Tahoma Golf Course Civil Permit Comment Response_01ANNEX DESIGN SERVICES, LLC
PO Box 455
Bellevue, WA 98009-0455
425.471.6401
INFO@ANNEX-DESIGN.COM
Architectural Design, Drafting, Cost Estimating, Pe rmit Submittals, Sustainable Design Consulting
Page 1111 of 2222
City of Yelm Public Services Department – Engineering
Derek M. McCoy, PE
Civil Review Engineer
901 Rhoton Road
Yelm, WA 98597
September 22nd, 2021
Application #: 2021.0419.CI0014
Project: Tahoma Golf Course & Country Club
Project Address: 15425 Mosman Ave SW
Attached are the revised plans per your plan review comments. Below is an itemized list of responses and
their locations.
Please let me know if there is anything else that you require.
Thank you for your attention.
Sincerely,
Jeff Reuter
Annex Design Services, LLC
PO Box 455
Bellevue, WA 98009
425.471.6401
Plan Review Comments Responses: (Responses in red)
Planning (Land Use): (Ref – Notice of Decision dated 6/08/2021 and Yelm Municipal Code)
1. Show detail of fuel tank storage enclosure in compliance with Section 18.51.050 YMC
See Architectural set "TAHOMA GOLF COURSE & COUNTRY CLUB" permit set dated 8/6/21 submitted by
Annex Design Services, LLC. See detail F/A102 & sheet S101 for details and calculations.
Sanitary Sewer & Water Plan: (Ref - Development Guidelines Chapter 4 & 5)
2. Show location of sewer service box (Carson Box). Refer to Yelm Std Dwg 5-1 and include
into the details sheet.
DEA Response: The water service box is now shown on sheet C300. Standard detail 5-1 is now shown on
sheet C401.
ANNEX DESIGN SERVICES, LLC
PO Box 455
Bellevue, WA 98009-0455
425.471.6401
INFO@ANNEX-DESIGN.COM
Architectural Design, Drafting, Cost Estimating, Pe rmit Submittals, Sustainable Design Consulting
Page 2222 of 2222
3. Show location of STEP control panel. Refer to the appropriate of Yelm Std Dwg 5-4, 5-5, 5-6.
and include them into the details sheet.
DEA Response: The STEP control panel is now shown on sheet C300. Standard details for the controller
are shown on sheet C401.
4. Show location of building cleanout. Refer to Yelm Std Dwg 5-7 and include into the details
sheet. Specify a Reduced Pressure Backflow Assembly installed at the domestic meter. Refer
to Yelm Std Dwg 4-17 and include into the details sheet.
DEA Response: The cleanout is now shown on sheet C300. Standard detail 5-7 is shown on sheet C401.
5. The concrete driveway access will be incorporated into the City of Yelm Mosman Phase II
project currently anticipated to start Spring 2022. Will coordinate during construction what
to be completed.
DEA Response: A note was added to sheet C100 for the contractor the contractor to coordinate
installation of the driveway approach
Coordination of site work should be worked out with the General Contractor: DJR Construction - Dalton
Rohr (253) 414-7523. drohr55@gmail.com.
Landscape / Irrigation Plans: (Ref – Chapter 18.55 Landscaping Requirements)
6. Show perimeter landscape between containers & street, or enclosure all around similar to
fuel tank
DEA Response: Landscape plantings are now added between the container and the street as well as
adjacent to the tank storage enclosure.
7. Include irrigation plan or note on landscape sheet talking about irrigation
DEA Response: Watering notes are added into the general planting notes on sheet L100. See note 12 and
16.
Misc. Information:
8. Provide a blank box for an approval block on the civil engineering plans on all sheets. Civil
Review Engineer will affix digital approval stamp here. Markups contain a red box for
suggested placement. (typical all sheets)
DEA Response: A blank box is now provided on all sheets.