2021.0325.PR0009 Stor-House Yelm Civil Entitlement Plans 06-04-2021i
0
V)
0
M
- O
o N
.E �
U
Li
CD
Of
E(D
oz
J
N N
Z
�o
U
'(S
CD L�j
� U
PROJECT SPECIFICATIONS:
THE WORK ON THIS PROJECT SHALL BE ACCOMPLISHED IN
ACCORDANCE WITH THE FOLLOWING:
1) THE MOST CURRENT VERSION OF THE WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION
2) THE MOST CURRENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD)
3) THE MOST CURRENT EDITION OF THE INTERNATIONAL BUILDING
CODE (IBC)
4) THE MOST CURRENT EDITION OF THE AUTHORITY HAVING
JURISDICTION DEVELOPMENT GUIDELINES AND PUBLIC STANDARDS
THE CONTRACTOR SHALL OBTAIN COPIES OF THESE PUBLICATIONS AT
THE CONTRACTOR'S OWN EXPENSE.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT, TRANSPORTATION, SUPPLIES, AND
INCIDENTALS REQUIRED TO COMPLETE ALL WORK SHOWN ON THESE
DRAWINGS AND TO OBTAIN ACCEPTANCE BY THE AUTHORITY HAVING
JURISDICTION AND THE PROJECT OWNER.
ANY PROPOSED ALTERATIONS BY THE CONTRACTOR AFFECTING THE
REQUIREMENTS AND INFORMATION IN THESE DRAWINGS SHALL BE
SUBMITTED TO THE ENGINEER OF RECORD IN WRITING FOR APPROVAL.
CONTRACTOR LIABILITY NOTE:
THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD J.E. GIBSON
CONSULTING HARMLESS FROM ANY AND ALL LIABILITY, REAL OR
ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS
PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE
NEGLIGENCE OF J.E. GIBSON CONSULTING.
GRADING NOTE:
ANY CUT AND FILL QUANTITIES, IF SHOWN ON THESE DRAWINGS, ARE
ESTIMATED IN-PLACE VOLUMES AND ARE FOR PLANNING PURPOSES
ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY QUANTITIES
AND APPLY SHRINK AND/OR SWELL FACTORS.
TOPOGRAPHIC NOTE:
TOPOGRAPHIC INFORMATION SHOWN ON THESE DRAWINGS WERE
PROVIDED BY A THIRD PARTY SURVEYOR. THE CONTRACTOR SHALL
VERIFY TOPOGRAPHIC INFORMATION IN THE FIELD PRIOR TO
SUBMITTING A BID AND SHALL CONTACT THE ENGINEER OF RECORD IF
THERE IS A DISCREPANCY.
EROSION CONTROL NOTE:
EROSION CONTROL MEASURES ARE NOT LIMITED TO THE TO THE ITEMS
ON THESE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR THE
INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES.
NO SILTATION OF EXISTING OR PROPOSED STORMWATER FACILITIES
SHALL BE ALLOWED. CARE SHALL BE TAKEN TO PREVENT MIGRATION
OF SILTS TO OFF-SITE PROPERTIES. ALL DISTURBED EARTH CAUSED BY
CONTRACTOR'S ACTIVITIES SHALL BE RESTORED IN ACCORDANCE WITH
THE LANDSCAPING PLANS OR HYDROSEEDED IF NO LANDSCAPING PLANS
EXIST.
IF DISCHARGING TO WATERS OF THE STATE AND DISTURBING MORE
THAN ONE (1) OF LAND, THE CONTRACTOR IS RESPONSIBLE FOR
APPLYING AND SECURING COVERAGE UNDER WSDOE'S NPDES GENERAL
PERMIT. THE CONTRACTOR IS HEREBY NOTIFIED THAT IT CAN TAKE UP
TO SIXTY (60) DAYS TO ACQUIRE COVERAGE.
REMOVAL & REPLACEMENT OF
UNSUITABLE MATERIALS:
WHENEVER EXCAVATING ACTIVITIES ON-SITE EXPOSE PEAT, SOFT
CLAY, QUICKSAND, OR OTHER UNSUITABLE FOUNDATION MATERIAL,
SUCH MATERIAL SHALL BE REMOVED TO THE DEPTH DIRECTED BY THE
GEOTECHNICAL ENGINEER AND BACKFILLED WITH SUITABLE FOUNDATION
MATERIAL.
UNSUITABLE MATERIAL SHALL BE REMOVED FROM THE SITE AND
HAULED TO A CONTRACTOR PROVIDED WASTE SITE. THE CONTRACTOR
SHALL FURNISH AND PLACE SUITABLE MATERIAL MEETING THE
REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE IBC.
STORM DRAINAGE NOTE:
TO PROTECT STORMWATER FACILITIES FROM SEDIMENTATION, THE
CONTRACTOR SHALL CONNECT THE FACILITY(IES) TO THE STORM
CONVEYANCE SYSTEM AFTER SITE WORK, ROADS, UTILITIES,
PERMANENT EROSION CONTROL MEASURES, AND FINAL LANDSCAPING
ARE IN PLACE.
DEWATERING:
FOUNDATIONS, UTILITY TRENCHES, AND ALL OTHER PARTS OF THE
CONSTRUCTION SITE SHALL BE DEWATERED AND KEPT FREE OF
STANDING WATER AND SATURATED CONDITIONS AS NECESSARY FOR
THE PROPER EXECUTION OF THE WORK. THE CONTRACTOR SHALL
FURNISH, INSTALL, OPERATE, AND MAINTAIN ALL DRAINS, SUMPS,
PUMPS, AND ALL OTHER EQUIPMENT REQUIRED TO PROPERLY DEWATER
THE SITE AS SPECIFIED. DEWATERING SYSTEMS THAT CAUSE A LOSS
OF SOIL FINES FROM FOUNDATION AND HARDSCAPE AREAS WILL NOT
BE PERMITTED.
UTILITIES LOCATE NOTE:
THE LOCATION OF EXISTING UTILITIES SHOWN HEREON IS BASED ON
INFORMATION OBTAINED FROM THE TOPOGRAPHIC SURVEY. J.E. GIBSON
CONSULTING ASSUMES NO RESPONSIBILITY AND/OR LIABILITY OF EXISTING
UTILITIES SHOWN OR NOT SHOWN HEREON. CONTRACTOR IS ADVISED TO
VERIFY THE EXACT SIZE, DIAMETER, DEPTH, AND LOCATION OF EXISTING
UTILITIES PRIOR TO STARTING CONSTRUCTION ACTIVITIES. CONTRACTOR
SHALL CALL FOR UNDERGROUND LOCATES AT 1-800-424-5555 PRIOR
TO STARTING CONSTRUCTION ACTIVITIES.
RECORD DRAWINGS:
J.E. GIBSON CONSULTING IS REQUIRED BY THE THE AUTHORITY HAVING
JURISDICTION TO PROVIDE RECORD DRAWINGS PRIOR TO ACCEPTANCE.
J.E. GIBSON CONSULTING WILL NOT CERTIFY RECORD DRAWINGS UNLESS
A REPRESENTATIVE OF THE COMPANY HAS INSPECTED ACTUAL
INSTALLATION OF UTILITIES PRIOR TO BACKFILLING.
THE CONTRACTOR SHALL MAINTAIN ONE SET OF THE APPROVED
DRAWINGS THAT SHALL INCLUDE RED LINE MARKUPS (LEGIBLE) OF ANY
ALTERATIONS TO THE DESIGN. THE RED LINE MARKINGS SHALL BE
SUBMITTED TO THE ENGINEER OF RECORD UPON PROJECT COMPLETION.
WORK IN THE RIGHT-OF-WAY:
CONTRACTOR SHALL OBTAIN RIGHT-OF-WAY PERMIT AND SHALL SUBMIT
A TRAFFIC CONTROL PLAN TO THE AUTHORITY HAVING JURISDICTION
PRIOR TO STARTING CONSTRUCTION ACTIVITIES. ALL WORK WITHIN THE
RIGHT-OF-WAY SHALL CONFORM TO THE AUTHORITY HAVING
JURISDICTION'S STANDARDS.
PROJECT INFORMATION:
APPLICANT:
PARCEL NUMBER
SITE ADDRESS:
PARCEL AREA:
SANITARY SEWER:
WATER:
FIRE DISTRICT:
FLOODZONE:
DATUM NOTE:
PATRICK GILROY
GILROY FAMILY FIVE LLC
1614 -118TH AVE SE
BELLEVUE, WA 98005
OFFICE: 425-999-8250
64303400404, 0405, 0402
10512 CREEK STEET SE
YELM, WA 98597
1.52 ACRES
CITY OF YELM
CITY OF YELM
SE THURSTON FIRE AUTHORITY
NONE SHOWN ON FEMA MAPS
VERTICAL - NAVD 88 BASED ON GPS TIES TO MONUMENTS USING
WASHINGTON STATE REFERENCE NETWORK.
HORIZONTAL - WASHINGTON STATE PLANE COORDINATES, SOUTH
ZONE, NAD 83/2011 BASED ON GPS TIES TO MONUMENTS USING
WASHINGTON STATE REFERENCE NETWORK.
N 1'57'03" E ON WEST LINE OF SECTION 29.
LEGAL DESCRIPTION:
PARCEL C OF CITY OF YELM BOUNDARY LINE ADJUSTMENT NO.
BLA-988215YL, AS RECORDED JUNE 2, 1998 UNDER AUDITOR'S FILE
NOS. 3157737 AND 3157738.
SURVEY UTILITY NOTE:
UTILITIES SHOWN HEREON ARE FROM MAPPING VISIBLE SURFACE
APPURTENANCES, MAPPING UTILITY PAINT MARKS FROM A UTILITY
LOCATING SERVICE, AND USING RECORD UTILITY SYSTEM MAPS
PROVIDED BY OTHERS. BURIED UTILITIES ARE ONLY SHOWN AS
APPROXIMATE AND SHOULD BE VERIFIED BEFORE CONSTRUCTION
ABBREVIATIONS:
AC ASPHALT CONCRETE
BCP BEGIN CURB RETURN
BM BENCHMARK
BVC BEGIN VERTICAL CURB
CB CATCH BASIN
CIP CAST IRON PIPE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CATV CATV COMMUNICATIONS
DIAM DIAMETER
DIP DUCTILE IRON PIPE
EE ELECTRICAL
ECR END CURB RETURN
EL ELEVATION
EVC END VERTICAL CURB
EXIST EXISTING
FFE FINISHED FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOWLINE / FLANGE
FM FORCE MAIN
G GAS
GM GAS METER
GB GB
HP HIGH POINT
L CURVE LENGTH
LF LINEAL FEET
MH MANHOLE
MJ MECHANICAL JOINT
PC POINT OF CURVATURE
PI POINT OF INTERSECTION
PL PROPERTY LINE
POB POINT OF BEGINNING
POC POINT OF CONNECTION
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
R/W RIGHT-OF-WAY
RD ROOF DRAIN
SS SANITARY SEWER
SD STORM SEWER
STA STATION
STEP SEPTIC TANK EFFLUENT PUMP
STD DTL STANDARD DETAIL
T TELEPHONE
TB THRUST BLOCK
TC TOP OF CURB
TYP TYPICAL
UGP UNDERGROUND POWER
W WATER
WM WATER METER
WV WATER VALVE
STORmHOUSE YELM
10512 CREEK STREET SE, YELM, WA. 98597
SECTION 29, TOWNSHIP 17, RANGE 2E, W.M.
"CALL UNDERGROUND LOCATE AT 811 BEFORE YOU DIG"
LEGEND & LINETYPES:
EXISTING
-----X -----X -----X -----X -----X -
-----W-----W-----W-----W-----W-
----- ss ----- ss ----- ss ----- ss —
----- SD ----- SD ----- SD ----- SD —
-----G -----G -----G -----G -----G -
-----P -----P -----P -----P -----P -
----- OH ----- OH ----- OH ----- OH —
----T-OH-----T-OH-----T-OH
-----T -----T -----T -----T -----T -
-----C -----C -----C -----C -----C -
PROPOSED
W
W
SS
SS
1
FM
FM
2
SD
SD
3
SP -01
G G
P P
OP OP
—T -OH T -OH
-----T -----T -----T -----T -----T -
RIGHT-OF-WAY LINE
PROPERTY LINE
CENTERLINE
EASEMENT LINE
SAWCUT LINE
EDGE OF PAVEMENT/CURB LINE
EDGE OF GRAVEL LINE
SIDEWALK LINE
BUILDING LINE
FENCE LINE
WATER LINE
SEWER LINE
FORCE MAIN LINE
STORM LINE
DITCH LINE
ROADWAY STRIPE LINE
GAS LINE
POWER LINE
OVERHEAD POWER LINE
OVERHEAD PHONE LINE
TELEPHONE LINE
CABLE/COMMUNICATIONS LINE
STORM CATCH BASIN
STORM MANHOLE
FIRE HYDRANT
WATER METER
GATE VALVE
THRUST BLOCKING
WATER BENDS
WATER TEE
SEWER MANHOLE
STORM/SEWER CLEANOUT
VICINITY MAP
NOT TO SCALE
ENTITLEMENT SHEET INDEX
SHEET N0.
SHEET REF.
SHEET DESCRIPTION
1
CV -01
COVER SHEET
2
SV -01
TOPOGRAPHIC SURVEY
3
SP -01
PREL. SITE/PAVING/HORIZ. PLAN
4
SD -02
PREL. GRADING/STORMWATER PLAN
5
UT -01
PREL. WATER/SEWER PLAN
6
7
8
9
-
10
C
ENTITLEMENT PLANS:
THESE PLANS AREA INTENDED FOR THE CITY OF YELM LAND USE
ENTITLEMENT PROCESS. INFORMATION CONTAINED IS INTENDED TO
DEMONSTRATE THE FEASIBILITY OF THIS PROJECT AND THAT IT MEETS
THE CITY'S REQUIREMENTS. A SEPARATE SET OF CONSTRUCTION
DOCUMENTS WILL BE SUBMITTED FOR CONSTRUCTION APPROVAL THAT
WILL INCLUDE ALL NECESSARY CONSTRUCTION DETAILS, CITY STANDARD
NOTES AND DETAILS REQUIRED FOR CONSTRUCTION APPROVAL.
N
O
N
w
Q
0
w
w
Z
w
J
U
w
co cn
0 0
N
w w
a
vplE
C, � OF WASy j2Cf�
� c
Q �P O O
QL
o <v
420 10
�FGISTE��Q
SSI O N A L
00
2E
J
LU w
Lu >_
= w
cn U)
0f 0
Lu O
O O
U)
Lo
J W O
(J7 O
>> 00
FLQQN
J=jd�
— ~W O
ao
Qr5c�
LLr>�
N
>_ J
0 J
W
J m
Mo
Z
DRAWING NO:
CV -01
SHEET N0:
1 OF 5
Ln
Ln
0
M
00
Ln
00
Q
0
z
z
w
00
rl
x
0
Co
0
N
j
C)
o
U
N
Z
-
C
O
,n
N
O
O
rlo
O
N
Lu
w
coz
~
mJ
Lu
o
co
U -
2E
J
LU w
Lu >_
= w
cn U)
0f 0
Lu O
O O
U)
Lo
J W O
(J7 O
>> 00
FLQQN
J=jd�
— ~W O
ao
Qr5c�
LLr>�
N
>_ J
0 J
W
J m
Mo
Z
DRAWING NO:
CV -01
SHEET N0:
1 OF 5
Ln
Ln
0
M
00
Ln
00
Q
0
z
z
w
00
rl
x
0
Co
0
REGISTEREDSTA
T
E
OFWASHINGTONPROFESSIONALLANDS
UR
V
EYOR
4672066,9063935453756,9061,509 SF1,060
EX 12" SD TO REMAIN
10 LF 12 SD 02.0%
I
SDCB 2088
I SOLID LID
RIM 351.16
IE W 12"CPP 344.3
IE S 12"CPP 344.3
510 I ------ -�
SEC. 29, Tl 7N., R2E.) W. M.
46 LF 12" PERF
NEW TYPE 1 CB 159 LF 12 SD 0 1.2% EX STORM PIPE NEW TYPE 1 CB PIPE 0 0.0%
RIM=350.30 TO BE REMOVED RIM=350.27 IE=345.60
IE=344.57 IE=346.47
CONNECT ROOF DRAIN INFILTRATION GALLERY
,
r
' / I
1132 ti
351.00
RIM 348.72
\
IE
W 12"CPP
344.4
1.0%
IE
E 12"CPP
as, as
as
as as
Lu
O
'43 0
N74lool
cn
07
I
/
-t -
-�
351.00 I
I
Q i 351.00
%
/ 351.0q
( - /
/ 350138
U)
o
I
/
_
I
,
0
=
I
P_
51.00
° I�
�-1
"ACO" TRENCH DRAIN
350.38-
I
I
C�
CONNECTED TO
2cou�
GELINE
1
TYPE -1 CB WITH 6SD 0 2.0% MIN
50.35 350.35 350.751\ rl 7 a _ a
6I
II I
STORM PIPE UNDER
BUILDING TO BE REMOVED
CB TYPE 1
RIM=349.80
IE=345.70 /
CONNECT ROOF DRAIN I
SDCB 2130 - 2.0%
RIM 349.88 350.26
IE W 12"CPP 345.6
J
349.80
IE E 12 -CPP 345.5 I I I
IE S 12"CPP 345.5 / I I il I _
0
SII /
- 350.
EX 12" SD TO REMAIN
° STORM PIPE UNDER
BUILDING TO r'REMOVED
351.00 AND CONNEC D FPR
IV, ROOF DRAIN
70
RD -IF - 1RD `
350.80
SDCB 2274
RIM 349.32
IE E 12"CPP 346.5
0
0
C)
w
cD
Of0
V)
N
m
J
W
}
O
O
V)
ZDZD
0
M
•- O
Q' N
E N
� U
O
EcD
nz
NF --
_j
LN
N Z
0
U
ku ku
i
4X40 X4 DEEP
I, W/4" PERF 12" PERF PIPE
STORMATER TREATMENT
AQUA -SWIRL AS -2
RIM=350.25
IE=345.60
TREATS 4,018 SF
ASPHALT AREA
-a a a- a
i
351.00
o
�s, w
� Z _
J \
\ I
D
351.00/ 0 35109 I } 00 351.00
RIDGELINE I
I I / -/7S D/C /B 1 3
I I I RIM 350.64
I I 1 IE W 6"PVC 347.5
350.50 I 35 150 I
I i 1 IE E 6"PVC 347.5
1 -4
F. -.
J - -
STORM PIPE UNDER '
BUILDING TO BE REMOVED '
---1���----. ----- r- --- -'
I
I I
I I
EX CB TO BE
REMOVED
D
SDCB 1306
RIM 349.90
IE N 12 -CPP 346.1
FF -351.00
1 '
I I
351.00
PSE NATURAL
GAS CONNECTION
EX CB TO BE
REMOVED
SDCB 1229
RIM 349.94 -D
IE S 12"CPP 347.2
STORM PIPE UNDER
BUILDING TO BE REMOVED
6" ROOF DRAIN SYSTEM / AND CAPPED 66' NORTH
TO BE COORDINATED WITH ( OF EX CB
DOWNSPOUT LOCATIONS ON
NEW TYPE 1 CB
SDCB
1132 ti
RIM=350.18
IE=345.68
RIM 348.72
\
IE
W 12"CPP
344.4
CD
IE
E 12"CPP
344.4
I
/�
Lu
O
N74lool
cn
07
O
0
-t -
-�
W
30.50
Lo
/ 350138
U)
o
I
/
_
Q
,
0
=
I
P_
0
�-1
C
350.38-
uj
C�
-I�
�.350
2cou�
0
1
z
P-
�
>�
Q
0
1
w
N
c�
0
35 .50 350 70
--
°
I
w
J
Lu
Lu
i. Q:• . - ..
.. . . Dc
351.00 351.20
d
(I
351.00 351.35
WEST SIDE OF BLDG. '
.D RC RD Pn -ons �rS pv -R[)- -RD
CREEK ST SE
3.20,L9. I ON
PLAN VIEW:
1" = 20' HORIZ.
SDCB 2308
RIM 350.82
IE S 12"DI 348.4
351.70 `L 350.30
f 2-07 -
I I
351.00
-GAS-GAS GAS- '
qI D D
i• I - -
r.
2.0%
1352.50
.I_•. Y 1
- � �
\ N °
II
I
II
1
EX CB TO REMAIN
0' 20' 40'
EX 12" SD TO REMAIN
SCALE 1" = 20'
HORIZONAL DATUM:
HORIZONTAL - WASHINGTON STATE PLANE
COORDINATES, SOUTH ZONE, NAD 83/2011 BASED ON
GPS TIES TO MONUMENTS USING WASHINGTON STATE
REFERENCE NETWORK.
N 1'57'03" E ON WEST LINE OF SECTION 29.
VERTICAL DATUM:
VERTICAL - NAVD 88 BASED ON GPS TIES TO
MONUMENTS USING WASHINGTON STATE REFERENCE
NETWORK.
SDCB 1026
RIM 350.68
I IE N 12"CPP 347.1
IE W 12"CPP 347.2
IE E 12"CPP 347.1
EX CB TO REMAIN
N. PIPE USED FOR ROOF
DRAIN CONNECTION
EX 12" SD TO REMAIN
SDCB 1571
RIM 352.06
IE N 12"DI 348.3
IE E 12"CPP 348.2
EX CB/P� REMAIN
-l000
ENTITLEMENT PLANS:
THESE PLANS AREA INTENDED FOR THE CITY OF YELM LAND USE
ENTITLEMENT PROCESS. INFORMATION CONTAINED IS INTENDED TO
DEMONSTRATE THE FEASIBILITY OF THIS PROJECT AND THAT IT MEETS
THE CITY'S REQUIREMENTS. A SEPARATE SET OF CONSTRUCTION
DOCUMENTS WILL BE SUBMITTED FOR CONSTRUCTION APPROVAL THAT
WILL INCLUDE ALL NECESSARY CONSTRUCTION DETAILS, CITY STANDARD
NOTES AND DETAILS REQUIRED FOR CONSTRUC77ON APPROVAL.
m
N
0
N
ui
Q cn
0
w
w
Z
w
J
U
w
CL
co
0 0
c N
Lu w
a
*pp�
f'C7 F OF WASy,G�'j�
� c
�P 0 o
o �
�F42010
GISTE
SSI O N A L
N
Lu
CD
��
O
Q
/�
Lu
O
N74lool
cn
07
O
0
I
>
II
Lo
N
U)
o
0
II
I
II
1
EX CB TO REMAIN
0' 20' 40'
EX 12" SD TO REMAIN
SCALE 1" = 20'
HORIZONAL DATUM:
HORIZONTAL - WASHINGTON STATE PLANE
COORDINATES, SOUTH ZONE, NAD 83/2011 BASED ON
GPS TIES TO MONUMENTS USING WASHINGTON STATE
REFERENCE NETWORK.
N 1'57'03" E ON WEST LINE OF SECTION 29.
VERTICAL DATUM:
VERTICAL - NAVD 88 BASED ON GPS TIES TO
MONUMENTS USING WASHINGTON STATE REFERENCE
NETWORK.
SDCB 1026
RIM 350.68
I IE N 12"CPP 347.1
IE W 12"CPP 347.2
IE E 12"CPP 347.1
EX CB TO REMAIN
N. PIPE USED FOR ROOF
DRAIN CONNECTION
EX 12" SD TO REMAIN
SDCB 1571
RIM 352.06
IE N 12"DI 348.3
IE E 12"CPP 348.2
EX CB/P� REMAIN
-l000
ENTITLEMENT PLANS:
THESE PLANS AREA INTENDED FOR THE CITY OF YELM LAND USE
ENTITLEMENT PROCESS. INFORMATION CONTAINED IS INTENDED TO
DEMONSTRATE THE FEASIBILITY OF THIS PROJECT AND THAT IT MEETS
THE CITY'S REQUIREMENTS. A SEPARATE SET OF CONSTRUCTION
DOCUMENTS WILL BE SUBMITTED FOR CONSTRUCTION APPROVAL THAT
WILL INCLUDE ALL NECESSARY CONSTRUCTION DETAILS, CITY STANDARD
NOTES AND DETAILS REQUIRED FOR CONSTRUC77ON APPROVAL.
m
N
0
N
ui
Q cn
0
w
w
Z
w
J
U
w
CL
co
0 0
c N
Lu w
a
*pp�
f'C7 F OF WASy,G�'j�
� c
�P 0 o
o �
�F42010
GISTE
SSI O N A L
Z
EJB]
DRAWING NO:
SD -01
SHEET N0:
4 of 5
Ln
r -I
r -I
Ln
O
m
00
Ln
00
Q
z
z
LLI
00
rl
x
O
m
O
n
N
Lu
CD
O
Q
N
Lu
O
cn
07
O
0
I
>
II
Lo
N
U)
o
0
_
Q
n
J
=
0
=
C
F_
uj
C�
�
2cou�
0
z
P-
�
>�
Q
0
4
w
N
c�
0
N
�
�
w
J
Lu
Lu
L�LI
0-
0
m
m
J
CJ
Z
Z
Q
co
J
DLL
Z
EJB]
DRAWING NO:
SD -01
SHEET N0:
4 of 5
Ln
r -I
r -I
Ln
O
m
00
Ln
00
Q
z
z
LLI
00
rl
x
O
m
O
n
Lu
Q
J
Lu
O
UJ
07
O
0
>
rn
Lo
�
U)
LLQQNo
Q
C)
J
=
=
-
F_
uj
C�
�
2cou�
z
P-
�
>�
Q
>_"_J�
4
w
N
c�
0
co
w
J
Lu
J
00
0-
0
Z
EJB]
DRAWING NO:
SD -01
SHEET N0:
4 of 5
Ln
r -I
r -I
Ln
O
m
00
Ln
00
Q
z
z
LLI
00
rl
x
O
m
O
n
4° 45' WM BEND
4" 45' WM BEND
EX WATER MAIN
TO REMAIN
4" 90' BEND
NEW 4" LIVE TAP
FOR FIRE SUPPLY
NEW 4" FDC FIRE
LINE FOR STORAGE
CENTER
NEW 4° FDC FIRE
LINE FOR APARTMENT
REMOVE AND CAP EX
FIRE HYD CONNECTION I
INSTALL RELOCATED
FDC FOR APARTMENT
INSTALL NEW FDC
FOR STORAGE CENTER
INSTALL RELOCATED
FIRE HYDRANT
r
0
0
i
w
c�
Of
0
V)
N
J
W
}
O
O
V)
ZDZD
0
M
•� O
.E
� U
O
;_
i
aZ
F --
Lo (n
--oN
N Z
0
U
CONNECT NEW FDC FIRE
I" '%'19. LINE FOR APARTMENT
3
I
3 -
3
3
3
3117
.p
3
� 3
f3 CONNECT 4" FIRE DEPARTMENT
CONNECTION SUPPLY LINE
w w 0. 3 CONNECT 4" FIRE SPRINKLER
3 I 9 SUPPLY LINE.
660
3 EX WATER METER SETTER
3 ° TO REMAIN. PROTECT,
INSTALL NEW METER BOX
FOR INSTALLATION IN
3 CONCRETE SIDEWALK
a
3 I REMOVE EX FIRE SYSTEM
°O PIPING FOR APARTMENT
x I
3 ° RELOCATE EX FDC AND
FIRE PIPING FOR
�. APARTMENT
—w—j-
EX FIRE HYDRANT
TO BE RELOCATED
® INSTALL IRRIGATION WATER
V. METER, SETTER AND DDCV
BACKFLOW PROTECTION
° °
FIRE SPRINKLER SYSTEM
DOUBLE CHECK VALVE TO BE
LOCATED INSIDE RISER ROOM
SEC. 29, T17N., R2E., W.M.
S S S S
REMOVE AND RELOCATE 2" EX 2" SS STEP MAIN
STEP MAIN END OF LINE TO BE REMOVED
CLEANOUT
CREEK ST SE
0
INSTALL 6" SIDE SEWER PIPE
AND CLEAN OUT
INSTALL 6" GRAVITY SIDE SEWER
AND CLEAN OUT
INSTALL 3,000 GALLON CONCRETE
STEP TANK AND DUPLEX PUMP SYSTEM
INSTALL STEP CONTROL PANEL
INSTALL STEP SERVICE -
CARSON BOX IN
LANDSCAPE AREA
S S S S S S
S S S S
3S0,L9. L0N
PLAN VIEW:
1" = 20' HORIZ.
REINSTALL 2" STEP SEWER
END OF LINE CLEAN
INSTALL 1" STEP SERVICE
CONNECTION TO 2" MAIN
i W Wim- W W EX WM W W
EX STEP SEWER MAIN
S S S S S S S
N
N
0' 20' 40'
Q
J`
3I
EX 8" WATER MAIN
�
w
W
4::L
TO REMAIN
0)
o
[7-77-
SCALE 1" = 20'
LL
Q
Q
Lo
cn
=
N
�
co
0
0
a:
®
EX WATER METER AND
p
<
f
cp
3
SETTER TO BE REMOVED
jLO
Q
D CAPPED
C�
p�COw
�J
HORIZONAL DATUM:
EX APARTMENT
J
w
m
FDC FIRE LINE TO HORIZONTAL - WASHINGTON STATE PLANE
,?
3
REMAIN COORDINATES, SOUTH ZONE, NAD 83/2011 BASED ON
GPS TIES TO MONUMENTS USING WASHINGTON STATE
w
�!
INSTALL RELOCATED WATER REFERENCE NETWORK.
METER, SETTER AND RPBA N 1'57'03° E ON WEST LINE OF SECTION 29.
w
3
BACKFLOW PROTECTION
CL
VERTICAL DATUM:
z
c/)
Z
0
EX 2 STEP MAIN TO
W
w
REMAIN VERTICAL - NAVD 88 BASED ON GPS TIES TOOf
MONUMENTS USING WASHINGTON STATE REFERENCE
a
NETWORK.
N
�cVWARD
LLJ
N(n
�� OF WAS/-/ j2Gf0
— oo _
04�,
vS Q c� S
o
w x
Z z
3 EX STEP TEE ANDo
42010N40
�FGISTE
SSI
S
GATE VALVE TO
0 N A L
REMAIN
3
�
o
3
—
0
N
0
0
II
\
N
I
oM
o
3 I
o
0 0
cn
-ro
EX FDC FOR
o
N
3
APARTMENTSw
w
m
co
W
CJ
Z
3 N
I I
EX FIRE
HYDRANT
o
o
u-
® 3 N 1
3
— w w w w�--
— S S S S S S
S c
ENTITLEMENT PLANS:
THESE PLANS AREA INTENDED FOR THE CITY OF YELM LAND USE
ENTITLEMENT PROCESS. INFORMATION CONTAINED IS INTENDED TO
DEMONSTRATE THE FEASIBILITY OF THIS PROJECT AND THAT IT MEETS
THE CITY'S REQUIREMENTS. A SEPARATE SET OF CONSTRUCTION
DOCUMENTS WILL BE SUBMITTED FOR CONSTRUCTION APPROVAL THAT
WILL INCLUDE ALL NECESSARY CONSTRUCTION DETAILS, CITY STANDARD
NOTES AND DETAILS REQUIRED FOR CONSTRUCTION APPROVAL.
z
Q
J`
�wt'
�
w
W
00o
0)
o
w
u:)
LL
Q
Q
Lo
cn
=
�
co
0
0
a:
-6
p
<
f
cp
Of
�
)
jLO
Q
C�
p�COw
�J
J
m
M,
Z
EJB]
DRAWING NO:
UT -01
SHEET NO:
5 OF 5
Ln
r -I
r -I
Ln
O
m
m
00
Ln
00
m
Q
z
z
W
00
rl
x
0
rn0
d