2020.0106 CPR PermitCivil Plan Review Date Issued:
04/15/2020
Permit #:
2020.0106.CI0005
Permit is not valid until paid in full
Applied Date:04/15/2020 Issue Date:04/15/2020 Expiration Date
Proposed Use:Civil Plan Review on Wyndstone Apts.
Physical Address:15025 TAHOMA BLVD SE Require Sprinklers:No
Parcel #:21724420300 Structures:Heating:
Subdivision:Stories:Roofing:
Zoning:Moderate Density Residental Bedrooms:Bathrooms:
Load:Construction Type:
Use:Multi-family Code Edition:2015
Occupancy:Service Location:
Applicant Contractor
C & E DEVELOPMENT LLC,SAME
PO BOX 2983 PO BOX 2983
YELM, WA 98597-0 YELM, WA 98597-0
Contact:Contact:
Phone:(253) 278-0343 Phone:(253) 278-0343
Fax:( ) -Fax:( ) -
Email:Bus Lic:
Cont Lic:CEDEVED942JC
UBI:
Fees Qty Rate Amount Date Fully Paid Invoice #Amount
v Plan Review Fee 1.00 250.00 250.00 04/15/2020 992 250.00
v Staff Review Fee 8.00 54.00 432.00
682.00 250.00
Estimated Balance Due:432.00
Conditions
Set By:DerekM If C & E Development LLC aquires the
parcel to the south of this project site, a 96'
temporary cul-de-sac or hammerhead will
be required for turn-around provisions.Resolved Date:Resolved By:
Permit is not valid until paid in full
Initials ______Page 1
City of Yelm, Washington
106 2nd Street SE | Yelm, WA 98597
=
(360) 458-3244 | www.yelmwa.gov
1. You must schedule a preconstruction meeting with the City and its inspectors before your
construction begins. Prior to preconstruction meeting if project requires a General Construction
Stormwater Permit, provide the City with an updated Construction SWPPP with the CESCL and on-
site contact information.
2. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse
weather is incurred during construction additional erosion measure may be required.
3. A request from the engineer of record must be presented for any changes requested to the plans.
=