Loading...
2021.0295.BP0022 Walmart 3705 Remodel Fire Protection Drawing SetHYDROSTATIC TEST BUILDING SPRINKLER SYSTEM(S) INVOLVED IN THIS SCOPE OF WORK SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH NFPA 13. MOREOVER, THE FOLLOWING TWO (2) HYDROSTATIC TESTS SHALL BE PERFORMED BY THE CONTRACTOR: 1. THE FIRST HYDROSTATIC TEST SHALL BE PERFORMED BY THE CONTRACTOR PRIOR TO START OF SPRINKLER SYSTEM SCOPE OF WORK ( PRE -SCOPE HYDRO TEST " ); AND 2. THE SECOND HYDROSTATIC TEST SHALL BE PERFORMED BY THE CONTRACTOR AFTER COMPLETION OF CONTRACT SCOPE OF WORK ( POST -SCOPE HYDRO TEST " ). THE HYDROSTATIC TESTS ON EXISTING SPRINKLER SYSTEM SHALL BE CONDUCTED AT A PRESSURE OF 200 PSI FOR 2 HOURS. NEW SYSTEMS SHALL BE TESTED PER PRESSURE REQUIREMENTS OF NEPA 13. THE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR DAMAGE TO CONTENTS OR BUILDING OCCURRING DURING THE PRE -SCOPE HYDRO TEST " PROVIDED ALL COMMERCIALLY REASONABLE MEASURES NECESSARY OR PRUDENT TO PROTECT CONTENTS OR BUILDING COMPONENTS WERE FOLLOWED FOR APPROPRIATE TEST PROCESS. CONTRACTOR SHALL COMPLETE REPAIRS AND / OR REMEDIATION TO EXISTING SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES IDENTIFIED DURING PRE -SCOPE TESTING AS AN ADDITIONAL SERVICE. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR DAMAGE TO CONTENTS OR BUILDING OCCURRING DURING THE " POST -SCOPE HYDRO TEST " PROCEDURE ORIGINATING IN EXISTING OR NEW SYSTEM COMPONENTS. CONTRACTOR SHALL COMPLETE REPAIRS AND / OR REMEDIATION TO EXISTING SYSTEMS REQUIRED AS A RESULT OF DEFICIENCIES IDENTIFIED DURING POST -SCOPE TESTING AT NO ADDITIONAL COST TO WALMART. WHEN CONDUCTING HYDROSTATIC TESTING ON EXISTING SYSTEMS AS REQUIRED BY NEPA 13, CONTRACTOR SHALL TAKE SUCH ACTIONS AS MAY BE NECESSARY TO REDUCE POTENTIAL DAMAGE TO CONTENTS AND BUILDING DURING EXECUTION OF SCOPE OF WORK, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1. USE OF LOW CAPACITY PRESSURE PUMP TO INCREASE PRESSURE IN SYSTEM AT INCREMENTAL RATE TO LIMIT SURGES IN SYSTEM; AND 2. PROVISION OF WORK STAFF DEDICATED TO MONITORING THE IMPACTED SYSTEM AREA DURING PRESSURE APPLICATION AND DURING HYDROSTATIC TEST FOR SIGNS OF SYSTEM COMPROMISE (MINIMUM 1 PERSON / 20,000 SQ. FT. AREA) ; AND 3. MAINTAINING DEDICATED PERSON AT SYSTEM CONTROL VALVE IN CONSTANT COMMUNICATION WITH SYSTEM MONITORS TO SHUT OFF TEST PUMP AND DRAIN SYSTEM IN EVENT OF SYSTEM FAILURE OR LEAK; AND 4. PROVISION OF READY SUPPLIES PRIOR TO START OF TESTING TO FACILITATE DAMAGE MINIMIZATION IN EVENT OF SYSTEM FAILURE (TARPS / PLASTIC SHEETING, WET / DRY VACUUM ETC.); AND 5. COVERING HIGH VALUE EQUIPMENT PRIOR TO TESTING; AND 6. LIMITATION OF TESTING TO ONE SYSTEM AT A TIME; AND 7. TESTING OF SYSTEMS DURING OFF HOURS / OVERNIGHT. HANG 4 AND 6 INCH PIPE WITHIN 3 INCHES OF PANEL POINT PIPE 3 INCH AND SMALLER NOT REQUIRED TO BE WITHIN 3 INCHES OF PANEL POINT OWNER FURNISHED SPRINKLERS AND ACCESSORIES 'MBOL SIZE K -FACTOR FINISH MFR MAKE S.I.N. TEMP STYLE QTY SPARE ESCH ESCH ESCH QTY STYLE FINISH QTY ® 3/4" 16.8 BRASS TYCO K17-231 TY7158 155 UPRIGHT 234 6 --- --- SUBSTITUTIONS WILL NOT BE PERMITTED. REFERENCE SPECIFICATIONS APPENDIX B FOR ADDITIONAL INFORMATION. * INTERMEDIATE TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION BELOW SKYLIGHTS. **HIGH TEMPERATURE SPRINKLERS TO BE FURNISHED BY OWNER FOR INSTALLATION AROUND UNIT HEATERS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE TO OWNER FURNISHED SPRINKLERS DURING INSTALLATION. TO REPLACE DAMAGED SPRINKLERS CONTACT HAINES, JONES, CADBURY 1-800-459-7099. THE OWNER WILL FURNISH ADDITIONAL (OWNER -FURNISHED) SPRINKLERS FOR THE SPARES CABINET. INSTALL SPARE SPRINKLER QUANTITY INDICATED ON CONTRACT DOCUMENTS PRIOR TO FIRE PROTECTION CONSULTANT SITE OBSERVATION. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY AND COMPARE THE QUANTITY AND SIZE OF EXISTING SPRINKLER OUTLETS WITH THE PROPOSED NEW SPRINKLERS PRIOR TO ORDERING OWNER FURNISHED SPRINKLERS. ADDITIONAL SPRINKLERS AND FITTINGS MAY BE REQUIRED AT NO ADDITIONAL COST TO THE OWNER. FOR 6 AND 8 INCH PIPE, USE THRU BOLT CONNECTION zz-WHERE POSSIBLE. USE TRAPEZE HANGER WHERE JOIST PANEL POINTS TYP z JOIST WEB CONFLICTS WITH THRU BOLT 6" \ MAX /-DECK TYP ® \- TOP BEAM CLAMP TYP 6 INCH AND SMALLER PIPE ® TO HORD OF J T TY MAINTAIN VISIBLE CLEARANCE BETWEEN PIPE AND JOIST MEMBERS TYP 4, 6 AND 8 INCH PIPE 8 INCH PIPE MAXIMUM HANGER SPACING FOR PIPING PERPENDICULAR TO JOISTS CLAMP THRU-BOLT BEAM CLAMP NOT TRA NOT TRAPEZED TRAPEZED 4" PIPE EVERY 12'-0" 4" PIPE EVERY 12'- 4" PIPE EVERY OTHER JOIST EVERY OTHER J TLNOT NECESSA 6" PIPE EVERY 6'-0" 6" PIPE EV 12'-0" 6" P EVERY JOIST EVERY HER JOISTNOT CESSARY 8" PIPE 8" PE EVERY 6'-0" PE EVERY 6'-0" NOT ALLOWED EVERY JOIST EVERY JOIST PIPE RUNNING PERPENDICULAR TO JOISTS 1 /4"x2"x2" SQUARE WASHER & HEX NUT 1/2" ALL THREAD ROD FENDER WASHER & HEX NUT 3.5" X 2.5" X .25" ANGLE TRAPEZE REQ'D FOR 6" MAINS 4" X 4" X .25" ANGLE TRAPEZE REQ'D FOR 8" MAINS MAX 1 I TOP CHORD OF JOIST TYP ONE OPEN JOIST BAY MINIMUM BETWEEN TRAPEZE HANGERS 12"DO NOT HANG 2 OR MORE 12" MIN MAINS 4" OR LARGER BETWEEN MIN THE SAME JOIST SPACE MAXIMUM HANGER SPACING FOR PIPES PARALLEL TO JOISTS 4" PIPE EVERY 12'-0" 6" PIPE EVERY 12'-0" 8" PIPE EVERY 12'-0" NOT TRAPEZED TRAPEZED TRAPEZED BEAM CLAMP THRU BOLT THRU BOLT PIPE RUNNING PARALLEL TO JOIST 'ONTRACTOR MAY SUBSTITUTE ANGLE IRON TRAPEZE MEMBER WITH PIPE MEMBER. SIZE PIPE MEMBER IN 4CCORDANCE WITH NFPA-13 AND MAINTAIN 12 INCH � AXIMUM DEFLECTOR DISTANCE JTILIZE THESE HANGING METHODS FOR ALL SPRINKLE[ 'IPING. SPACE TRAPEZE HANGERS IN ACCORDANCE NITH SCHEDULE. LOCATE HANGERS WITHIN 3 INCHES DF JOIST PANEL POINTS U.N.O. NOTE: DO NOT SUPPORT SPRINKLER PIPING FROM BOTTOM CHORD OF BAR JOISTS n PIPE SUPPORT 2 NTS 10.30.07 F02-1 SHEET INDEX SYMBOL LEGEND SHEET NUMBER SHEET NAME SYMBOL DESCRIPTION FP1 FIRE SPRINKLER SITE PLAN -X -X- DEMO PIPING FP2 FIRE SPRINKLER REMODEL PIPING PLAN - - - - EXISTING BRANCH LINE TO REMAIN AUTOMATIC FIRE SPRINKLER LEGEND NOTE: NO 0 -RING SPRINKLERS ARE TO BE USED ON THIS PROJECT - - - - EXISTING MAIN LINE TO REMAIN BRANCH LINE TO BE INSTALLED SYMBOL MFR MODEL S.I.N. STYLE FINISH ESC TEMP K -FAC TOTAL O DEMO SPRINKLERS Z EXISTING ROOF LEVEL SPRINKLERS 0 EXISTING PENDENT SPRINKLERS U z TYCO DSC TY5255 SSP CHROME FLUSH 200° 11.2 12 ❑ EXISTING DRY PENDENT SPRINKLERS * MATCH EXISTING WITH TYCO HEADS, IF DIFFERING. WHERE SPRINKLERS ARE CALLED OUT TO "MATCH EXISTING," THE CONTRACTOR SHALL PROVIDE SPRINKLERS MANUFACTURED BY TYCO WHICH ARE EQUIVALENT TO THE EXISTING TO REMAIN SPRINKLERS. SUBSTITUTIONS WILL NOT BE PERMITTED. FP2 1" OUTLET WITH ARM -OVER TO NEW PENDENT SPRINKLER o NEW DRILLED 1" MECHANICAL TEE WITH ARM -OVER TO NEW PENDENT SPRINKLER � PLUG EXISTING OUTLET OPTION "A" INSTALLATION PROCEDURE 1. CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED CEILING PANEL. LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS. 2. INSTALL TYCO DRY PENDENT SPRINKLER PER MANUFACTURERS INSTALLATION REQUIREMENTS. 3. COMPLETELY FILL ANNULAR CEILING OPENING BETWEEN THE ESCUTCHEON AND TOP OF CEILING PANEL WITH OPEN -CELL POLYETHYLENE FOAM BACKER ROD. EXPANDED FOAM IS NOT PERMITTED. 4. INJECT DOW CORNING 739 PLASTIC ADHESIVE SEALANT INTO AND AROUND THE TOP OF THE FREEZER/COOLER CEILING CORE OPENING IN ACCORDANCE WITH SEALANT MANUFACTURERS INSTRUCTIONS OPEN -CELL POLYETHYLENE FOAM BACKER ROD SPRINKLER CUP SUPPLY FROM WET PIPE SPRINKLER SYSTEM TEE WITH PLUG 1 " DRY SPRINKLER DROP DOW CORNING 739 PLASTIC ADHESIVE FREEZER/COOLER CEILING TYCO MODEL TY5255 FLUSH 2007 DRY PENDENT SPRINKLER (NO SUBSTITUTIONS) OPTION "B" INSTALLATION PROCEDURE 1. CORE DRILL 2 1/2" DIAMETER HOLE IN THE FREEZER/COOLER INSULATED CEILING PANEL LOCATE HOLE AND REQUIRED SPRINKLER PROTECTION IN ACCORDANCE WITH NFPA 13 OBSTRUCTION CRITERIA (SSP TYPE SPRINKLERS). MAINTAIN 6" CLEARANCE FROM COOLER SEAMS. 2. INSTALL TYCO DRY PENDENT SPRINKLER PER MANUFACTURERS INSTALLATION REQUIREMENTS. INSERT BOOT PRIOR TO MAKE-UP WITH PIPING. 3. COMPLETELY SEAL INTERFACE BETWEEN BOOT FLANGE AND TOP OF FREEZER/COOLER PANEL WITH ADHESIVE PROVIDED WITH BOOT IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS. 4. APPLY STRAP TIES ON BOOT AROUND DRY SPRINKLER BARREL PER MANUFACTURERS INSTRUCTIONS. 1" DRY SPRINKLER DROP FREEZER/COOLER CEILING SPRINKLER CUP SUPPLY FROM WET PIPE SPRINKLER SYSTEM TEE WITH PLUG 2 NYLON STRAP TIES (INSTALL OPPOSITE DIRECTIONS) TYCO RUBBER SEAL co BOOT MODEL DSB-1 z SEALANT PER BOOT MANUFACTURER TYCO MODEL TY5255 FLUSH 2007 DRY PENDENT SPRINKLER (NO SUBSTITUTIONS) NOTE: CONTRACTOR TO SEAL DRY PENDENT SPRINKLERS AT FREEZER/COOLER USING ONE OF THE OPTIONS ABOVE. NO OTHER SEALANTS ARE PERMITTED. FREEZER/COOLER I I I DRY PENDENT SPRINKLER NTS S/R HYDRANT EXISTING 10" FLOW HYDRANT LEAD-IN 1EST --------------------- - 0 ------ ------ EXISTING 10" MAIN r I I I SITE � I I I � •� �. I I 10 I 100' 200' O O 0 � In�I N a O v �J Z o o -- U z Q w � w LE 0 3 X � w FP2 o � N I I Ww w I I I I I I m I I I I I I I I I I ----------- ------------------------------------ EXISTING 10" MAIN FIRE SERVICE SITE PLAN SCALE: 1 " = 100' 0 50' 100' 200' O O r c� z w J 0 z U) Q U w SCOPE OF WORK 1. CONTRACTOR TO FIELD VERIFY EXTENT OF WORK. 2. THE EXISTING FIRE SPRINKLER SYSTEMS WILL BE MODIFIED AS INDICATED ON THE PROJECT CONTRACT DOCUMENTS. THE SCOPE OF WORK MAY INCLUDE THE MODIFICATION OF EXISTING BRANCHLINES, INSTALLATION OF NEW BRANCHLINES, MODIFICATION OF EXISTING RISER(S), THE REMOVAL AND INSTALLATION OF NEW SPRINKLERS, MODIFICATION OF EXISTING MAINS, INSTALLATION OF NEW MAINS, REPLACEMENT OF THE EXISTING BACKFLOW PREVENTOR. 3. ALL NEW PIPING SHALL HAVE HANGERS INSTALLED IN ACCORDANCE TO THE DETAILS LOCATED ON THE FIRE PROTECTION DETAILS SHEET. 4. ALL 1 -INCH ARMOVERS (IF APPLICABLE) SHALL HAVE A HANGER SECURED TO THE STRUCTURAL STEEL ONLY, NOT TO THE DECK WHEN THE LENGTH EXCEEDS 2'-0" WHERE STATIC PRESSURES ARE UP TO 100 PSI AND 1'-0" WHERE STATIC PRESSURES EXCEEDS 100 PSI. 5. WHEN REQUIRED, EARTHQUAKE BRACING SHALL BE INSTALLED. REFERENCE EARTHQUAKE BRACING NOTES AND DETAILS LOCATED ON THE FIRE PROTECTION DETAILS SHEET. 6. CEILING GRID SHALL BE PERMITTED TO BE REMOVED IN AREAS WHERE REQUIRED IN ORDER TO COMPLETE THE WORK NEEDED SUCH AS DEMO AND INSTALLATION OF NEW MAINS OR LONG DROPS. IN THIS CASE THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING DAMAGED CEILING TILE OR GRID DURING THE INSTALLATION. ALL REMOVED CEILING TILES MUST BE REPLACED AT THE END OF BUSINESS DAY. AREAS LEFT EXPOSED SUCH AS BUT NOT LIMITED TO REMOVED CEILING GRID AND CEILING TILES SHALL NOT BE PERMITTED. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PURCHASING AND INSTALLING MATCHING CEILING TILES TO REPLACE ANY CEILING TILES THAT HAVE EMPTY HOLES DUE TO SPRINKLER REPLACEMENT. 8. USE EACH EXISTING OUTLETS FOR ONE NEW ARM OVER TO NEW SPRINKLER LOCATION UNLESS HYDRAULICALLY CALCULATED. CONTRACTOR SHALL INSTALL 1" INCH MECHANICAL TEES IF ADDITIONAL OUTLETS ARE REQUIRED. AFTER THE DEMOLITION IS COMPLETE, THE NEW SPRINKLER SYSTEM SHALL MEET ALL REQUIREMENTS OF NFPA 13. 9. CONTRACTOR SHALL PROVIDE NEW SPRINKLERS AS NECESSARY DUE TO PAINT, DAMAGE, ETC.. CONTRACTOR SHALL COORDINATE. 10. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE FIRE LANES DURING THE SPRINKLER SYSTEM UPGRADE PROCESS. THE CONTRACTOR SHALL COORDINATE WITH THE STORE MANAGER A STAGING AREA FOR MATERIALS AND TOOLS TO BE USED FOR PROJECT PRIOR TO START OF WORK. 11. THE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING THE SHOP DRAWINGS, HYDRAULIC CALCULATIONS AND APPROVAL (BY THE ENGINEER OF RECORD AND AHJ) AS WELL AS INSTALLATION. 12. THE SPRINKLER CONTRACTOR MUST FIRST SUBMIT DOCUMENTS, AS OUTLINED IN THE PROJECT SPECIFICATIONS, TO THE FIRE PROTECTION ENGINEER OF RECORD FOR APPROVAL. AFTER THE APPROVAL IS GIVEN, THE CONTRACTOR MUST SUBMIT TO THE AUTHORITY HAVING JURISDICTION FOR INSTALLATION PERMIT. 13. THE CONTRACTOR SHALL COORDINATE WITH THE STORE MANAGER ON THE AREA TO BE WORKED ON AT LEAST 24 HOURS IN ADVANCE. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ANY CONTENT OR BUILDING COMPONENTS DUE TO CONTRACTOR NEGLIGENCE IN EXECUTION OF THE SCOPE OF WORK SHOWN IN CONTRACT DOCUMENTS. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO REDUCE POTENTIAL DAMAGE TO CONTENTS AND BUILDING DURING EXECUTION OF SCOPE OF WORK. WHERE POTENTIAL FOR DAMAGE TO CONTENTS OR BUILDING COMPONENTS IS CONSIDERED LIKELY DUE TO EXISTING SYSTEM CONDITION OR CONFIGURATIONS, CONTRACTOR SHALL DOCUMENT AND REVIEW CONCERNS WITH WALMART CONSTRUCTION MANAGER PRIOR TO INITIATING AFFECTED WORK. 15. THE CONTRACTOR SHALL REPAIR ANY LEAKS OR REPLACE ANY LEAKING COMPONENTS AFFECTED BY THIS SCOPE OF WORK AT NO ADDITIONAL COST TO THE OWNER. GENERAL UNDERGROUND NOTES 1. ALL UNDERGROUND IS SHOWN FOR HYDRAULIC REFERENCE ONLY. 2. SEE CIVIL DRAWINGS FOR EXACT LOCATIONS IF AVAILABLE. 3. NO NEW WORK UNLESS OTHERWISE NOTED. WATER SUPPLY INFORMATION STATIC: 56 PSI RESIDUAL: 50 PSI AT 1060 GPM INFORMATION DERIVED FROM WATER REPORT SUPPLIED BY: CITY OF YELM 5/25/21 EFFECTIVE POINT OF WATER SUPPLY INFORMATION IS: 10" LEAD IN TIE-IN POINT DATE OF TEST: 5/25/21 FLOW TEST ELEVATION: LEVEL BUILDING PAD ELEVATION: LEVEL WATER SUPPLY INFORMATION IS FURTHER REDUCED PER THE FOLLOWING: * 5 PSI SAFETY FACTOR FOR WAL-MART STANDARDS WATER SUPPLY TO BE USED FOR FIRE SPRINKLER DESIGN AT EFFECTIVE POINT: STATIC: 51 PSI RESIDUAL: 45 PSI AT 1060 GPM GENERAL NOTES 1. THE DESIGN SHOWN ON THESE CONTRACT DOCUMENTS IS TO PROVIDE GUIDANCE FOR BIDDING AND TO OBTAIN APPROVAL OF THE AUTHORITY HAVING JURISDICTION. SUBMIT COMPLETE FIRE SPRINKLER SHOP DRAWINGS AS REQUIRED BY CONTRACT DOCUMENTS TO THE OWNERS DESIGNATED REVIEWER. BASE DESIGN UPON THESE DRAWINGS AND AS REQUIRED BY THE SPECIFICATIONS. SHOP DRAWINGS SHALL INCLUDE ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATIONS METHODS, MATERIAL DATA, AND ADDITIONAL INFORMATION NECESSARY TO CLARIFY THE INTENT OF INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZE, SPRINKLER SPACING, AND SYSTEM CONFIGURATION AS SHOWN. ALTERNATES MUST BE APPROVED IN WRITING BY FIRE PROTECTION ENGINEER OF RECORD DOCUMENTS PRIOR TO BID. 2. COORDINATE LOCATIONS OF FIRE PROTECTION COMPONENTS, INCLUDING PIPING, ALARMS, DRAINS, TEST POINTS, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS. OBSTRUCTION TO SPRINKLER DISCHARGE MUST BE CONSIDERED DURING SHOP DRAWING PRODUCTION AND INSTALLATION; ADDITIONAL SPRINKLERS MAY BE REQUIRED AT NO ADDITIONAL COST TO OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 3. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. 4. SUBMIT A REQUEST FOR INFORMATION FOR QUESTIONS REGARDING THE FIRE PROTECTION DOCUMENTS. 5. NEUTRALIZATION WALLS, IF PROVIDED, ARE SHOWN ON THE ARCHITECTURAL DRAWINGS. REFER TO MECHANICAL DRAWINGS FOR NEUTRALIZATION WALL PENETRATION DETAIL. 6. PENETRATIONS OF "RATED ASSEMBLIES" SHALL BE FIRE STOPPED WITH AN APPROVED MATERIAL PER METHODS REQUIRED BY THE AUTHORITY HAVING JURISDICTION. FIRE SPRINKLER PIPING DEMOLITION NOTES 1. CONTRACTOR MUST VISIT THE BUILDING SITE TO DETERMINE THE FULL EXTENT OF THE EXISTING FIRE PROTECTION WORK AND EXISTING CONDITIONS, BECOME TOTALLY FAMILIAR WITH THE DISCONNECTIONS, REMOVALS, RELOCATIONS AND/OR RECONNECTIONS OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, AND CONDITIONS IN THE PROPOSAL FOR THIS PROJECT. NO EXTRA COMPENSATION WILL BE PAID FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, AND/OR ALLOWANCE. 2. UNLESS INDICATED OTHERWISE, DISCONNECT AND REMOVE ALL EXISTING FIRE PROTECTION COMPONENTS NOT INTENDED TO BE REUSED. 3. DISCONNECT, RELOCATE, AND RECONNECT EXISTING FIRE PROTECTION SYSTEMS AND EQUIPMENT WHERE REQUIRED. 4. NOTE CAREFULLY THAT THE FIRE PROTECTION DRAWINGS ARE INTENDED TO INDICATE, ONLY DIAGRAMMATICALLY, THE EXTENT AND THE GENERAL CHARACTER AND LOCATIONS OF THE WORK INCLUDED. PROVIDE ALL WORK OBVIOUSLY INTENDED, BUT HAVING MINOR DETAILS OMITTED OR NOT SHOWN. COMPLETE AS REQUIRED TO PERFORM THE FUNCTIONS INTENDED. FOLLOW THE CONTRACT DOCUMENTS FOR BUILDING DETAILS AND FIT THE WORK OF THE FIRE PROTECTION DRAWINGS AND SPECIFICATIONS THERETO. 5. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO AN APPROVED DUMPING SITE AND CLEAN ALL FIRE PROTECTION WORK PRIOR THE PROJECT COMPLETION. 6. PERFORM ALL WORK ACCORDING TO THE PROJECT PHASING SCHEDULE INFORMATION FOR THIS PROJECT. PROVIDE ALL NECESSARY FIRE PROTECTION WORK, TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER MEANS NECESSARY, TO CONFORM TO THE REQUIRED CONSTRUCTION PHASING OF THE PROJECT. 7. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION. 8. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ADJACENT SURFACES LEFT UNUSED AFTER EXISTING SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND VACATED FROM THESE HOLES. 9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE PROJECT. 10. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE. 11. ALL WORK SHALL BE PERFORMED DURING OFF HOURS SO AS TO NOT INTERRUPT SERVICE. THE CONTRACTOR SHALL PROPERLY NOTIFY THE LANDLORD. THE LESSOR AND THE ADJACENT TENANTS A MINIMUM OF 48 HOURS IN ADVANCE BEFORE PROCEEDING WITH THIS WORK. ALL WORK SHALL BE SCHEDULED IN ADVANCE. EXISTING FIRE PUMP ELECTRIC FIRE PUMP RATED 80 PSI @ 1250 GPM SEISMIC REQUIREMENTS GENERAL NOTES CONT. 7. THE FIRE PROTECTION ENGINEER OF RECORD SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR SHALL THEY BE REQUIRED TO SUPERVISE THE CONDUCT OF THE WORK, THE CONSTRUCTION PROCEDURES FOLLOWED BY THE CONTRACTOR, SUBCONTRACTORS, THEIR RESPECTIVE EMPLOYEES OR ANY OTHER PERSON AT THE JOB SITE OTHER THAN THAT OF THE ENGINEERING FIRM'S EMPLOYEES. 8. CONTRACTOR MUST REVIEW ALL CONSTRUCTION DOCUMENTS PRIOR TO BID. SHOULD MODIFICATIONS TO THESE PLANS BECOME NECESSARY TO PROPERLY COORDINATE THE SYSTEM WITH ALL OTHER TRADES, IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL OF THE CHANGES FROM BOTH THE AUTHORITY HAVING JURISDICTION AND THE OWNER'S DESIGNATED REVIEW CONSULTANT IN ADDITION TO OBTAINING THE NECESSARY APPROVALS, THE CONTRACTOR MUST MAKE NOTE OF ANY FIELD OR COORDINATION CHANGES ON THE INSTALLATION DRAWINGS, AND THEN MUST PROVIDE A SET OF AS -BUILT DRAWINGS ONCE COMPLETE. 9. CONTRACTOR MUST VERIFY ALL DROP DOWN LOCATIONS AT EXTERIOR WALLS WITH THE PROJECT MANAGER PRIOR TO INSTALLATION. 10. ALL PIPING MUST BE COORDINATED AROUND FRAMING MEMBERS AND PROPERLY INSTALLED INSIDE THE BAR JOIST. 11. CONTRACTOR SHALL ROUTE PIPING AROUND ALL OBSTRUCTIONS AND PROVIDE SPRINKLER PROTECTION UNDER OBSTRUCTIONS, AS DETAILED IN NFPA 13 STANDARDS AS PART OF THE FIELD COORDINATION AT NO ADDITIONAL COST TO OWNER. 12. ALL SPRINKLER DEFLECTOR DISTANCE REQUIREMENTS SHALL BE IN ACCORDANCE TO THE STANDARDS OUTLINED IN NFPA 13. 13. ALL PIPING PASSING THROUGH CMU WALLS SHALL BE INSTALLED WITH ONE INCH CLEARANCE ON ALL SIDES. (CORE DIAMETER EQUAL TO PIPE +2"). ALL CORES SHALL BE COORDINATED WITH STRUCTURAL REINFORCING. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CORING WITH PROPER CLEARANCE AT ALL CMU WALLS. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A TWO INCH CLEARANCE AROUND ALL PIPING PASSING THROUGH CONCRETE SLABS. THE SPRINKLER CONTRACTOR SHALL FILL ALL CLEARANCES WITH APPROVED MASTIC. 14. PENETRATIONS OF ASSEMBLIES SHALL BE FIRE STOPPED WITH APPROVED MATERIALS PER METHODS DESCRIBED BY THE UL FIRE RESISTANCE DIRECTORY. 15. PROVIDE FLUSHING CONNECTIONS IN ACCORDANCE WITH THE STANDARDS OUTLINED IN NFPA 13. 16. PROVIDE ALL NECESSARY OFFSETS, RISES OR DROPS IN PIPING AND AUXILIARY DRAINS REQUIRED BY BUILDING CONDITIONS. 17. EXAMINE THE JOB CONDITIONS AND VERIFY ALL MEASUREMENTS, DISTANCES, ELEVATIONS, CLEARANCES, ETC. 18. ARCHITECTURAL AND ELECTRICAL BACKGROUND INFORMATION IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO THE CONTRACT DOCUMENTS FOR LOCATIONS, SIZES AND QUANTITIES OF OTHER TRADE WORK. 19. SPRINKLER SPACING TO BE PER NFPA 13. 20. INTERFACE SPRINKLER SYSTEM WITH FIRE PROTECTION SUPERVISORY SYSTEM. 21. ALL MATERIALS SHALL BE UL LISTED AND FM APPROVED. SPRINKLERS SHALL BE TYCO HEADS. SPRINKLER PIPE SHALL BE MANUFACTURED TO STANDARDS RECOGNIZED BY NFPA 13., THREADED PIPE SHALL HAVE A CORROSION RESISTANCE RATING OF 1.0 OR GREATER. CRIMP -TYPE COUPLINGS SHALL NOT BE USED. THREADABLE THINWALL PIPE WITH CORROSION RESISTANCE RATING OF LESS THAN 1.0 SHALL BE USED ONLY WITH ROLL GROOVE FITTINGS. 22. IF REQUIRED, PROVIDE 24 VOLT AC, ELECTRIC BELL, MODEL NO. PBA248, ELECTRIC BELL BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI, LOCATE AS REQUIRED BY AUTHORITIES HAVING JURISDICTION. PROVIDE NEW DOUBLE POLE VANE TYPE FLOW DETECTOR, MODEL NO. VSR-F, BY POTTER ELECTRIC SIGNAL OF ST. LOUIS, MISSOURI. SET ADJUSTABLE DELAYED SIGNAL AT 30 SECONDS. MOUNT WATER FLOW INDICATORS NO HIGHER THAN 6 FEET ABOVE FINISH FLOOR. 23. ALL SPRINKLER SYSTEMS TO BE MODIFIED SHALL BE HYDROSTATICALLY TESTED PER NFPA 13 PRIOR TO SPRINKLER SYSTEM MODIFICATION AND SHALL BE RE -HYDROSTATICALLY TESTED AFTER COMPLETION OF WORK. 24. DO NOT HANG OR SUPPORT ANY LOADS OR MAKE ANY ATTACHMENTS TO THE METAL ROOF DECK OR JOIST BRIDGING. 25. SAMMY SCREWS ARE NOT PERMITTED. 26. CEILING FLANGES ARE NOT PERMITTED. 27. PROVIDE RETAINING STRAPS ON HANGERS WHERE REQUIRED. 28. CONTRACTOR IS TO COORDINATE FINAL SPRINKLER HEAD LOCATIONS AND PIPE ROUTING SUCH THAT THEY DO NOT INTERFERE WITH NOR RECEIVE DAMAGE FROM THE NORMAL OPERATIONS OF THE AREA. 29. WHERE THE DESIGN IS SHOWN TO REPLACE SPRINKLERS, IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY THE SIZE OF THE EXISTING SPRINKLER FITTING PRIOR TO BID. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE THE NECESSARY FITTINGS) WHEN THE NEW SPRINKLER DIFFERS FROM THE EXISTING SPRINKLER CURRENTLY INSTALLED. APPLICABLE CODES THE SPRINKLER CONTRACTOR SHALL COMPLY WITH NFPA STANDARD: EDITION: ALL REQUIREMENTS PER NFPA 13 "PROTECTION NFPA 13 2016 OF PIPING AGAINST DAMAGE WHERE SUBJECT TO EARTHQUAKES". THE SPRINKLER CONTRACTOR UL GUIDELINE: MUST ALSO TAKE INTO ACCOUNT THE LIMITATIONS UL LLC TECHNICAL REPORT PROJECT 4788122552 OF THE STRUCTURAL ELEMENTS PRIOR TO SIZING, FASTENING AND/OR LOCATING SEISMIC UL LLC TECHNICAL REPORT PROJECT 4789705078 ASSEMBLIES, RESTRAINTS, ETC. ON THEIR PLANS. STRUCTURAL REQUIREMENTS AND LIMITATIONS FIRE CODE: MAY BE MORE STRINGENT THAN NFPA. 2018 INTERNATIONAL FIRE CODE W/ WASHINGTON STATE CODE COUNSEL AMENDMENTS BUILDING CODE: 2018 INTERNATIONAL BUILDING CODE W/ WASHINGTON STATE CODE COUNSEL AMENDMENTS STORE LOCATION: 17100 WA -507 SE, YELM, WA 98597 fu0 W o cnzoz WwW w FEQzz-"' u Z IK w W WW QUU w W Q = O W O O o w a- �zQ< I� Q00U W W �a o a� JN0<oW =a} > �Q <E:o a�o�E�=� o\��zz�-o 0 z wUzo�o-aWTzoz zln= ;OL<z=01 Q < <R' moo UzW --- Q Q W z J w_" 1 O N 3i w C zo >o UPJ -u` 0 �Q oo W mW=a �oWo fEW�zMao~Qaw�LJLW ~ =(nW OQ 5ILL�X W Uw W <_ � ���Uov��oWz��zQ� 3L: I' -E"I'EC B`': L 1, N L J 00 Z FRCTC CYCLE: w O O 0 N v �J Z o o u� Q w w LE 0 0 w � w o � N Ww w m 3L: I' -E"I'EC B`': L 1, N L PLS lo: 1 ; FRCTC CYCLE: 03/26/2021 DOCUMENT DATE: 05/03/2021 SIAIL OF WASHINGION FIRE SPRINKLER CERTIFICATE OF COMPETENCY FSCC-24676 EXPIRES 12-31-2021 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR C ONSTRUC TION FIRE SPRINKLER SITE PLAN s-�EET: FP1 INSTALL NEW LINES OFF MAIN WITH MECHANICAL TEES & RUN PIPING APPROXIMATELY 12" ABOVE COOLERS, TYPICAL ■o\ ■ Oil � ■o L�l �o MIMI W"�wI� I� I I � I� I 65 62 30 59 56 47 53 ! 31 � 50 � 29 � toco) 4 �� 4 4 4 4 4 4 4INEEMENEEMENEVE 7-22 3-02 6-0 -22 �92 5-82 3-326-62 :2-51 no L 52 61 o49 48 �4 6458 55 CD oooto67 0� o� / o0 F66 II PICKUP COOLER 63 60 :o •o •o O U L--1 N• U �' + I U N ■ ■ ■L-0 Cfl PICKUP FREEZER ( 57 54 44 lmimimimimimimimimimimimimi REMOTE AREA #2 HYDRAULIC DESIGN SYSTEM #1: AREA #2 PICKUP COOLERS SPRINKLERS CALCULATED: 12 SPRINKLERS SPRINKLERS CALCULATED: E: SPRINKLERS SPRINKLER DENSITY REQ'D: 0.4 GPM/SQ. FT. FASTENER 11 12 PSI AREA OF DISCHARGE: 2000 SQ. FT. HOSE ALLOWANCE 500 GPM SPRINKLER SYSTEM DEMAND ® 20: 801 GPM DEMAND PRESSURE ® 20: g4 PSI CALC FILE:7711 YELM 3705 AREA... PIPE 9'0" MAX I YELM 3705 AREA... NEW PICKUP COOLER FIRE SPRINKLER PLAN SCALE: 3/32" = 1'10' 2( 0 5 TYPICAL BRACE SYSTEM #1: ARRANGEMENT SPRINKLERS CALCULATED: 12 SPRINKLERS SPRINKLERS CALCULATED: E: SPRINKLERS MINIMUM PRESSURE: HANGER-�� FASTENER 11 12 PSI 1" SCH-40 PIPE 12 SPRINKLERS 11 7'0" MAX LENGTH 250 GPM (2,500 LBS) 540 GPM OR 34 PSI 1 1/4" SCH-40 FAST CLAMP - PIPE 9'0" MAX I YELM 3705 AREA... LENGTH (3,385 LBS) TYPICAL BRACE FITTINGS SWIVEL SWIVEL SWIVEL� o o BRACE BRACE BRACE PIPE PIPE PLp§vIVEL (TYPICAL) ° FAST CLAMP FAST CLAMP (TYPICAL) ° PIPE CLAMP LATERAL BRACE LONGITUDINAL BRACE FOUR WAY BRACE FASTENER DETAILS FENDER WASHER TOP OF JOIST SWIVEL 1/2" EXPANSION tr . 1/2" BOLT SHIELD OR 1/2"°ae SWIVEL QUICK BOLT (2) ° BRACE ° REQUIRED 8 °/ PIPE °: < .° BRACE PIPE (A) STEEL BAR JOIST (B) CMU WALL 1/2" THRU BOLT 1/2" EXPANSION SHIELD / QUICK BOLT (2050 LBS.) (1782 LBS.) FASTENER (B) ONLY ALLOWED ON FOUR WAY BRACE WHERE LOAD IS DISTRIBUTED ACROSS TWO CMU ATTACHMENTS NOTE: RETAINING STRAP REQUIRED FOR BEAM CLAMPS SEISMIC BRACING NTS 10.30.07 F02-2 OHM _ DEMOLISH ALL EXISTING OVERHEAD 8.OK SPRINKLER HEADS IN GM STOCK NOTE: PICKUP COOLERS/FREEZERS EXTRA HAZARD GROUP 1 - 0.40 GPM/FT2 INSTALL NEW SPRINKLERS AS SHOWN IN THE NEW COOLER/FREEZER PER NFPA 13, 2016 EDITION, AND STATE AND LOCAL ORDINANCES. CONTRACTOR TO INSTALL MECHANICAL TEE FOR EACH NEW OUTLET REQUIRED. CONTRACTOR TO COORDINATE SPRINKLER HEAD LOCATIONS WITH ALL ARCHITECTURAL, ELECTRICAL, AND MECHANICAL FEATURES. CONTRACTOR TO ADD HEADS AS NECESSARY TO MAINTAIN COVERAGE PER NFPA 13. REF 2/FP1 FOR HANGER DETAIL REF 3/FP1 FOR DRY PENDENT SPRINKLER DETAILS NFPA 13 - WHERE THE TOTAL DESIGN DISCHARGE FROM THESE OPERATING SPRINKLERS IS LESS THAN THE MINIMUM REQUIRED DISCHARGE DETERMINED BY MULTIPLYING THE REQUIRED DESIGN DENSITY TIMES THE REQUIRED MINIMUM DESIGN AREA, AN ADDITIONAL FLOW SHALL BE ADDED AT THE POINT OF CONNECTION OF THE BRANCHLINE TO THE CROSS MAIN FURTHEST FROM THE SOURCE TO INCREASE THE OVERALL DEMAND, NOT INCLUDING THE HOSE ALLOWANCE, TO THE MINIMUM REQUIRED DISCHARGE AS DETERMINED ABOVE EXISTING ELECTRIC FIRE PUMP, 80 PSI Q 1250 GPM 19 20 a ob 70 8 F-1 2-514 8 E4-0 ] 8 15-10 8 1 0+ u ^ 5-3j� 2-81-1014 1 PO PI oo a0 0o ao EXISTING 2-9 sa O WILKINS 350A `1-5%+-711 BACKFLOW O O 1 1 1 1 _ ----------- EB r I Q 6 INSTALL NEW 16.8K SPRINKLER HEADS THROUGHOUT GM STOCK ?_ 4 92-1014 ,� X11 IM 28-814 090 3 N 3� -------- t____Mo NII NII NII NII NII NII NII NII N 10-10 11-0 10-9 11-1 4-7_ 3 _ _ 3 _ _ 3 _3 3 3 n 3 N 3 _ _ _ _ IM IM IM IM 5-8 f 1 _t--- ---t 9-10 -_t 10-3 ---t---9-6 t 9-9---t--8- -----12-0 0 NII NII NII NII IM I,',) IM IM IM IM IM IM N I N I N I N I N I N I N I to to to to to ■o Io to Io Io (vTXti)o to Io NII NII NII NII NII NII NII NII NII NII NII NII NII I`D 1"' I`O IC" I`O ICS ICS I`O I`D � ICS I`n IC" ICO to to to Ito to to to to to to to Io NII NII NII NIoI NII NII NII NII NII NII NII NII NII I I I I I I I I I I I I Nlo NII Nlo Nlo NlI o Nloi Nlo Nloi Nlo Nlo Nloi Nloi Nlo 0 0 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NII NII NII I NII NII NII NII NII NII NII ICS IcO I`O I`O I`O I`� ICS ICS ICS ICS ICS ICS ICS ° I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NII NII NII NII NII NII NII NII NII NII I I`O I`O I`O I`O I`O m I`O to I`D I`O I`O I`O I`O Io to Io o Io 0 o Io Io Io Io �o Io NII NII NII NII NII NII NII NII NII NII NII NII NII 1<o I`o 1`O I`o I`D I`o 1tO I`D 1`n 1`n I`o 1`O I`o I I I I I I I I I I I Nlo Nli NlI o Nli NlI o NII Nlo Nlo Nlo Nlo Nlo Nlo Nlo ICS ICS I`D `� I`D o 1`� ICS ICS ICS 1`� 1`D ICS to to o to ; 1 to I to to NII NII NII NII NII _ I yVll NII NII 11 NII NII pzzj�II�Io o 1° 1° 10 Io Io I�� I�l� Io/Oz I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NII NII NII NII NII NII NII NII 1 NII NII I I`D I`O to I`O I`O I`O I`O ICO I`D I`O I`O to to to to to to i \, i I IQI1 \ to `' Io Io \ - to IIX• ''lo Io NI NII I I NII NII NII � I \ i i 'r11 I;; \ i NII �-____-� NII \ NII NII 1 I NI I I •\ I \ I i •\ i I •\ I I •\ I I II I I I I I �, I I I I I I I F I 0 0 0 0 0 o aj'•, o o o- o y o NII NII I I NII i \ NII i•\ NII i \ I i \ NI '� I NJXyII1�c�D N(XyIII1�0`�O I III1,I NIII1�0`}O I NIII1,10`�I \, l;; ,'• i NIIIocOI I NII1`O •_-N�II1r0`O II1 - I -- o 4 4 I F -- / 4 4 4 �� 4 __--i=F10 --r-T-0- 10-2 10 --- - 9-9--- -- 12-0--------___ - _1 - - is-_- - 6 ..-- ---- ----_0-10 11-0 ____ 7-614 IM IM IM IM I IM IM I IM IM IM In IM IM IM / I N N I N N I N N N N N N N I N I S 11� '� '� I I '� '� t== _•-*..� I� t - '� NIS NIS I� o NIS 0 I \• NIS I \ 5 1� II \ II rlj \ I NIS I - _� NIS III I I I I I I _ I I I I I I '---`__-------- 0 _ '-_-- I I \ I I I I \ I I I -_�_______�� i \• _ - o \ I I 0 i '' � i \i i� '\i i \i � •`\iii �-�''� ii ii � I •�! � � � �V II 1 I t___________, I EXISTING FIRE SPR SCALE: 3/32" = 1' GM STOCK NKLER DEMOLITION 0 5' 10' 20' PLAN HYDRAULIC DESIGN SYSTEM #1: AREA #1 GM STOCK SPRINKLERS CALCULATED: 12 SPRINKLERS SPRINKLERS CALCULATED: E: SPRINKLERS MINIMUM PRESSURE: 11 7 PSI MINIMUM PRESSURE: 11 12 PSI AREA OF DISCHARGE: 12 SPRINKLERS 11 HOSE ALLOWANCE 250 GPM SPRINKLER SYSTEM DEMAND ® 20: 540 GPM DEMAND ® 20: PRESSURE 34 PSI CALC FILE: YELM 3705 AREA... CALC FILE: I YELM 3705 AREA... C HYDRAULIC DESIGN SYSTEM #1: AREA #1 GM STOCK W 0 z w cn PROTO: SPRINKLERS CALCULATED: E: SPRINKLERS N DOCUMENT DATE: MINIMUM PRESSURE: 11 12 PSI CD CD � AREA OF DISCHARGE: 2 SPRINKLERS HOSE ALLOWANCE 250 GPM SPRINKLER SYSTEM DEMAND ® 20: 117 GPM DEMAND PRESSURE ® 20: 22 PSI CALC FILE: I YELM 3705 AREA... o u Ln 00 16 15 14 �13 12 O ° � � O Off_ O O� O O�� ��� � ��� ���:70� 3 t ----3----t----3--- - ---- 3--- -3 M 11 IN 3 10 IN � 9 IN 3 8 IN 3 _7 IN 3 s_ IN _ 5_ ---- - - 6 10-10 11-0 10-9 11-1 4-7 _______ __ __ _ _ IM IM IM IM IM 5-8 9-10 10-2 9-10 10-3 9-6 9-9 8-0 12-0 0 N I N I N I N I N I M M M M M M M M I� I� I� I� I� NIIN11 NII N11 N11 NII NII NII + += + Io to Io Io Io Io o\)\\\`.�\\U�\\1\\\\�\\\\1�V� (�71yo �ITWyo �7WIyo (�71yo �7WIyo �7WIyo �7WIyo NII NII NII NII NII NII I �1 NII NII N11 NII NII NII NII N4/o Ngo I I I I I I I I I I I to I� to 0 0 0 0 0 0 0 0 0 0 u NII NII NII NII NII NII NII NII NII NII NII r I`D I`O I`D I`O IcO I`O I� ItO I`O I`O ItO r 40 1 36 I 1 O I 2 I I I I I I I I I I I I I - I - 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NQJI��I NII NQJI�I NII NII NQJII NI I NII NII NII I NQJ19�I I —" 1� I ; 41 1`037 I`o I O I I I I I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NII NII NII NII NII NII NII NII QfI`O I`O Qfo I`� Qfo Qfo to to QJo 42 QfCD 38 1C� NIo I I I + I I + I I I I 21 l� I I I I I I 1 I 1(' I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 NII NII NII NII NII NII NII NII NII NII NII NII NII NII 1� 1� 1`D 1`n1� 1`O 1`0 43 Io 39 Io 22 I� + + + 1><+ I I I I I I I 1 1 I I I I 0 0 0 0 0 0 0 0 0 0 0 I I I I I I I I I I I NIo NIo NIo to to to to to to to to to to to to to to NII NII NII NII NII NII NII NII NII NII NII NII NII NII ICS ICS ICS ICS ICS I`D to I`O ICS ICS ICS ICS ICS ICS 0 0 o o� o o o� to �lo al 07,NII NII NII N:I NII NII NII NII NII NII 11 NII NII 11 I`D 1� co co <o I I I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N11 NII NII NII NII NII NII NII NII NII NII NII NII NII NII 1<o I`D 1tO I`D 1`O I`D I`o I`D I`D ItO 1`O I`D I`D I`D ItO -� + I I I I I I I I I I I I I 0 0 0 0 0 0 0 0 0 0 0 NII NII NI NII 11 NII NI I NII NII NII NII NII NII SII° 10 I° Io ,. I° I° 10 111 I° 1 1 + + + + 1 1 + �o I I I I I I r------'---------T---------T---------T---------Z--I 1 I I 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NI NII NII NII NII NII I NII NII NII NII NII I NII NII NII II ICS I`� QJ`O II�CO QfI`D Io 1 ICO 11`O I� I - T I QJI`O Io to I`O I I I I �~+��~ ��� I b ti+b�� I+b�� to to I to 7,' to ( Q to to �� Q� to to o I I to to to I� NII NII NII NII I NII I NII NII NII NII � NII I NII NII NII I �14 w - w IIIf" —FI�-�— —ICP/35 34 33 32 I 53 - 31 65 62 30 Q 50 ^ 592956I 28472725 23V4 N 4 N I N N N 1 4 4 4 4 4 4� �4 _N I (4 NT -I 4 N I 4N 4 Q.9__ _ - -- - - -- - -- --- --- - -T-- -------- -------- _ _ ---- - --- -- - - --- --- -- --- -- - - -- -- ---- -t 1 - 10-10 11-0 10-9 11-1 21¢ 3-94 0 -214 3 914 5-81¢ 3-314 6-614 2-5 -9S� t 9-6 9-9 8-0 12-0 6-0 7-6 NIM NIM NIM NIM NIM NIM x' 1 51 � 49 NIM 48 NIM 48 NIM I NIM NIM NIM NIM I T 1 52 fit 1 M 1� 5555 1� OI _ - 64 1'i -I I'f-I 5S I'i-I�/ J, I'i-I LJ I 67 I I I I I I I s33 60 , 66 0 0 0 0 o 0 0 0 0 0 0 0 0 NII NII NII NII II o NII I U LJ NII LJ NII LJ NII I NII I NII NII NII NII I Q9 Q9 Q9 Q9 Q9 Q9_Q9_ _Q9 , REMOTE AREA #2 REMODELED GM FIRE SPRINKLER SCALE: 3/32" = 1' 0 5 STOCK PIPING 10' 20' PLAN REMOTE AREA #1 C w O ~ w O w 0 0 w O OZ w w— z z w w w W Z LLI U, o o ~��wwWww��z W ww¢00 W w¢ = w w O O o w w U Q_ �Q¢a�� aO'0m ulw > w ¢ ¢L`z0 z��¢OO��w=� Z DUH \�0 z z(n-z�O w0zo0 3¢wUZOz z<=EEn�L�z Q�Qo Q �¢In OO (no Ozw J ¢ ¢�zJ� JV)o 0N� c Z o W 0 0 w O m w= a rr z 0 W O Q �w_z��O�QOOw���w =�w�¢���XwUwWD= u� u0mILowEl� :::j1PT¢F- %0_zm O O 0 O O ZN DRAWN BY: W 0 z w cn PROTO: 195 PROTO C YC LE: N DOCUMENT DATE: O r n CD CD � QO z W D o u Ln 00 �UUUn IUU�� \ o o � cel w En z En O 3 L 1� CHECKED BY: DRAWN BY: B Y PROTO: 195 PROTO C YC LE: 03/26/2021 DOCUMENT DATE: 05/03/2021 STATE OF WASHINGTON FIRE SPRINKLER CERTIFICATE OF COMPETENCY FSCC-24676 EXPIRES 12-31-2021 DOCUMENTS THAT DO NOT HAVE THE ARCHITECT OR ENGINEER OF RECORD SEAL AND SIGNATURE SHALL BE CONSIDERED NOT FOR C ONSTRUC TION FIRE SPRINKLER REMODEL PIPING PLAN "-�FFT, FP2