Loading...
2021.0330.PR0010 WRF Site Plan�i -CST `�, El NFNDILIINNG SOLIDS HANDLING BLDG _CONTROL BLDG , (SCHEDULE B), M vz� �y 3EE 3HEET II 8 f0 4 C190D I I � MAINTENANCE BLDG r SEPTAGE CONTROL VALVE VAULT (SCHEDULE B), SEE SHEET C1900 El F� SLUDGE STORAGE TANKS PLANT DRAIN PUMP STATION o U o CIP DRAIN MANHOLE 'F— SLUDGE PSCHECKVALVE VAULT --- - J CENTRIFUGE FEED PUMP STATION __-____-___ (SCHEDULE B), SEE SHEET C1900 ��. PLANT DRAIN PS VALVE VAULT --- r RAS DISTRIBUTION STRI i_----_--__---------_I V 2 OFF SPEC DRAIN SUMP •.� —_ -------- --------------_I -_ NEVISON5 RATE CHECKED 0. KOPCHYNSKI APPRDJED MBR CHANNEL ^ r\ RECLAIMED \j WATER STORAGE TANK CIP BLDG A GEN SET, SEE SHEET 5472 I I PSE TRANSFORMER MECH/ELEC BLDG ------------ MBR1 i.... FUTURE PSE TRANSFORMER f MECH ELEC `\ MBRTANKS ROOM ROOM __ J] / I MAINTENANCE BLDG r SEPTAGE CONTROL VALVE VAULT (SCHEDULE B), SEE SHEET C1900 El F� SLUDGE STORAGE TANKS PLANT DRAIN PUMP STATION o U o CIP DRAIN MANHOLE 'F— SLUDGE PSCHECKVALVE VAULT --- - J CENTRIFUGE FEED PUMP STATION __-____-___ (SCHEDULE B), SEE SHEET C1900 ��. PLANT DRAIN PS VALVE VAULT --- r RAS DISTRIBUTION STRI i_----_--__---------_I V 2 OFF SPEC DRAIN SUMP •.� —_ -------- --------------_I -_ NEVISON5 RATE CHECKED 0. KOPCHYNSKI APPRDJED MBR CHANNEL ^ r\ RECLAIMED \j WATER STORAGE TANK CIP BLDG A GEN SET, SEE SHEET 5472 I I PSE TRANSFORMER MBR 2 ANOXIC 1 AERATION 1 OFFSPEC WAS PUMP STATION EFFLUENT STORAGE FEED FORWARD PUMP STATION ANOXIC 11 AERAT10N2 PLAN SCALE IN FEET 0 30 SD � MBRCHANNEL SBR 3 BASIN HEADWORKS ■a '\ BLOWERBLDGAND CI AERATION BLOWERS \ o A \ - RECLAIMED WATER PS Cl CHLORINE \ CONTACT TANKS \\` CHEMICAL BLDG Parametrix ENGINEERING. PL NING. ENVIPGNMENTALKIENCM 101939TH AVENUE $C SURE IW I IWAIWP, WA 99374 P W.W0. W W W.PNUMmlxCOM NOTES 1. THE BASE MAP FOR THIS PROJECT WAS CREATED FROM FIELD SURVEYAS DESCRIBED ON SHEET CDD2 AND FACILITY RECORD DRAWINGS. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS. OBOLLARD, SEE DETAIL 3, SHEET 0012. O3 REMOVABLE BOLLARD, SEE DETAIL 2, SHEET C012. 90% REVIEW SUBMITTAL NOT FOR CONSTRUCTION PROJECT NAME RRA.RD N. CITY OF YELM 75 OF 252 YELM WATER RECLAMATION FACILITY PHASE 2 OVERALL SITE PLAN UPGRADES C003 YELM, WASHINGTON MECH/ELEC BLDG MBR1 i.... FUTURE PSE TRANSFORMER MECH ELEC `\ MBRTANKS ROOM ROOM __ J] MBR 2 ANOXIC 1 AERATION 1 OFFSPEC WAS PUMP STATION EFFLUENT STORAGE FEED FORWARD PUMP STATION ANOXIC 11 AERAT10N2 PLAN SCALE IN FEET 0 30 SD � MBRCHANNEL SBR 3 BASIN HEADWORKS ■a '\ BLOWERBLDGAND CI AERATION BLOWERS \ o A \ - RECLAIMED WATER PS Cl CHLORINE \ CONTACT TANKS \\` CHEMICAL BLDG Parametrix ENGINEERING. PL NING. ENVIPGNMENTALKIENCM 101939TH AVENUE $C SURE IW I IWAIWP, WA 99374 P W.W0. W W W.PNUMmlxCOM NOTES 1. THE BASE MAP FOR THIS PROJECT WAS CREATED FROM FIELD SURVEYAS DESCRIBED ON SHEET CDD2 AND FACILITY RECORD DRAWINGS. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS. OBOLLARD, SEE DETAIL 3, SHEET 0012. O3 REMOVABLE BOLLARD, SEE DETAIL 2, SHEET C012. 90% REVIEW SUBMITTAL NOT FOR CONSTRUCTION PROJECT NAME RRA.RD N. CITY OF YELM 75 OF 252 YELM WATER RECLAMATION FACILITY PHASE 2 OVERALL SITE PLAN UPGRADES C003 YELM, WASHINGTON