Loading...
2021.0117.CI0005 Permit Issued - 4.12.2021Civil Plan Review Date Issued: 03/23/2021 Permit #: 2021.0117.CI0005 Applied Date:03/23/2021 Issue Date:03/23/2021 Expiration Date 04/12/2022 Proposed Use:Maintenance improvements to the existing Yelm High School (YHS) baseball and softball field area. Improvements include replacing the existing grass fields with artificial turf fields. Physical Address:1315 YELM AVE W Require Sprinklers:No Parcel #:21724210500 Structures:Heating: Subdivision:Stories:Roofing: Zoning:Bedrooms:Bathrooms: Load:Construction Type: Use:Code Edition: Occupancy:Service Location:80-0034.0 Applicant Contractor YELM SCHOOL DISTRICT,SAME PO BOX 476 PO BOX 476 YELM, WA 98597 YELM, WA 98597 Contact:Contact: Phone:(360) 458-6128 Phone:(360) 458-6128 Fax:( ) -Fax:( ) - Email:CHRIS_HANSEN@YCS.WEDNET.EDU Bus Lic: Cont Lic: UBI: Fees Qty Rate Amount Date Fully Paid Invoice #Amount v Plan Review Fee 1.00 250.00 250.00 03/23/2021 2077 250.00 v 250.00 250.00 Estimated Balance Due: Initials ______Page 1 City of Yelm, Washington 106 2nd Street SE | Yelm, WA 98597 = (360) 458-3244 | www.yelmwa.gov 1. You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting if project requires a General Construction Stormwater Permit, provide the City with an updated Construction SWPPP with the CESCL and on- site contact information. 2. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. 3. A request from the engineer of record must be presented for any changes requested to the plans. =