAPTIVEAIRE DETAILSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
GENERAL NOTES:1. PLUMBING CONTRACTOR SHALL EXECUTE ALL WORKSO THAT IT PRECEDES WITH A MINIMUM OFINTERFERENCE WITH OTHER TRADES.2. VERIFY EXACT ROUGH-IN AND FINAL EQUIPMENTREQUIREMENTS IN FIELD.3. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLEFOR ALL FINAL CONNECTIONS TO PLUMBINGFIXTURES AND KITCHEN EQUIPMENT. THIS INCLUDES,BUT NOT LIMITED TO FURNISHINGS AND INSTALLINGALL TRAPS, DRAINS AND SUPPLIES WITH STOPS.4. THE PLUMBING CONTRACTOR SHALL VERIFY THAT ALLPIPING, AS SHOWN ON THESE DRAWINGS WILL NOTCONFLICT WITH ANY DRAINS, SCUTTLES, JOINTS,VENTS, EQUIPMENT, ETC.5. COORDINATE ROUTING AND LOCATIONS OF WASTEAND VENT PIPING WITH ALL OTHER TRADES.6. THE PLUMBING CONTRACTOR SHALL COORDINATEWITH THE GENERAL CONTRACTOR AND OTHERTRADES, ALL REQUIRED OPENINGS ANDEXCAVATIONS. ALL REQUIRED OPENINGS INFOUNDATIONS, FLOORS, WALLS, AND ROOFS SHALLBE DESIGNED INTO THE STRUCTURE INITIALLY BYTHE USE OF SLEEVES, CURBS, ETC. CUTTING ANDPATCHING SHALL BE HELD TO MINIMUM.7. ALL ITEMS PROJECTING THROUGH ROOFS SHALL BEFLASHED, A MINIMUM OF 12" ABOVE THE ROOF. ALLVENTS SHALL BE A MINIMUM OF 10' FROM ANYOUTSIDE AIR INTAKE.8. ALL FLOOR DRAINS SHALL HAVE 6" DEEP SEAL TRAPS.9. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLEFOR CONNECTING WATER SUPPLY TO THE COFFEEMAKERS TEA BREWERS AND ICE MACHINES.10. WRAP ALL CONDENSATE PIPE IN FREEZER WITH HEATTRACING TAPE AND INSULATE ALL CONDENSATEDRAIN PIPING. ROUTE COOLER AND FREEZERCONDENSATE DRAIN PIPING TO HUB DRAIN/FLOORDRAIN AS INDICATED.11. INSULATE ALL WATER AND WASTE PIPING UNDERLAVATORIES PER ADA REQUIREMENTS WITHHANDY-SHIELD JACKET BY PLUMBEREX: (619)633-1772.12. POT SINKS TO BE ANCHORED TO WALL AND SEALEDWITH SILICONE CAULKING.13. INSTALL GAS VALVE (FBC) IN GAS LINE TO COOKINGEQUIPMENT. INTERLOCK WITH HOOD FIREPROTECTION SYSTEM.VERIFY REQUIREMENTS WITHHOOD SUPPLIER. INSTALL UNIONS AT THE SOLENOIDVALVE.14. PLUMBING CONTRACTOR TO PROVIDE AND INSTALLSHUTOFF COCKS, QUICK DISCONNECTS 6" DIRT LEGS,AND FLEXIBLE LINES AT GAS EQUIPMENT.15. PROVIDE VACUUM BREAKERS AT FIXTURES WITHHOSE THREAD CONNECTIONS.16. PROVIDE DIELECTRIC UNIONS AT ALL DISSIMILARMETAL PIPE CONNECTIONS.17. LAVATORY FAUCETS SHALL LIMIT HOT WATER FLOWTO 0.5 GPM AND HOT WATER TEMPERATURE T0 110° F18. PROVIDE 1"Ø SCH 40 BLACK STL PIPE FOR GREASEDISCHARGE. RUN LINE FLUSH ON WALL BESIDEFRYERS, VERTICALLY UP IN WALL THRU CLG. SLOPELINE @ 1"/FT TOWARDS REAR OF BUILDING. RUN LINEDOWN THRU CEILING ON FACE OF EXTERIOR WALL TO75" AFF THEN THRU REAR WALL FOR DISCHARGE.HEAT TAPE TO BE INSTALLED ON ENTIRE LINE @ 5WATTS/LINEAR FT. G.C. TO PROVIDE STAINLESSSTEEL COVERS FOR LINE MOUNTED FLUSH ON WALLS(ENTIRE LENGTH - CEILING DOWN). REFER TO DETAIL7/P4.SPECIFICATIONS: SECTION 15A: PLUMBINGGENERAL PROVISIONS1. SCOPE: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT INACCORDANCE WITH THESE SPECIFICATIONS AND THEACCOMPANYING DRAWINGS TO PROVIDE A COMPLETE ANDPROPERLY OPERATING PLUMBING SYSTEM FOR THE BUILDING.OBTAIN WATER, SEWER, GAS TAPS, AND ANY OTHER REQUIREDUTILITIES AND EXTEND SERVICE FROM SAME TO BUILDING ASSHOWN ON DRAWINGS. VISIT THE SITE FOR UNDERSTANDING OFTHE WORK TO BE DONE BEFORE SUBMITTING BID. REFER TO CIVILDWGS FOR SITE UTILITIES.COORDINATE THIS WORK WITH THE WORK OF THE OTHER TRADESON THE PROJECT. ALL PLUMBING IS TO BE ROUGHED IN WHILETHE BUILDING IS BEING CONSTRUCTED AT SUCH TIMES AS NOT TODELAY THE GENERAL CONTRACTOR ON THE BUILDING.2. GENERAL REQUIREMENTS: COMPLY WITH ALL FEDERAL, STATE,AND LOCAL REQUIREMENTS, CODES, RULES, AND ORDINANCESGOVERNING WORK ON THIS CHARACTER. PAY FOR AND OBTAINNECESSARY CONSTRUCTION PERMITS AND CERTIFICATES OFINSPECTION.A. DRAWINGS: THE LOCATION OF THE PIPING RUNS AREAPPROXIMATE AND THE CONTRACTOR MUST MAKE ANYNECESSARY CHANGES IN THE PIPING RUNS, ETC., AND ATNO ADDITIONAL COST TO THE OWNER. OUTLET LOCATIONS ARECRITICAL AND MUST BE LOCATED EXACTLY ACCORDING TO THEPLUMBING PLAN. COORDINATE THIS WORK WITH THE INSTALLERSOF EQUIPMENT FURNISHED AND INSTALLED BY OTHERS. REFERTO THE OTHER DRAWINGS FOR DETAILS OF THE BUILDINGCONSTRUCTION AND THE OTHER MECHANICAL, ELECTRICAL, ANDEQUIPMENT FEATURES.B. COORDINATION AND WORKMANSHIP: SCHEDULE THIS WORK SOTHAT IT WILL BE PROPERLY COORDINATED WITH ALL OTHERTRADES. WORKMANSHIP SHALL BE IN ACCORDANCE WITH THEBEST PRACTICE FOR THE CLASS OF WORK INVOLVED.WORKMANSHIP SHALL ALLOW THE APPLIANCE TO OPERATE ASINTENDED AND BE INSTALLED TO BEST PROTECT THE PUBLIC ANDOPERATORS FROM INJURY OR DAMAGE, AND TO PRESENT A NEAT,PLEASING, AND ORDERLY APPEARANCE. ALLOW FOR APPLIANCEREMOVAL FOR CLEANING WHEN NECESSARY.MATERIALS AND PERFORMANCE1. MATERIALS: ALL MATERIALS SHALL BE NEW AND OF THE QUALITYINDICATED BY THE SPECIFIED BRAND NAMES. SUBSTITUTIONS OFMATERIAL OF EQUAL QUALITY BY OTHER FIRST-LINEMANUFACTURERS MAY BE ACCEPTABLE PROVIDED A LIST OF SUCHSUBSTITUTIONS IS APPROVED IN WRITING BY ARCHITECT. ASUBSTITUTIONS LIST SHALL BE SUBMITTED IN TRIPLICATE WITHINFIVE (5) DAYS AFTER THE CONTRACT IS LET.2. BACKFILLING: PERFORM ALL NECESSARY EXCAVATING ANDBACKFILLING REQUIRED FOR THIS INSTALLATION. PREPARE APROPER BED OF SAND OR GRAVEL OR EQUIVALENT IN ROCKSCREENINGS SO AS TO ELIMINATE SHIMMING AND VOID SPACEUNDER ANY OF THE UTILITY SERVICE PIPES. BENDING OF ANY HARDPIPE WILL NOT BE PERMITTED. WHERE A CHANGE IN DIRECTION ISNECESSARY ON PRESSURE PIPES, "COMPATIBLE" COUPLINGS OREQUAL SHALL BE USED AND BENDS MAY NOT EXCEED 90 DEGREES.ALL EXCAVATION BELOW THE BOTTOM OF FOOTINGS SHALL BEBACKFILLED WITH 2000 PSI CONCRETE. OTHER BACKFILL SHALLCONSIST OF 2-3" OF SAND OR ROCK SCREENINGS AND EARTH TO AFINAL LEVEL EQUAL TO ITS ORIGINAL CONDITION. IN THE EVENT THEBACKFILL SHOULD SETTLE BEFORE THE FINAL TOP SURFACE ISAPPLIED, APPLY ADDITIONAL BACKFILL TO SUSTAIN THE ORIGINALLEVEL. CARE SHOULD BE TAKEN TO ADDITIONAL BACKFILL TOSUSTAIN THE ORIGINAL LEVEL. CARE SHOULD BE TAKEN TOMINIMIZE THE DUST LEVEL WHEN EXCAVATING AND BACKFILLINGSO AS TO COMPLY WITH FEDERAL AND STATE E.P.A.REGULATIONS RELATING TO THIS TYPE OF WORK (FUGITIVE DUST).3. WASTE PIPING INSTALLATION: CLEANOUTS MUST BE INSTALLED ONLINES EVEN IF NOT SHOWN ON THE PLANS. USE REDUCING FITTINGSIN MAKING REDUCTIONS IN SIZE OF PIPE. REAM ALL PIPE AFTERCUTTING, THEN TURN PIPES ON END AND KNOCK OUT ALL LOOSEDIRT AND SCALE BEFORE INSTALLING. MAKE CHANGES INHORIZONTAL DIRECTION OF SOIL AND WASTE PIPES WITH LONGRADIUS FITTINGS OR WITH COMBINATION "Y" BRANCHES AND 1/8THBENDS. CONNECT SOIL STACKS AT BASE TO HORIZONTAL RUNSWITH COMBINATION "Y" AND 1/8TH BENDS.WATER SUPPLY PIPES TO FIXTURES AND WASTE PIPES FROMFIXTURES SHALL BE CENTERED IN THE PROPER PLACE RELATIVE TOTHE CENTER LINE OF THE FIXTURE. NO OFFSETS WILL BE ALLOWED.ALL PIPES SHALL BE RUN MECHANICALLY STRAIGHT AND SQUAREWITH BUILDING LINES, EXCEPT FOR REQUIRED PITCH ONHORIZONTAL LINES, AND ALL CHANGES IN DIRECTION SHALL BEMADE WITH FITTINGS. WATER PIPING TO BE ROUTED IN WALLS,UNDER THE FLOOR SLAB, AND ABOVE SUSPENDED CEILINGS ASNOTED. WHERE WATER LINES ARE ROUTED UNDER THE FLOORSLAB, NO MECHANICAL JOINTS SHALL BE MADE UNDER THE SLABEXCEPT AS LISTED BELOW. WATER PIPING SHALL BE INSTALLED NOTTO EXERT VERTICAL NOR HORIZONTAL STRESSES ON THE SEATINGOF UNIONS, UNIONS SHALL BE COPPER TYPE NIBCO #733 OR EQUAL.NO WAX, PUTTY, OR VARNISH WILL BE PERMITTED. CRACKEDFITTINGS SHALL BE REMOVED AND REPLACED WITH NEW FITTINGS.MAKE THREADED JOINTS IN BRASS PIPE AND FITTING WITH PIPETHREADING TO THE SHOULDER OF THE FITTINGS. NO SLIP JOINTSOR COUPLING JOINTS IN BRASS PIPE WILL BE PERMITTED, EXCEPTON THE FIXTURE SIDE OF THE TRAP.4. NATURAL GAS PIPING: FOR ABOVEGROUND INSTALLATIONS, ALLFITTINGS TO BE JOINED WITH GAS RATED TEFLON TAPE SEAL OROTHER SUITABLE SEAL AND MADE IN CONFORMANCE WITH THE BESTPRACTICES OF AGA AND NFPA 54. UNIONS SHALL BE CAST BLACKIRON AND INSTALLED IN A MANNER SUCH THAT NO STRESS WILL BEPLACED ON THE MALE-FEMALE SEALING SURFACES. PROPERALIGNMENT WILL BE MADE AT TIME OF INSTALLATION. ALL JOINTSAND CONNECTIONS SHALL BE THOROUGHLY CLEANED OF OIL,THREAD CUTTINGS AND RESIDUALS TO ACCEPT ENAMEL PAINT.ROUGH OR SHARP EXPOSED THREAD SURFACES SHALL BE FILEDSMOOTH. TESTING SHALL BE AS OUTLINED UNDER SECTION 15A,PARAGRAPH II, TESTS.A. MATERIALS: BLACK CARBON STEEL, SCH. 40 WITH MALLEABLEIRON THREADED FITTINGS.B. PAINTING: PAINT ALL GAS PIPING EXPOSED TO WEATHER WITHONE COAT OF PRIMER, AND TWO COATS OF RUST-PROOFPAINT. COLOR SHALL MATCH BUILDING COLORS.COORDINATE WITH G.C.5. WATER PIPE:WATER METER & BACKFLOW REQUIREMENTS SHALL BE INACCORDANCE W/ LOCAL CODES & UTILITY COMPANIES. REFER TOCIVIL DRAWINGS FOR METER, SERVICE LINES, AND CONTAINMENTBACKFLOW PREVENTER. COORDINATE WITH AHJ FOR POINT OF USEBACKFLOW PREVENTION REQUIREMENTS.JOINTS SHALL BE CLEANED AND DEBURRED AS RECOMMENDED BYTHE MANUFACTURER AND FEDERAL, STATE AND LOCAL CODESAND SOLDERED AS LISTED BELOW. FLUX SHALL BENON-CORROSIVE. ALL PIPE JOINT MATERIALS SHALL BELEAD-FREE.ABOVE GRADE - WHERE FITTINGS ARE SOLDERED BOTH FITTINGSAND TUBING SHALL BE CLEANED AS DESCRIBED ABOVE. UNDER NOCIRCUMSTANCES SHALL DISSIMILAR METALS COME INTO DIRECTCONTACT WITH COPPER TUBING, E.G., GALVANIZED STRAPPING,HANGERS, OR CLAMPS TO SECURE THE TUBING.BELOW GRADE, OR FLOOR SLAB ON EARTH OR STONE FILL - HIGHTEMPERATURE, SOLDER, 1200 DEG. F OR GREATER MELTING POINT.NOTE: WATER PIPE TO BE PROPERLY SECURED AND ALIGNED SO ASNOT TO EXERT VERTICAL OR HORIZONTAL STRESSES ON THE SEATINGOF THE MATING (MALE AND FEMALE) SURFACES OF THE UNIONS.A. MATERIALS - UNDERGROUND: TYPE "K" COPPER TUBE, SOFTTEMPERB. MATERIALS - ABOVEGROUND: TYPE "L" COPPER TUBE, HARDDRAWNC. INSULATION: INSULATION FOR HOT AND COLD WATER PIPINGSHALL BE 1/2" THICK ARMAFLEX UL LABELED OR 1" FIBERGLASS25/50 WITH ASJ/SSL FOIL/VINYL JACKET OR EQUAL. INSULATE ALLPIPING AND FITTINGS.(NOT TO EXCEED K = 0.37 BTU*INCH/H*FT*F)6. WASTE PIPING: INSTALL HORIZONTAL WASTE PIPING AT MINIMUM 2%SLOPE. IF 1% IS REQUIRED, APPLY TO AHJ AND ENGINEER OFRECORD FOR APPROVAL PRIOR TO INSTALLATION.A. MATERIALS (SANITARY/GREASE WASTE & VENT): PVC SCH. 40,SOLID CORE (ASTM 2665), WITH SCH. 40 DRAINAGE PATTERN PVCFITTINGS AND SOLVENT CEMENTED JOINTS WITH TINTED PRIMER.EXCEPTION: SEE PLAN NOTES AND RISER DIAGRAM FOR U/GGREASE WASTE LINE BETWEEN COOKING LINE FLOOR DRAINAND GREASE WASTE MAIN. THIS LINE SHALL BE INSTALLEDWITH SERVICE WEIGHT, COATED & LINED, CAST IRON SOIL PIPEWITH MECHANICAL HUB & SPIGOT PUSH-ON JOINTS.B. MATERIALS (ABOVEGROUND INDIRECT DRAIN AND CONDENSATEDRAIN LINES): TYPE "M" COPPER TUBE, HARD DRAWN, WITHCOPPER OR BRASS DRAINAGE PATTERN FITTINGS AND SOLDEREDJOINTS.C. INSULATION: INSULATE ALL ABOVEGROUND INDIRECT WASTE ORCONDENSATE DRAIN LINES COLLECTING COLD CONDENSATEFROM REFRIGERATION, HVAC EQUIPMENT OR ICE BINS/COLDDRAINS. INSULATION SHALL BE 1/2" THICK ARMAFLEX, OR EQUAL.D. HEAT TRACING: HEAT TRACE ALL CONDENSATE DRAIN LINESINSIDE COOLERS AND FREEZERS AT 5 WATTS/LINEAR FOOT(MINIMUM).7. PIPE SLEEVES/ESCUTCHEONS: PROVIDE CHROME-PLATEDESCUTCHEONS ON ALL PIPES PASSING THROUGH WALLS, FLOORS,OR CEILINGS OF FINISHED ROOMS. ESCUTCHEONS TO BE BEATON &CADWELL, #10, 40, 6A OR EQUIVALENT WITH SET-SCREWS. PROVIDEESCUTCHEONS ON ALL WASTE LINES FROM PLUMBING FIXTURES,WHETHER THROUGH WALLS, FLOORS, AND WHETHER CONCEALEDBEHIND COUNTERS OR EXPOSED. PIPE SLEEVES SHALL BEPROVIDED WHEN PIPES PENETRATE FOUNDATION AND SHALL BE 1"LARGER THAN PIPE, SEAL SLEEVE WITH CAULKING.8. PLUMBING FIXTURES: FURNISH AND INSTALL PLUMBING FIXTURESAS SHOWN ON DRAWINGS WITH ALL ACCESSORIES AND TRIM ASLISTED. ALL FIXTURES SHALL BE PROTECTED THROUGH THECOURSE OF THE CONSTRUCTION. ANY FIXTURE DAMAGED SHALL BEREPLACED WITHOUT ADDITIONAL EXPENSE TO THE OWNER.9. CONNECTION TO OTHER FIXTURES: CONNECT BUILDING SERVICEPIPING, INCLUDING BUT NOT LIMITED TO WATER, DRAIN, AND GASPIPES TO FOOD SERVICE EQUIPMENT AS INDICATED IN EQUIPMENTSPECIFICATIONS. PROVIDE BACKFLOW PROTECTION ON ICEMACHINES AND BEVERAGE EQUIPMENT SUPPLY CONNECTIONS INACCORDANCE WITH AHJ REQUIREMENTS.10. TESTS:A. DRAINAGE AND VENT PIPING - DRAINAGE AND VENT PIPING SHALLBE TESTED BEFORE THE PLUMBING FIXTURES ARE INSTALLED BYCAPPING THE OPENINGS AND FILLING THE ENTIRE SYSTEM WITHWATER AND ALLOWING IT TO STAND THUS FILLED NOT LESS THANONE (1) HOUR. INSPECT WATER LEVEL TO DETERMINE IF PIPING ISTIGHT.B. WATER PIPING - THE WATER SUPPLY PIPING LINES SHALL BETESTED BEFORE THE PLUMBING FIXTURES ARE CONNECTED BYFILLING THE ENTIRE SYSTEM WITH POTABLE WATER ANDAPPLYING HYDROSTATIC PRESSURE OF 100 PSI AND ALLOWINGTO STAND FOR NOT LESS THAN FOUR (4) HOURS AT THISPRESSURE TO PROVE PLUMBING INTEGRITY.C. GAS PIPING - IN ADDITION TO ANY LOCAL REQUIREMENTS, GASPIPING SHALL BE FILLED WITH COMPRESSED AIR TO 150 PSI ANDHELD FOR A PERIOD OF FOUR (4) HOURS. EACH JOINT SHALL BECHECKED BY LIQUID SOAP OR SPECIAL LIQUID CHEMICAL FORLEAKS. NOTE: REMOVE ALL GAS VALVES AND PROTECT FROMDAMAGE BEFORE TESTING SYSTEM.11. DISINFECTION OF POTABLE WATER SYSTEM: UPON COMPLETION OFINSTALLATION DISINFECT THE WATER SYSTEM BY FILLING IT WITHSOLUTION CONTAINING 50 PARTS PER MILLION OF CHLORINE ANDALLOW IT TO STAND FOR NOT LESS THAN SIX (6) HOURS BEFOREFLUSHING THOROUGHLY AND RETURNING TO SERVICE. FURNISHCLEAN WATER SAMPLES TO THE LOCAL AUTHORITY FOR TESTINGAFTER THE LINES HAVE BEEN DISINFECTED. THIS PROCEDURE TOBE IN ACCORDANCE WITH STATE PLUMBING CODE.12. CLEANUP: CLEAN ALL PLUMBING FIXTURES AND EQUIPMENTTHOROUGHLY BEFORE FINAL INSPECTION, LEAVING ALL READYFOR USE. ALL AERATORS, FLUSH VALVES, AUTOMATIC VALVES, ETC.SHALL BE CLEANED BEFORE FINAL HANDOFF TO OWNER.13. EXTENDED WARRANTY: WARRANT IN WRITING ANY EQUIPMENT ORMATERIALS USED IN THE INSTALLATION HAVING AN EXTENDEDWARRANTY AS OFFERED BY THE MANUFACTURER. PROVIDE NEWOR REBUILT ASSEMBLIES TO THE SITE FOR ANY SUCH EQUIPMENTOR MATERIALS WHICH FAIL DURING THIS PERIOD, AND INSTALL ATNO ADDITIONAL COST TO THE OWNER.14. OWNER'S MANUAL: PROVIDE THE OWNER, AT THE COMPLETION OFTHIS CONTRACT, WITH AN "OWNER'S MANUAL" SO LABELED. ASECOND LIKE MANUAL SHALL BE PREPARED AND FORWARDED TOTHE ARCHITECT FOR "JOB RECORDS". THE MANUAL SHALL CONSISTOF A THREE-RING LOOSE-LEAF BINDER CONTAINING ALL PRINTEDMATTER SUCH AS: GUARANTEE CARDS, CLEANING INSTRUCTIONS,NOTICES TO OWNER, OPERATING MANUALS, AND MAINTENANCEINSTRUCTIONS THAT MAY BE CONTAINED IN THE SHIPPINGCARTONS OR HOUSING OF EQUIPMENT AND ARCHITECTURALSPECIALTIES.P0SPECIFICATIONS ANDNOTESCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565WASHINGTON STATE 2018 ENERGY CODE PROJECT SUMMARYCODE PROVISIONREQUIREMENTS- NEED TO PROOF AND REVIEWEFFICIENT HEATED WATER SUPPLY PIPING(MAXIMUM ALLOWABLE LENGTH OF HOT WATER PIPING)MAXIMUM LENGTH OF FINAL BRANCH FROM HOT WATERCIRCULATION SYSTEM TO FIXTURE SHALL NOT EXCEED THEFOLLOWING PER TABLE C404.3.1:PUBLIC LAVATORY 1/2"= 2 FTALL OTHER FIXTURES AS FOLLOWS:1/2" = 43FT, 3/4"= 21FT, 1"= 13FTHEAT TRAP(WATER HEATER)WATER HEATERS SHALL BE PROVIDED WITH INTEGRAL HEAT TRAPSOR BE PROVIDED WITH HEAT TRAPS ON THE SUPPLY ANDDISCHARGE PIPES.WATER HEATER INSTALLATIONINSTALL WATER HEATER ON AN R-10 INSULATED SURFACE WHENINSTALLED IN UNCONDITIONED SPACES OR ON A CONCRETE FLOOR.PIPING INSULATIONALL HOT WATER SUPPLY PIPING SHALL BE INSULATED PER SECTIONC404.6 AND THESE PLANS.HOT WATER CIRCULATION SYSTEMSTHE CIRCULATION SYSTEM SHALL BE PROVIDED WITH A PUMP ANDHOT WATER RETURN LINE. PROVIDE A TIMECLOCK TO TURN THECIRCULATION SYSTEM OFF DURING NON-BUSINESS HOURS ANDTEMPERATURE SENSING CONTROLS AND THERMOSTAT TO TURNTHE PUMP ON/OFF DURING BUSINESS HOURS TO MAINTAIN THELOOP TEMPERATURE SETPOINT.COMMISSIONINGCOMMISSIONING OF THE SERVICE WATER HEATING SYSTEM IS NOTREQUIRED SINCE THE LARGEST WATER HEATER IS LESS THAN 200MBH.
TRASHROUGH-IN PLAN1/4"=1'-0"F15F15F15PLAN NOTESPLUMBING FIXTURE SCHEDULEALL VITREOUS CHINA FIXTURES SHALLBE WHITE.2.NOTES:1.FS-B3" - -FS-AFD-B3" - -1/2"-FD-AP-33" -1-1/4" 1/2"P-14" 1-1/2" -HWMARK FIXTURECONN.WCWMANUFAC.& MODELMOP SINKW/FAUCETWATERHEATERWH-1MS-11/2"-3"1" 1"RINNAIR94LSi1/2"FIATMSB 36243"HUBDRAINCLEANOUTFLOORCLEANOUTGRADECLEANOUTWALLHYDRANTGCOWHDWCOFCOHD-14"3/4"WALL-RISERSEEPIP SERIES-WOODFORDMODEL 65--PLASTICODDITIESPGI-622R4"ODDITIES----PLASTICODDITIESPCO-700R--PLASTICFIXTUREDESCRIPTIONMARKCWCONN.WHW& MODELMANUFAC.PROVIDE WITH METAL RINGW/ S/S COVER PLATESSA-600ADJUSTABLE CLEANOUT ASSEMBLY WITHBRONZE COVER AND METAL RINGDESCRIPTIONANTI-SIPHON, AUTO DRAINING, W/ VACUUMBREAKER, FREEZLESS WALL HYDRANT, 3/4"MALE HOSE THREAD NOZZLEMOLDED STONE 36X24, FAUCETW/VACUUM BREAKERS, 830-AA, BASE &BRACKET 832-AA.INSTANTANEOUS NATURAL GAS, 199,000 BTUHINPUT, EF-0.82 SEALED COMBUSTION DIRECT VENT,4.2 GPM @ 80°F RISE. PROVIDE WITH MODEL MCCWALL MOUNTED CONTROLLER. REFER TO DETAIL9/P4.120VINSULATE ALL WATER AND WASTE PIPINGUNDER LAVATORIESP-24" 1-1/2" -PLUMBING FIXTURE SUMMARYFIXTUREDRAINF.U.QTY.WASTESANWASTEGREASEF.U.TOTALCOLD WATERCWF.U.CWTOTALHOT WATERHWF.U.HWTOTALWATER CLOSET (P1, P2)LAVATORY (P3)HAND SINK (N10)PREP SINK (A35L) **3-COMP SINK (D40) **HOSE BIB (WHD)WATER FILTERFLOOR DRAIN (FD-A)(EMERG.)FLOOR DRAIN (FD-B)(EMERG.)HUB DRAIN (HD)FLOOR SINK (FS-A, FS-B)MOP SINK (MS-1)TOTAL24222004323321193815828621352.0331.513 3 3.0 3.0 2.25 2.257026.0 4.51.50.751.532.2534.5104500126600124576293.5 12.75BASED ON 2015 UPC CHAPTER 6 - PLUMBING93.5 FU AT 55 PSI AND 200FT =12.75 FU AT 55 PSI AND 200FT =USE MIN. 1-1/2" COLD WATER SERVICEUSE MIN. 1" HOT WATERGREASE WASTE = 81 DFU USE 4" SANITARY (GREASE) AND 1500 GALLON GREASEINTERCEPTOR (172 DFU)TOTAL SANITARY = 10 DFU USE 4" SANITARY** FIXTURE HAS INDIRECT WASTE TO FLOOR SINK.PLUMBING LEGENDXXXFD-C 4"--WATERCLOSET(HANDICAP)WATERCLOSET(HANDICAP)LAVATORY(HANDICAP)FLOORDRAINFLOORDRAINFLOORSINKFLOORSINKAM. STD.3043.001AM. STD.3043.001AM. STD.9140.047JAY RSMITHD2005PLASTICODDITIESPFS-300-TZURNZ-1900-2-3312"X12"X6"A.R.E.3" FLOOR SINK, 12"X12" A.R.E SANI-FLORRECEPTOR, ANTI SPLASH STRAINER,ACID RESIST. PORCELAIN ENAMELINTERIOR AND SQ. TOP3" FLOOR SINK WITH DOME TOPSTRAINER, AND 3/4" GRATEHEAVY DUTY ADJUSTABLE DRAIN WITH 6"NICKEL STRAINER W/ROUND TOP & 12"TRAP PRIMER CONNECTION.WALL HUNG WITH SINGLE FAUCET HOLE,KOHLER K-13460 0.5 GPM BATTERYPOWERED METERED FAUCET.SAME AS "P-1" EXCEPT WITH RIGHT-HANDTRIP LEVER.HEAVY DUTY ADJUSTABLE DRAINWITH 8" NICKEL BRONZE STRAINERW/ROUND TOP & 12" TRAP PRIMERCONNECTION.VITREOUS CHINA, 16-3/4" HIGH ELONGATEDBOWL, 1.6 GPF, SIPHON JET; W/ ZURNZ-6000-WS1-YBYC FLUSH VALVE MOUNTED 11"ABOVE WATER CLOSET; CHURCH 9500CT OPENFRONT SEAT, WHITE SOLID PLASTIC.6A92K-402.25 2.252.25&JAY RSMITHD3811-1"CIRCULATIONPUMPTACO006E3LEAD FREE ECM HIGH EFFICIENCY HOTWATER CIRCULATOR. 120V/60HZ/1PH 44WCP-1-EWH-1 - 1" 1"ELECTRICWATERHEATERAO SMITHDEL-66 GALLON ELECTRIC WATERHEATER. SINGLE 1.5kW HEATINGELEMENT. 120V/1PHHUB DRAIN WITH STRAINER. CAST IRONWITH ACID RESISTANT COATED INTERIORAND EXTERIORJAY RSMITHD2005GGIEXTERIORGREASEINTERCEPTOROLDCASTLE1500PRE CAST EXTERIOR CONCRETE GRAVITYGREASE INTERCEPTOR WITH 3" VENT.SEE CIVIL PLANS AND DETAIL.4" - -P1P11WASTE AND VENT PLANCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
FCS1-POPFCS1-POPGRAINGRAINGRAINGRAINGRAINGRAINGRAINFMFT250FMFT250FMFT251GRAINGRAINGRAINGRAINGRAINGRAINGRAINFMCT310AFMCT310AFMCT310AFMCT310AFMCT310AFMCT310AFMCT310AFMCPP318A FMCPP318AFMCPP318A FMCPP318AFMCPP318A FMCPP318AFMCPP318A FMCPP318ATRASH1/4"=1'-0"F15F15F15TRAP PRIMER VALVE EQUAL TO PRECISION PLUMBING PRODUCTS OREGON-1, WITHMULTI-LINE DISTRIBUTION MANIFOLD. LOCATE IN WALL WITH ACCESS PANEL. ROUTE1/2" TYPE "L" SOFT COPPER TRAP PRIMER LINES DOWN TO BELOW FLOOR TOCONNECTIONS AT FD. ALL NOT SHOWING IN PLAN COORDINATE WITH GC.1-1/2" AUTOMATIC GAS VALVE EXPOSED 6" BELOW CEILING HEIGHT. PROVIDED BYOWNER INSTALLED BY CONTRACTOR. INTERLOCK WITH HOOD SUPRESSION SYSTEM.REDUCE FROM 2" AT INLET, AND INCREASE TO 2" AT OUTLET. PROVIDE 2" UNION ONINLET AND OUTLET.TEMPERING VALVE SET AT 110° TO REST ROOM LAVATORIES, LOCATE BELOW SINKMAINTAIN ADA CLEARANCES. REFER TO DETAIL 14/P4.1-1/2" DOMESTIC WATER SERVICE, REFER TO DETAIL 10/P4. SITE WATER METER ANDCONTAINMENT BACKFLOW PREVENTER BY CIVIL (CONFIRM).3/4" COLD WATER DOWN IN WALL TO BELOW EQUIPMENT @ + 4" AFF.RUN 3/4" COLD WATER PIPING UNDER EQUIPMENT TO CONNECTIONS.INSTALL 1/2" FPT ADAPTERS AND BOOSTERS BEFORE THE FILTRATION SYSTEMGAS PIPING EXTENDED UP THRU ROOF TO HVAC UNIT SEE DETAIL 8/SH P4.NATURAL GAS METER, UNDERGROUND GAS SERVICE LINE, AND GAS SERVICEREGULATOR BY LOCAL GAS COMPANY. COORDINATE INSTALLATION AND PAY ALLASSOCIATED FEES. EXTEND GAS UP EXTERIOR WALL TO ABOVE CEILING, AND INTOBUILDING. REFER TO GAS LOAD SUMMARY AND GAS RISER DIAGRAM - SHEET P3.3/4" DUAL CHECK BACKFLOW PREVENTER IN FILTER SUPPLY LINE TO BEVERAGE AREA.LOCATE IN ACCESSIBLE AREA WITHIN CABINET.REFER TO CIVIL DRAWINGS FOR CONTINUATION.1" H&CW AND 1-1/2" NATURAL GAS DOWN TO INSTANTANEOUS GAS WATER HEATERMOUNTED ON WALL ABOVE MOP SINK. REFER TO DETAIL 9/P4.WATER FILTER MOUNTED ON WALL ABOVE BAG-IN-BOX SYSTEM. STUB-OUT WATERSUPPLY @ 8'-4" A.F.F. SEE DETAIL 12/P4.GAS DOWN, EXPOSED ON WALL. EXTEND UNDER EQUIPMENT TO FINAL CONNECTIONS.PROVIDE PLUG VALVE, REDUCER, AND FULLY RATED, LISTED FLEX SUPPLY ATCONNECTION.1/2" DUAL CHECK BACKFLOW PREVENTER IN SUPPLY LINE TO ICE MACHINE. LOCATE INACCESSIBLE AREA ON WALL AT 48" AFF.PLUMBING LEGENDXXXGENERAL NOTEFOR ALL FLOOR DRAINSP2WATER AND GAS PLANCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565PLUMBING SCHEDULESITEM#QTYDESCRIPTIONCOLD_WATER HOT_WATERFILTERED_WATER WATER_AFFWASTE_DIRECT WASTE_INDIRECTDRAIN_AFFGAS_SIZE GAS_AFFMBTUHPLUMBING_REMARKSA18.U62FRYER, (3) 125LB VAT 20", GAS- - - - - - - 0.75 18 116 -A24.U 12 VAT GAS FRYER BATTERY, 31"- - - - - - - 0.75 18 180 -A35.L 1 1 COMPARTMENT SINK 52" RIGHT HAND DRAIN BOARD 0.5 0.5 - 18 -1.5FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKA35.R11 COMPARTMENT SINK 72" LEFT HAND DRAIN BOARD 0.5 0.5 - 18 -1.5FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKA46 1PORTABLE BREADER/BLENDER/SIFTER- - - 18 - 0.5 FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKA47.3 1 BATTER SIFTER STATION LH 86" - - - 18 - 1.0 FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKA47.31BATTER SIFTER STATION RH 86" - - - 18 - 1.0 FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKD29 1PACKING STATION W/CUP DISPENSER & DIPPER WELL42"1.0 - - 18 - 1.0 FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKD40 1 3 COMPARTMENT SINK 94" 0.5 0.5 - 18 -1.5FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKD702DISPENSER, HOT WATER W/WALL BRACKET- - 0.5 50 - - - - - - WATER FROM WATER FILTERD81 1 RETHERMALIZER WATER TANK 0.50 - - 18 - 1.50 - - - - -E10.1 1WALK-IN COOLER/FREEZER- - - - - - - - - - REFER TO WIB MANUFACTURER SHOP DRAWINGSE30.84 1 CHICKEN CRATE VAT 84" - - - - -1.5- - - - VERIFY WITH MANUFACTURING SHOP DRAWINGSK102REMOTE CONDENSER - - - - - - - - - -PC TO CONNECT REFRIGERATIONLINES FROM REMOTE CONDENSER TO ICE MACHINE/VERIFY LOCATION OF REMOTE CONDENSERK102ICE MACHINE REMOTE COOLED 855LB - - 0.5 50 . 0.75 FLOOR SINK - - - PC TO CONNECT WATER FROM FILTER AND TO EXTEND DRAIN TO FLOOR SINKK11 1ICE BIN, 430 LB- - - - - 0.75 FLOOR SINK - - - PC TO CONNECT DRAIN AND TO EXTEND TO FLOOR SINKK201WATER FILTER 0.75 - 0.7572-- -----K312CARBONATOR - - 0.375 84 - - - - - - WATER FROM WATER FILTERK31 1SODA SYSTEM, DROP IN 8V W/ICE- - 0.5 18 - 0.75 FLOOR SINK - - - PC TO CONNECT WATER FROM FILTER AND TO EXTEND DRAIN TO FLOOR SINKK3218V SODA SYSTEM W/ICE- - 0.5 18 - 0.75 FLOOR SINK - - - PC TO CONNECT WATER FROM FILTER AND TO EXTEND DRAIN TO FLOOR SINKK71 1 ICED TEA BREWER - - 0.5 50 - 0.75 - - - - -N10 3HAND SINK, W/ HAND FREE LEVER0.5 0.5 - 2.0 - - - -CONFIRM SCHEDULED ITEMS BELOW WITH MOST CURRENT KITCHEN EQUIPMENT SCHEDULE.
P3P31RISER DIAGRAMCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565
LOW PRESSURE NATURAL GAS SUPPLY, SEEPLANS FOR CONTINUATIONCONCENTRIC VENT - INSTALL PER MANUF.REQUIREMENTSSECURE TO WALL PER MANUFACTURER'SRECOMMENDATIONSUNION (TYP X 3)8" LONG CAPPED DIRT LEGINSTANTANEOUS GAS WATER HEATERREDUCER, LOCATE WITHIN 3" OF WATERHEATER CONNECTION (TYP X 3)LISTED GAS VALVE IN ACCESSIBLELOCATIONFROM CW SERVICE1" BALL VALVE IN ACCESSIBLELOCATIONDIELECTRIC UNION (TYP.)THERMAL EXPANSION TANKWITH NSF LINER. SIZE PERMANUFACTUREREQUIREMENTS AMTROL OREQUAL.ASME RATED TEMPERATURE &PRESSURE RELIEF VALVE. EXTENDFULL-SIZED DISCHARGE TO SPILL INTOMOP SINK3/4" DRAIN VALVE5/8" CONDENSATE CONNECTION. CONNECTTO DRAIN LINE AND ROUTE TO MOP SINK.(TYP.)EZ-CONNECT CABLE TO BE FURNISHED BYCONTRACTOR AND USED TO CONNECTWATER HEATERS TOGETHER.CONFIRM PIPING SCHEMATIC SHOWNMATCH MANUFACTURE INSTALLATIONINSTRUCTIONS. SET WATER HEATERS TO140° F.NOTE:PROVIDE DIRECTCONNECTION FOR 1OR MORE BASINS IFREQUIRED BY AHJ.NOTES:1. ALL PIPE MATERIALS SHALL BE APPROVED BY AUTHORITIES HAVING JURISDICTION IN GREASE INTERCEPTOR2. SHIFT INSPECTION TEE DIRECTLY UNDER MANHOLE.3. GREASE INTERCEPTOR SHALL BE F&I PER AHJ REQUIREMENTS.4. SEE PLUMBING PLANS FOR SPECIFICATION.5. SEE CIVIL PLANS FOR INSTALLATION, EXCAVATION, BEDDING/BACKFILL REQUIREMENTS.1"1" CWTO MOP SINKELECTRICWATERHEATERT&PRELIEFEXPANSION TANK(SIZE AS NEEDED)HEAT TRAPTEMPERATUREWELL SENSOR &AQUASTAT1" HW (120°) TO SINK FIXTURES(REQUIRES TMV AT ALL LAVATORIES)1" 140° HWTMVTEST CONNECTION N.C.120°FPURGE VALVE N.C.CIRCULATION PUMPTHERMOMETER3/4" HWR FROM120°F FIXTURES1"P4P41P45P49P413P414P412P411P410P46P42P43P47P44P48PLUMBING DETAILSCHECKED:DATE:EXPRESS WRITTEN PERMISSIONFROM THE OWNER.POPEYES LOUISIANA KITCHEN, INCREPRODUCED WITHOUT THETHESE DRAWINGS ARE THEMIAMI, FL 33126AND SHALL NOT BE USED OR5505 BLUE LAGOON DRIVEPROPERTY OF LOUISIANA KITCHEN PLK DESIGN STANDARDSDUAL-LINE PRODUCTIONNEW PLK1846 - NOLA PROTOTYPEPOPEYES RESTAURANT2812 Colby AvenueEverett WA 98201(425) 252-2153 pwww.2812architecture.com02/12/2021CHRIS RENSCH, PEREVISIONSPROJECT #20C-42181405 YELM AVE EAST (SR 510)YELM, WASHINGTON 98597LLC111 AVE. C SUITE 104, SNOHOMISH, WA 98290PH: 360-863-6677www.renschengineering.comFX:360-863-3565