Loading...
HFT YelmWA WSEC ComplianceSummary_Mech (2)8/18/2021 https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PW1lY19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWx0ZXJhdGlvbiZ0ZnY9bWVjX2h2YWNfc3lz… https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PW1lY19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWx0ZXJhdGlvbiZ0ZnY9bWVjX2h2YWNfc3lzX3pvbmluZ1…1/2 Administered by: ©2021 NEEA, All rights reserved Date: Aug 18, 2021 MECHANICAL COMPLIANCE SUMMARY 2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Project & Applicant Information Project Title Harbor Freight Tools - 2018 WSEC For Building Department Use: Project Address 906 East Yelm Avenue Yelm, WA 98597 Applicant Name Derek Kissinger Applicant Phone 440-230-1800 Applicant Email dkissinger@pointonedesign.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Retail, General Sales Building Cond. Floor Area 13,946 General Project Types Building Addition Alteration New Building or Addition Mechanical Scope Alteration Mechanical Scope Single Zone Systems & Equipment Project Cond. Floor Area 13,946 Floors Above Grade 1 Compliance Method Compliance Method 1 - General Mechanical Project Description Alteration of an existing retail space. Mechanical Compliance Scope and Method Project Type Mechanical Scope Economizer Exception(s) Applied? DOAS Ventilation Provided? Higher Equipment Efficiency Option Applied? Equipment Efficiency Compliance Verification Alteration Single Zone Systems & Equipment Yes No NA COMPLIES Additional Efficiency Credits Included (AEC) Does building include occupancy classifications requiring DOAS?Yes Does project include DOAS equipment?No Based on project scope do TSPR requirements apply?Yes Do all systems comply with Appendix D standard reference design or qualify for an exception to TSPR?Yes Scope & Space Conditioning ALTERATION - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES Single Zone Air Systems Category - Air conditioner, unitary, thru-wall, SDHV Air Systems Summary Information System/Equip ID Quantity of Items Supply Airflow Control Ventilation Standard Ventilation CFM (Total if Multiple Items) Ventilation Air Source Paired with DOAS Ventilation energy recovery Energy Recovery Efficiency (%) RTU-01 Thru RTU-03 Constant volume IMC Ventilation 4,400 Integral Not provided, not required Air Systems & Equipment - Cooling System/ Equip ID Cooling System/Equip Type Specific Type Cooling Capacity per item (Btu/h) AEC Efficiency Multiplier Econo Exception Multiplier (FL & PL) Combined Efficiency Multiplier (AEC & Econo) Proposed Cooling Efficiency CE Units Proposed Part Load Efficiency PL Units Efficiency Compliance Verification RTU-01 Thru RTU- 03 Air conditioner, evap cooled Single package DX 154,800 1 0 1 12.0 EER 13.5 IEER COMPLIES Air Systems & Equipment - Heating System /Equip ID Heating System/Equip Type Specific Type Heating Capacity HC Units Proposed Heating Efficiency HE Units Efficiency Compliance Verification RTU-01 Thru RTU-03 Furnace Warm air, gas fired (AFUE)240,000 Btu/h 80.0 COMPLIES Air Systems & Equipment Details System/Equip ID Area(s) Served Location In Project Documents - Plan/Detail # RTU-01 Thru RTU-03 Sales, Sales Replenishment & Receiving M1.0 Heating Section/Auxiliary Heating Type: Furnace Economizer Compliance Method: Air-side economizer provided WSEC Equip Efficiency Reference Table - Cooling: Table C403.3.2(1)A - Unitary Air Conditioners & Condensing Units 8/18/2021 https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PW1lY19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWx0ZXJhdGlvbiZ0ZnY9bWVjX2h2YWNfc3lz… https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3B0PW1lY19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWx0ZXJhdGlvbiZ0ZnY9bWVjX2h2YWNfc3lzX3pvbmluZ1…2/2 WSEC Equip Efficiency Reference Table - Heating: Table C403.3.2(4) Warm Air Furnaces