Loading...
2021.0170.PR0006 21-006-PRELIM LANDSCAPE3.013.023.02B3.013.023.02B3.013.023.02B3.013.023.02B3.023.023.02B3.023.023.02B3.023.023.02B3.023.023.02BSHVSS3.033.053.05B3.033.053.05B3.033.053.05B3.033.053.05A3.023.023.02B3.023.023.02A3.023.023.02A3.023.023.02BSSSSSSEVSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGSSSSSSSSSSSSGSGSSEVSHSSEVGGSS S S ABCDSGSSSEVSSEVSLOT 56LOT 2LOT 193rd Ave SEKillion StYelm Ave. SESR 510Longmire St SEDurant St L o n g m i r e S t S E SW Solberg StSW Edwards StSW R a i l r o a d S tSR 510Yelm Ave. SESW Mosman AveSt a t e H i g hw a y 507 S E SW Berry Valley RoadCITY OF YELMThompson CreekPROPOSED SITETAHOMA BLVD.Thompson CreekPH IIDIV IIPH IIDIV IPH IDIV IPH IDIV IIPH IIDIV IIIPRELIMINARY LANDSCAPE PLAN1 1" = 20'TAHOMA TERRA PHASE II - DIV. 3 MF14301 TAHOMA BLVD SE, YELM, WA 98597TAHOMA TERRA HOLDINGS, LLCP.O. BOX 73790PUYALLUP, WA. 98373NHATTONPANTIERGODATVICINITY MAPPROJECT PROPONENT21-006 LAC.dwg10' LANDSCAPESETBACKINDEX:JOB:SHEET:AGENCY NO.OFDRAWN BY: CHECKED BY: DESIGNED BY: SCALE: DATE: V H ENGINEERS TEL: 360.943.1599 FAX: 360.357.6299 OLYMPIA, WA 98506 3910 MARTIN WAY E, SUITE B HATTON SURVEYORS PANTIER hattonpantier.com GODAT AND REVISIONS:DATE:TAHOMA TERRA PHASE II - DIV. 3 MF 14301 TAHOMA BLVD SE, YELM, WA 98597 1A PORTION OF THE SE 1/4 OF SECTION 23 TOWNSHIP 17 NORTH, RANGE 1 EAST, W.M. DL CA, DL MARCH 2021 CAE:\landscape\21-000\21-006\21-006CITY OF YELMMERIDIAN HORIZONTAL DATUMVERTICAL DATUMDATUMDATUM21-006 LAC.dwgSTATE OFWASHINGTONLICENSEDLANDSCAPE ARCHITECTCHRISTIAN L. ALDRICHCERTIFICATE NO. 585EXPIRES ON 4-5-2022TAHOMA BLVD SESCALE: 1" = 20'102002040