Tami emails Microsoft Outlook - Memo Style6/10/2021
Tami Merriman
From:Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent:Thursday, October 1, 2020 1:21 PM
To:Derek McCoy
Cc:Tami Merriman
Subject:\[External\]Standley Garage - Civil Plan Resubmittal
Attachments:Standley Response Ltr.pdf; Standley Revised Plans.pdf
Derek -
Attached are revised civil plans for your review. All comments have been addressed with the exception of
submitting landscape plans. Those plans will be sent following this submittal.
We had discussed most of the comments previously via emails and I have referenced them in my attached
response letter.
Please don't hesitate to contact me if you have any questions.
Respectfully
Jim Gibson
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
1
Tami Merriman
From:Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent:Thursday, July 16, 2020 1:08 PM
To:Derek McCoy
Cc:Tami Merriman
Subject:Re: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review
1
Derek and Tami -
Thank you for working with us on these questions. I will inform the client of the decisions and move forward
with the revised plans.
Have a great weekend!
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
On Thu, Jul 16, 2020 at 8:48 AM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
See below for Tami’s and my responses to your questions.
1. Provide engineers estimate for water usage - Our plan was to submit a similar use using City of Yelm
water records, will this be acceptable? The actual use is only going to be restrooms for
patrons/employees and maybe a small use for clean up. It will be less than 1 eru of usage.
I looked at browns care, and they average less than 1 ERU. I am good with his finding.
2. Provide refuse container and Pacific Disposal approval - The owners are planning to only use a small
refuse container and will be keeping it inside the building, to be placed out on the mornings of
scheduled pick up. Based on this, they are asking to not have to install a refuse enclosure that they will
not be utilizing.
Note on plan that individual can pick up proposed, all cans stored inside except for scheduled pick up days.
3. Show mailbox location and details - After talking with the owner they have procured a post office box at
Yelm Post Office and would not be using a separate mailbox located at the property. We would ask
that this cluster not be required.
PO Box is fine.
2
4. Landscape Plans - The owners are planning to provide a plan of their proposed plantings. One
clarification I wanted to ask about was the placement of the perimeter fence. One the civils I show it
on the property line with the landscaping inside the fence. The preliminary plans had the landscaping
on the outside with the wood fence shown 8' off the property line. We would like to have the fence on
the property line and be able to secure the landscaping within the property boundaries. Would you
confirm this is acceptable to the City?
Landscape to be outside of the wood fence to provide visual screening between adjacent properties. It is their choice to
construct the solid wood fence. Landscaping on the inside of the fence does not meet the intent of perimeter
landscape.
5. Irrigation is intended to be a design build installation. I will add the irrigation meter and DDCV on the
irrigation plans so the City knows the location and size of the service.
This is acceptable.
6. The last item is a possible deferment on the frontage improvements. The owners wanted me to see if the
City would consider a frontage improvement deferment on the project. At this time, installing the
sidewalk would shift the pedestrians south to a mid block unstripped crossing point of West Road. If
the sidewalk was left as is today the pedestrians would continue to cross West Road at the ADA ramps
located at 4th St. Thanks for your consideration on the deferment.
th
The ADA crossing is at 4. Ending a sidewalk at the property line is standard… as seen all over town. The SPR approval
stated they intended to construct the sidewalk/planter strip, and deferral was not requested. In order to make this
change, we would need to have them reapply to amend their approval.
Hope you are having a good week.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
3
From: Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent: Wednesday, July 15, 2020 10:04 AM
To: Derek McCoy <DerekM@Yelmwa.gov>; Tami Merriman <tamim@Yelmwa.gov>
Subject: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Derek/Tami -
I have a couple of questions concerning the civil review comments of the above project. Please see below:
1. Provide engineers estimate for water usage - Our plan was to submit a similar use using City of Yelm
water records, will this be acceptable? The actual use is only going to be restrooms for
patrons/employees and maybe a small use for clean up. It will be less than 1 eru of usage.
2. Provide refuse container and Pacific Disposal approval - The owners are planning to only use a small
refuse container and will be keeping it inside the building, to be placed out on the mornings of
scheduled pick up. Based on this, they are asking to not have to install a refuse enclosure that they will
not be utilizing.
3. Show mailbox location and details - After talking with the owner they have procured a post office box at
Yelm Post Office and would not be using a separate mailbox located at the property. We would ask
that this cluster not be required.
4. Landscape Plans - The owners are planning to provide a plan of their proposed plantings. One
clarification I wanted to ask about was the placement of the perimeter fence. One the civils I show it
on the property line with the landscaping inside the fence. The preliminary plans had the landscaping
on the outside with the wood fence shown 8' off the property line. We would like to have the fence on
the property line and be able to secure the landscaping within the property boundaries. Would you
confirm this is acceptable to the City?
5. Irrigation is intended to be a design build installation. I will add the irrigation meter and DDCV on the
irrigation plans so the City knows the location and size of the service.
6. The last item is a possible deferment on the frontage improvements. The owners wanted me to see if the
City would consider a frontage improvement deferment on the project. At this time, installing the
sidewalk would shift the pedestrians south to a mid block unstripped crossing point of West Road. If
the sidewalk was left as is today the pedestrians would continue to cross West Road at the ADA ramps
located at 4th St. Thanks for your consideration on the deferment.
Thank you for taking the time to consider our above questions. We will be resubmitting the revised plans
within this week.
Very Respectfully
Jim G
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
4
On Mon, Jun 22, 2020 at 5:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
I have completed the initial Civil Plan Review of City of Yelm Project # MU 2020.0018 Standley Garage
(Previously Proj# 2017.0160)
Attached is the review comment letter and below is a link to the markup plans that are on the City of Yelm
“Civil Plan Review” G-Suite Shared Drive. You should have also received an email as added you as a
member and gave you contributor access.
https://drive.google.com/file/d/1zL2Z1U7xcti04AWx3YaVgVdIErN6XwBj/view?usp=sharing
Let me know if you have any questions.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
5
Tami Merriman
From:Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent:Wednesday, July 15, 2020 10:04 AM
To:Derek McCoy; Tami Merriman
Subject:\[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Attachments:2020.0185 CPR 1 LTR 6.22.2020.pdf
Derek/Tami -
I have a couple of questions concerning the civil review comments of the above project. Please see below:
1. Provide engineers estimate for water usage - Our plan was to submit a similar use using City of Yelm
water records, will this be acceptable? The actual use is only going to be restrooms for
patrons/employees and maybe a small use for clean up. It will be less than 1 eru of usage.
2. Provide refuse container and Pacific Disposal approval - The owners are planning to only use a small
refuse container and will be keeping it inside the building, to be placed out on the mornings of scheduled
pick up. Based on this, they are asking to not have to install a refuse enclosure that they will not be
utilizing.
3. Show mailbox location and details - After talking with the owner they have procured a post office box at
Yelm Post Office and would not be using a separate mailbox located at the property. We would ask that
this cluster not be required.
4. Landscape Plans - The owners are planning to provide a plan of their proposed plantings. One
clarification I wanted to ask about was the placement of the perimeter fence. One the civils I show it on
the property line with the landscaping inside the fence. The preliminary plans had the landscaping on
the outside with the wood fence shown 8' off the property line. We would like to have the fence on the
property line and be able to secure the landscaping within the property boundaries. Would you confirm
this is acceptable to the City?
5. Irrigation is intended to be a design build installation. I will add the irrigation meter and DDCV on the
irrigation plans so the City knows the location and size of the service.
6. The last item is a possible deferment on the frontage improvements. The owners wanted me to see if the
City would consider a frontage improvement deferment on the project. At this time, installing the
sidewalk would shift the pedestrians south to a mid block unstripped crossing point of West Road. If the
sidewalk was left as is today the pedestrians would continue to cross West Road at the ADA ramps
located at 4th St. Thanks for your consideration on the deferment.
Thank you for taking the time to consider our above questions. We will be resubmitting the revised plans
within this week.
Very Respectfully
Jim G
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
On Mon, Jun 22, 2020 at 5:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
6
Jim,
I have completed the initial Civil Plan Review of City of Yelm Project # MU 2020.0018 Standley Garage
(Previously Proj# 2017.0160)
Attached is the review comment letter and below is a link to the markup plans that are on the City of Yelm
“Civil Plan Review” G-Suite Shared Drive. You should have also received an email as added you as a member
and gave you contributor access.
https://drive.google.com/file/d/1zL2Z1U7xcti04AWx3YaVgVdIErN6XwBj/view?usp=sharing
Let me know if you have any questions.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
7
Tami Merriman
From:Derek McCoy
Sent:Friday, July 10, 2020 10:52 AM
To:Constance Standley; Jim Gibson
Cc:Tami Merriman; Cody Colt; Ashlee Sund; Tony Edwards; John Edwards
Subject:2020.0018 MU Standley Garage - 2020.0205.CI0009 Grading Permit Issued
Attachments:2020.0205.CI0009 Grading Permit Invoice.pdf; 2020.0205.CI0009 Grading Permit
Issue.pdf; 2020.0205.CI0009 GRD Plans - Approved.pdf
Constance,
Here is the Grading Permit and associated documents for Project # MU 2020.0018 – Standley Garage including the
permit invoice for $54.00.
You will notice the permit states a pre-construction meeting is required, but this is a standard note for Civil Plan Review
Permits and this requirement can be deferred to when the rest of the plans get approved.
Hope you have a great weekend!
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
From: Constance Standley <standleys4@msn.com>
Sent: Friday, July 10, 2020 9:22 AM
To: Derek McCoy <DerekM@Yelmwa.gov>
Subject: Re: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Perfect, thank you so much! We just wanted to make sure that we didn't do anything to get ourselves in trouble
(especially with the number of city of yelm trucks that kept driving by and staring yesterday lol).
Connie Standley
From: Derek McCoy <DerekM@Yelmwa.gov>
Sent: Friday, July 10, 2020 3:01 AM
To: Constance Standley <standleys4@msn.com>; Jim Gibson <J.E.GibsonConsulting@gmail.com>
Subject: RE: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Constance,
I had several meetings that went long this afternoon and did not get to creating the permit. I will put it at the top of my
task list for tomorrow morning and send it to you.
8
Don’t worry about it slowing your work though, you have the approval I just need to follow up with the documentation.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
From: Constance Standley <standleys4@msn.com>
Sent: Thursday, July 9, 2020 7:32 PM
To: Jim Gibson <J.E.GibsonConsulting@gmail.com>; Derek McCoy <DerekM@Yelmwa.gov>
Subject: Re: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Hi Derek,
I didn't receive the dirt work permit in my email today...would you be able to send it to me so we can have it
before starting the work tomorrow? Thanks so much!
Connie Standley
253-468-0586
From: Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent: Thursday, July 9, 2020 7:00 PM
To: Derek McCoy <DerekM@yelmwa.gov>
Cc: Constance Standley <standleys4@msn.com>
Subject: Re: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Derek -
Attached are a copy of the plans with my signature on them. As we discussed this project does not require the
DOE Stormwater Permit because it does not meet the threshold of the permit. It is under 1 acre and will
infiltrate all its stormwater within the site.
I will be following up shortly with a landscaping plan, lighting layout and few remaining comments.
Respectfully
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
On Tue, Jul 7, 2020 at 1:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
9
I would be comfortable issuing an early clear and grading permit for this project. If you could provide me an updated
Construction SWPPP and CESCL Contact information I will extract out the appropriate sheets from the plans and draft
an approval letter for TESC, Grading and Drainage. I am assuming that you will apply for a General Construction
Stormwater Permit through DOE?
For these early grading permits I have been creating another Civil Plan Review permit under the project and just billing
an hour of Staff Review ($54 / hr).
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From: Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent: Monday, July 6, 2020 1:29 PM
To: Derek McCoy <DerekM@Yelmwa.gov>
Cc: Tami Merriman <tamim@Yelmwa.gov>; Chris Vaccaro <ChrisV@Yelmwa.gov>
Subject: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Derek -
My client has asked me to inquire about the process of getting an early clear and grading permit to start work
on the stormwater pond? It appears that the remaining revisions to the plans would not affect the
construction of the storm pond or installation of TESC measures. What would you need to allow them to get
started?
Jim
Jim Gibson, PE
c. 360.951.1454
10
J.E.Gibson Consulting
On Mon, Jun 22, 2020 at 5:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
I have completed the initial Civil Plan Review of City of Yelm Project # MU 2020.0018 Standley Garage
(Previously Proj# 2017.0160)
Attached is the review comment letter and below is a link to the markup plans that are on the City of Yelm
“Civil Plan Review” G-Suite Shared Drive. You should have also received an email as added you as a
member and gave you contributor access.
https://drive.google.com/file/d/1zL2Z1U7xcti04AWx3YaVgVdIErN6XwBj/view?usp=sharing
Let me know if you have any questions.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
11
Tami Merriman
From:Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent:Tuesday, July 7, 2020 4:24 PM
To:Derek McCoy
Cc:Tami Merriman; Chris Vaccaro
Subject:Re: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review
1
Attachments:image004.jpg
Let me talk to the client and get a go-ahead before you do the work. I should get back with you tomorrow.
Jim Gibson
On Tue, Jul 7, 2020, 1:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
I would be comfortable issuing an early clear and grading permit for this project. If you could provide me an updated
Construction SWPPP and CESCL Contact information I will extract out the appropriate sheets from the plans and draft
an approval letter for TESC, Grading and Drainage. I am assuming that you will apply for a General Construction
Stormwater Permit through DOE?
For these early grading permits I have been creating another Civil Plan Review permit under the project and just billing
an hour of Staff Review ($54 / hr).
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
From: Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent: Monday, July 6, 2020 1:29 PM
12
To: Derek McCoy <DerekM@Yelmwa.gov>
Cc: Tami Merriman <tamim@Yelmwa.gov>; Chris Vaccaro <ChrisV@Yelmwa.gov>
Subject: \[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Derek -
My client has asked me to inquire about the process of getting an early clear and grading permit to start work
on the stormwater pond? It appears that the remaining revisions to the plans would not affect the
construction of the storm pond or installation of TESC measures. What would you need to allow them to get
started?
Jim
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
On Mon, Jun 22, 2020 at 5:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
I have completed the initial Civil Plan Review of City of Yelm Project # MU 2020.0018 Standley Garage
(Previously Proj# 2017.0160)
Attached is the review comment letter and below is a link to the markup plans that are on the City of Yelm
“Civil Plan Review” G-Suite Shared Drive. You should have also received an email as added you as a
member and gave you contributor access.
https://drive.google.com/file/d/1zL2Z1U7xcti04AWx3YaVgVdIErN6XwBj/view?usp=sharing
13
Let me know if you have any questions.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
www.yelmwa.gov
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
14
Tami Merriman
From:Jim Gibson <j.e.gibsonconsulting@gmail.com>
Sent:Monday, July 6, 2020 1:29 PM
To:Derek McCoy
Cc:Tami Merriman; Chris Vaccaro
Subject:\[External\]Re: 2020.0018 MU Standley Garage - 2020.0185.CI0009 Civil Plan Review 1
Derek -
My client has asked me to inquire about the process of getting an early clear and grading permit to start work on
the stormwater pond? It appears that the remaining revisions to the plans would not affect the construction of
the storm pond or installation of TESC measures. What would you need to allow them to get started?
Jim
Jim Gibson, PE
c. 360.951.1454
J.E.Gibson Consulting
On Mon, Jun 22, 2020 at 5:09 PM Derek McCoy <DerekM@yelmwa.gov> wrote:
Jim,
I have completed the initial Civil Plan Review of City of Yelm Project # MU 2020.0018 Standley Garage
(Previously Proj# 2017.0160)
Attached is the review comment letter and below is a link to the markup plans that are on the City of Yelm
“Civil Plan Review” G-Suite Shared Drive. You should have also received an email as added you as a member
and gave you contributor access.
https://drive.google.com/file/d/1zL2Z1U7xcti04AWx3YaVgVdIErN6XwBj/view?usp=sharing
Let me know if you have any questions.
Derek M. McCoy, PE, Civil Review Engineer / Project Engineer
Office 360.458.8132 Cell 253.278.2937
15
www.yelmwa.gov
16
Tami Merriman
From:Constance Standley <standleys4@msn.com>
Sent:Wednesday, July 19, 2017 9:26 PM
To:Tami Merriman
Subject:Standleys Garage
Attachments:Site Proposals.docx
Tami,
Justin Jones dropped off our new site plan and I wanted to have this proposal attached. Could you possibly do
that for me? Thank you so much for your help!
Connie and Joe Standley
17
Tami Merriman
From:Constance <standleys4@msn.com>
Sent:Thursday, April 6, 2017 1:29 PM
To:Tami Merriman
Subject:Re: Standley Commercial Development
Tami,
Thank you so much for getting back to me! :-) I know we'll need to get with Skillings/Connolly to fix all of this
and make it easier to understand. If you don't mind, could we come in sometime around noon to pick your
brain? We so appreciate you and your help!
Connie Standley
From: Tami Merriman <tamim@ci.yelm.wa.us>
Sent: Thursday, April 6, 2017 8:08:01 PM
To: Constance
Subject: RE: Standley Commercial Development
Connie
If you remove the addition of the building, it will keep the project as a ministerial SPR, no public notice and no additional
fee.
If the sidewalk and planter strip do not require additional right of way, then the right of way dedication on the plan
shouldn’t be shown. Your consultant will need to show the actual right of way width existing and if dedication is
required. When the right of way is determined, your 8 foot perimeter landscape strip will begin. The ADA parking stall
has a 16 foot width (stall and required striping). This ADA standard must be kept. This is something that you should
discuss with Skillings Connely.
I am not sure what you are intending for access, but we cannot have area where vehicles will be driving or stored that is
not paved due to stormwater standards. If you propose something different you will need to show your intentions as
well as how you intend to keep the area inaccessible.
I have to leave the office at 3pm today, but will be in the office tomorrow all day.
Tami Merriman
Associate Planner
City of Yelm
105 Yelm Ave W
Yelm, WA 98597
(360) 458-8496
tamim@yelmwa.gov
From: Constance \[mailto:standleys4@msn.com\]
Sent: Wednesday, April 05, 2017 3:14 PM
To: Tami Merriman
Subject: Re: Standley Commercial Development
18
Tami,
Would you happen to be available for Joe and I to come out and talk to you about a few things? Possibly
tomorrow? We were wondering about the five foot shoulder that we were originally told we wouldn't need, but
you said would be needed in this site plan, as well as the encroachment. We will have Skillings/Connolly
remove the proposed addition at the end of the building (we had already decided we weren't going to be doing
that), and remove the new walkway next to the ADA parking so that it can be moved next to the old walkway.
We were also planning on closing off the employee driveway and leaving that without asphalt; is that plausible?
We're trying to get everything working asap. Thanks so much for your help!
Connie Standley
253-468-0586
From: Tami Merriman <tamim@ci.yelm.wa.us>
Sent: Tuesday, April 4, 2017 9:59:09 PM
To: standleys4@msn.com
Cc: Ron Boursaw; dmaroon@skillings.com
Subject: Standley Commercial Development
Joe & Connie
I have reviewed the application submitted, and provide the following comments in my letter attached.
Tami Merriman
Associate Planner
City of Yelm
105 Yelm Ave W
Yelm, WA 98597
(360) 458-8496
tamim@yelmwa.gov