Loading...
Tahoma Golf Course Civil Permit Comment Response_01ANNEX DESIGN SERVICES, LLC PO Box 455 Bellevue, WA 98009-0455 425.471.6401 INFO@ANNEX-DESIGN.COM Architectural Design, Drafting, Cost Estimating, Pe rmit Submittals, Sustainable Design Consulting Page 1111 of 2222 City of Yelm Public Services Department – Engineering Derek M. McCoy, PE Civil Review Engineer 901 Rhoton Road Yelm, WA 98597 September 22nd, 2021 Application #: 2021.0419.CI0014 Project: Tahoma Golf Course & Country Club Project Address: 15425 Mosman Ave SW Attached are the revised plans per your plan review comments. Below is an itemized list of responses and their locations. Please let me know if there is anything else that you require. Thank you for your attention. Sincerely, Jeff Reuter Annex Design Services, LLC PO Box 455 Bellevue, WA 98009 425.471.6401 Plan Review Comments Responses: (Responses in red) Planning (Land Use): (Ref – Notice of Decision dated 6/08/2021 and Yelm Municipal Code) 1. Show detail of fuel tank storage enclosure in compliance with Section 18.51.050 YMC See Architectural set "TAHOMA GOLF COURSE & COUNTRY CLUB" permit set dated 8/6/21 submitted by Annex Design Services, LLC. See detail F/A102 & sheet S101 for details and calculations. Sanitary Sewer & Water Plan: (Ref - Development Guidelines Chapter 4 & 5) 2. Show location of sewer service box (Carson Box). Refer to Yelm Std Dwg 5-1 and include into the details sheet. DEA Response: The water service box is now shown on sheet C300. Standard detail 5-1 is now shown on sheet C401. ANNEX DESIGN SERVICES, LLC PO Box 455 Bellevue, WA 98009-0455 425.471.6401 INFO@ANNEX-DESIGN.COM Architectural Design, Drafting, Cost Estimating, Pe rmit Submittals, Sustainable Design Consulting Page 2222 of 2222 3. Show location of STEP control panel. Refer to the appropriate of Yelm Std Dwg 5-4, 5-5, 5-6. and include them into the details sheet. DEA Response: The STEP control panel is now shown on sheet C300. Standard details for the controller are shown on sheet C401. 4. Show location of building cleanout. Refer to Yelm Std Dwg 5-7 and include into the details sheet. Specify a Reduced Pressure Backflow Assembly installed at the domestic meter. Refer to Yelm Std Dwg 4-17 and include into the details sheet. DEA Response: The cleanout is now shown on sheet C300. Standard detail 5-7 is shown on sheet C401. 5. The concrete driveway access will be incorporated into the City of Yelm Mosman Phase II project currently anticipated to start Spring 2022. Will coordinate during construction what to be completed. DEA Response: A note was added to sheet C100 for the contractor the contractor to coordinate installation of the driveway approach Coordination of site work should be worked out with the General Contractor: DJR Construction - Dalton Rohr (253) 414-7523. drohr55@gmail.com. Landscape / Irrigation Plans: (Ref – Chapter 18.55 Landscaping Requirements) 6. Show perimeter landscape between containers & street, or enclosure all around similar to fuel tank DEA Response: Landscape plantings are now added between the container and the street as well as adjacent to the tank storage enclosure. 7. Include irrigation plan or note on landscape sheet talking about irrigation DEA Response: Watering notes are added into the general planting notes on sheet L100. See note 12 and 16. Misc. Information: 8. Provide a blank box for an approval block on the civil engineering plans on all sheets. Civil Review Engineer will affix digital approval stamp here. Markups contain a red box for suggested placement. (typical all sheets) DEA Response: A blank box is now provided on all sheets.