Loading...
[40790] Yelm Middle School - PSE - City of Yelm ROW - Permit Plan SetCUSTOMER CONTACTS WAVE CONTACTS CUSTOMER CONTACT: ALTERNATE CONTACT: CONSTRUCTION MANAGER: PROJECT MANAGER: SCOPE OF WORK AERIAL CONSTRUCTION: PERMITS: UNDERGROUND CONSTRUCTION: SITE CONSTRUCTION: EASEMENTS: OVERVIEW VICINITY GENERAL NOTES PAGE INDEX TITLE1 PAGE ID 1 2 3 4 DESCRIPTION PLAN VIEW PHOTOS TRAFFIC CONTROL PLANS [40790] Yelm Middle School - PSE / City of Yelm ROW - Permit Plan Set TITLE PAGE 401 Coates Ave . NW Yelm, WA 98597 PLAN DATA * DRAWINGS ARE NOT TO BE SCALED , WRITTEN DIMENSIONS TAKE PRECEDENCE. * THIS SET OF PLANS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY . * PLAN DATA & ROW LOCATIONS ARE APPROXIMATE. STANDARDS * COORDINATE WITH SITE CONTACT MINIMUM 24 HOURS PRIOR TO STARTING ANY WORK ON PRIVATE PROPERTY. * ALL WORK AREAS TO COMPLY WITH OSHA/WISHA SAFETY STANDARDS . * ALL EFFORT TO PREVENT CONTAMINATION FROM CONSTRUCTION DEBRIS WILL BE TAKEN . SITE CONSTRUCTION * ALL CONSTRUCTION TO MEET NESC SAFETY STANDARDS. * WORK AREA WILL BE RESTORED TO “AS IS” OR “BETTER THAN” CURRENT CONDITIONS. * ALL EXTERIOR AND INTERIOR BUILDING PENETRATIONS TO BE WEATHER SEALED AND /OR FIRE CAULKED. * EXISTING UNDERGROUND UTILITIES ARE TO BE LOCATED. * FIELD VERIFICATION BY APPROVED METHODS REQUIRED BEFORE DIGGING OR TUNNELING COMMENCES . * NEW UNDERGROUND FACILITIES ON PRIVATE PROPERTY WILL BE A MINIMUM OF 30" IN DEPTH. * HARD SURFACE RESTORATION (ASPHALT OR CONCRETE) WILL BE RESTORED WITHIN 3 WEEKS OF JOB COMPLETION OR AS WEATHER PERMITS. * CONDUIT ENDS SHALL ONLY TERMINATE INSIDE WAVE OR CUSTOMER OWNED VAULTS . * ALL CONDUIT WILL BE SEALED WITH EXPANDABLE FOAM OR DUCT PLUGS , IN LAST VAULT BEFORE THE BUILDING * ALL CONDUIT WILL HAVE A DEDICATED LOCATE WIRE AND ADDITIONAL PULLING LINE FOR FUTURE . MATERIALS *MATERIALS SPECIFICATIONS SHEETS CAN BE PROVIDED UPON PROPERTY OWNER REQUEST . KLAYTON PIKE 425-229-3503 kpike@wavebroadband.com INSTALL (3) ANCHORS SEE SITE PLAN SET N/A PSE CITY OF YELM - ROW NEW ATTACH FOOTAGE = 586' OVERLASH FOOTAGE = 224' RISER FOOTAGE = 0' U/G NEW CONDUIT FOOTAGE = 0' U/G PULL THROUGH EXISTING TOTAL FOOTAGE = 20' PROJECT TOTAL ROW FOOTAGE = 830' INSTALL (1) ¼” STRAND W / (1) 72ct FIBER TO PSE POLES OVERLASH (1) 72ct FIBER TO PSE POLES INSTALL (1) ¼" STRAND OVERHEAD GUY INSTALL (3) DOWNGUYS PULL THROUGH EXISTING RISER PROJECT NAME: PROJECT NUMBER : LOCATION: AUTHOR: CHRISTOPHER.GIBSON@WAVEBROADBAND .COM 425-429-5052 Yelm Middle School 300590421 - 40790 S19 T17N R2E SHAURI LEVI 925-459-4965 slevi@wavebroadband.com JONATHAN MAYNARD 360-458-6585 Jonathan_maynard@ycs.wednet.edu ZACKARY MENDEL Zachary _mendel@ycs.wednet.edu LEGEND DETAIL EXISTING AERIAL FACILITIES OVER LASH AERIAL FACILITIES NEW AERIAL NEW FIBER OPTIC CABLE DISTRIBUTION POLE NEW DOWN GUY SPLICE ENCLOSURE PLAN VIEW2 4 3 1 INSTALL (1) ¼” STRAND W / (1) 72ct FIBER TO PSE POLES 5 PULL THROUGH EXISTING RISER OVERLASH (1) 72ct FIBER TO PSE POLES 2 3 INSTALL (1) ¼" STRAND OVERHEAD GUY 4 INSTALL NEW ANCHOR AND DOWNGUY PROJECT NAME: PROJECT NUMBER : LOCATION: AUTHOR: CHRISTOPHER.GIBSON @WAVEBROADBAND .COM 425-429-5052 Yelm Middle School 300590421 - 40790 S19 T17N R2E SEQUENCE # 1 559427-147350 46.943682 Neutral Secondary Secondary Loop Comcast WAVE overlash -122.609529 29' 10" 29' 10" 28' 5" 23' 0" 21' 6" SEQUENCE # 2 559421-147358 46.943357 Neutral Comcast WAVE overlash -122.608943 30' 6" 26' 0" 25' 0" SEQUENCE # 2 559413-147358 46.943178 Neutral Secondary Secondary Loop Street Light Comcast WAVE new attach -122.608938 27' 11" 27' 6" 26' 11" 24' 10" 21' 2" 20' 2" SEQUENCE # 1 559404-147350 46.942878 Neutral Secondary Secondary Loop Comcast WAVE new attach -122.609299 30' 2" 30' 2" 29' 1" 23' 3" 22' 3" SEQUENCE # 3 559421-147363 46.943369 Neutral Comcast WAVE overlash -122.608804 32' 4" 24' 0" 22' 10" SEQUENCE # 4 559432-147373 46.943677 Neutral Comcast WAVE new attach -122.608454 29' 6" 22' 11" 21' 11" SEQUENCE # 5 559443-147381 46.943982 Neutral Secondary Street Light Comcast WAVE new attach -122.608092 30' 3" 30' 3" 26' 3" 23' 3" 22' 3" SEQUENCE # 6 559450-147392 46.944302 Neutral Secondary Street Light Power Riser Secondary Loop Comcast WAVE new attach -122.607681 30' 0" 28' 0" 27' 0" 26' 6" 26' 0" 21' 4" 20' 4" 2 1 4 4 5 SEQUENCE # 1 559427-147350 46.943682 Neutral Secondary Secondary Loop Comcast WAVE overlash -122.609529 29' 10" 29' 10" 28' 5" 23' 0" 21' 6" SEQUENCE # 2 559421-147358 46.943357 Neutral Comcast WAVE overlash -122.608943 30' 6" 26' 0" 25' 0" SEQUENCE # 2 559413-147358 46.943178 Neutral Secondary Secondary Loop Street Light Comcast WAVE new attach -122.608938 27' 11" 27' 6" 26' 11" 24' 10" 21' 2" 20' 2" SEQUENCE # 1 559404-147350 46.942878 Neutral Secondary Secondary Loop Comcast WAVE new attach -122.609299 30' 2" 30' 2" 29' 1" 23' 3" 22' 3" SEQUENCE # 3 559421-147363 46.943369 Neutral Comcast WAVE overlash -122.608804 32' 4" 24' 0" 22' 10" SEQUENCE # 4 559432-147373 46.943677 Neutral Comcast WAVE new attach -122.608454 29' 6" 22' 11" 21' 11" SEQUENCE # 5 559443-147381 46.943982 Neutral Secondary Street Light Comcast WAVE new attach -122.608092 30' 3" 30' 3" 26' 3" 23' 3" 22' 3" SEQUENCE # 6 559450-147392 46.944302 Neutral Secondary Street Light Power Riser Secondary Loop Comcast WAVE new attach -122.607681 30' 0" 28' 0" 27' 0" 26' 6" 26' 0" 21' 4" 20' 4"3 4