Loading...
Sketch 1860595051ST ST NJEFFERSON AVE NEVAN TRUMP AVE NE'203''205''107'1ST ST NRAILWAY RD NERHOTON RD NW'509'RHOTON RD NW'705'511138455186059505101138788/108128709PROJECT PHASEPWRNOTIF#ORDER#SuperiorSub OrderN/AN/APSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGSAP W.O. #186059505FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.OH CIRCUIT MAP: D1702E116 SCALE 6" = 1 MILEARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.POWER GENERAL NOTES1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from thiswork sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three(3) working days in advance.3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing workto get the underground facilities located.4.All work is to be done in accordance with local municipal and county permit requirements as applicable.5.Inclement weather conditions may cause delays in construction times and dates.SCALE: 1:100SITE PLANDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPK. DIERICK253-294-589504/24/21J. REYNA253-259-707604/24/21N/AN/AN/AB. JOHNSONN/A04/24/21N/ACITY OF YELMENGR1 COMCAST TK#4635456REPLACE (2) DIST. POLES, GUYING UPGRADES202 FIRST ST N Yelm, WA 98597POTELCON/AN/AN/A186059505AS NOTED1/1THURSTONN/AN/AQSTHLET17, R02E, S19N/AN/AA1702E075D1702E116R1702E075YEL-26N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AVICINITY MAPJOB SITESITE SPECIFIC NOTESP01 (559393-147451)-REPLACE EXIST 40' POLE-INST NEW 45' CL1 POLE (6010.1000 PD451)-INST 3Ø SINGLE ARM (6033.1010 TAN313)-TRANSFER EXIST 25kVA 120/240v XF W/ LB C/O FUSED AT 10T (3412200)-TRANSFER EXIST OH SEC.-TRANSFER EXSIT S/L(SLAN0299)-TOP POLE TO COMMS.P02 (559473-147553)-INST NEW LARGE PLATE ANCHOR (6012.1000 ANDP24) L=23' EAST-TRANSFER BOTTOM TRANS. GUY TO NEW ANCHORP03 (559512-147560)-INST NEW LARGE PLATE ANCHOR (6012.1000 ANDP24) L=38' WEST-TRANSFER PRIMARY AND NEUTRAL DIST. DOWN GUYS TO NEW ANCHORP04 (559593-147566)-REPLACE EXIST 40' POLE-INST NEW 45' CL1 POLE (6010.1000 PD451)-INST 3Ø SINGLE ARM (6033.1010 TAN313)-TRANSFER (3) EXIST 15kVA 277/480v XFs W/ LB C/Os FUSED AT 6T(3412100)-TRANSFER EXIST OH SEC.-TOP POLE TO COMMS.THIS PAGE PERTAINS TO DISTRIBUTION UNDERBUILDSEE ADDITIONAL PRINT FOR TRANSMISSION NOTESSCALE: 1:100SITE PLANSCALE: 1:100SITE PLANJOB SITENew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary Voltage P01559393-147451 25kVANew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary Voltage P04559593-147566 15kVANew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary Voltage P04559593-147566 15kVANew pole at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER TRANSFERCompany ID#:Primary phase connected to:Tested Secondary Voltage P04559593-147566 15kVAPOLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P01559393-147451451P04559593-147566451 POLE RETIREMENT TABLE TEMP TRANSFERSST. LIGHT TRANSFERSSITE#POLE DATAPOLETELTVFIBERTRANRMVDID NUMBERGRID #HEIGHTCLASSYEARTOPPEDRMVDP01559393-14745140UNK1978SLAN299P04559593-14756640UNKUNKN/A