Loading...
2020.0018 CPR Approval LTR 10.02.2020 January 30, 2023 Joe and Constance Standley Standley Garage 10627 11th Ave Ct SE Tacoma, Washington 98589 RE: Civil Engineering Approval – Standley Garage (Application # 2020.0185.CI0009) City of Yelm Project No. MU 2020.0018 (Previously 2017.0160) Location: Parcel # 64303601500 Dear Mr. Hansen: The City of Yelm has completed the final review of the YCS Bus Facility Expansion located on Parcel 64303601500. Your application included:  Civil Plans (6 pages dated September 11, 2020 stamped by James Edward Gibson , PE)  Landscape Plans (*)  Stormwater Site Plan (dated December 2019 - Rev June 2020)  Construction Stormwater Pollution Prevention Plan (dated June 2019)  Operations & Maintenance Manual (dated June 2019) We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed during the construction process. 1. You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting, provide the City with an updated Construction SWPPP with the CESCL and on-site contact information. 2. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. 3. A request from the engineer of record must be presented for any changes requested to the plans. 4. The engineering review invoice must be paid in full before the preconstruction meeting. 5. Prior to the installation of lights not shown on civil engineering plans, submit illumination plans that meets the requirements of the City of Yelm Municipal Code Section 18.59.050. At the time of project closeout the improvements will require final inspection / acceptance before a final Certificate of Occupancy can be issued by the Building Official. This final inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following documents will be uploaded as required through this form; (360) 458-3244 (360) 458-3144 FAX www.yelmwa.gov 1. As-Build Plans 2. Engineer Construction Report – Stormwater Facilities 3. Applicable O/M Manuals 4. Construction Inspection & Testing Logs 5. Special Test Results & Reports If you have any additional questions or comments please do not hesitate to call or contact me at derekm@yelmwa.gov or call me at (253) 278-2937. Respectfully City of Yelm Community Development Derek M. McCoy, PE Civil Review Engineer Cc: James Edward Gibson, PE – JE Gibson Engineering and Consulting. January 30, 2023 Page 2 of 2