PL CV yelm schools. 7.8.09 (2)
City of Yelm
Community Development Department
105 Yelm Avenue West
P.O. Box 479
Yelm, WA 98597
Pre-Application Meeting
July 8, 2009
These comments are preliminary in nature and are not intended to represent final comments and or
requirements for the City of Yelm. Until a complete application is made, the Community Development
Department can only attempt to inform the applicant of general requirements as they appear in the form
presented by the applicant at the time of pre-submission.
Proponent: Yelm Community Schools
Project Proposal: Use existing facilities for bus storage and repair with offices and
rooms for training.
Project Location: 402, 404 & 406 Railroad Street NW
Tax parcel numbers 22719310300, 22719310200, 22719310301
Zoning and Setbacks
The property is zoned Industrial (I) and identified at Chapter 17.26 YMC. The Industrial
district is intended to provide for the development of areas in which certain types of
industrial activities may be located such as manufacture, assembly, repair, servicing of
goods or products
Storage and servicing of automotive equipment and accessory uses clearly subordinate
to, and an integral part of, the primary use of the property such as office spaces are
allowed uses in the (I) Industrial zone.
Minimum site requirements shall be as follows:
A. Lot area: 10,000 square feet
B. Lot width: 100 feet
C. Side yard setback: 15 feet unless the property abuts residentially zoned property,
in which case the side yard setback shall be 25 feet.
D. Rear yard setback: 15 feet unless the property abuts residentially zoned
property, in which case the rear yard setback shall be 25 feet.
E. Front yard setback: 15 feet.
The maximum building height is forty (40) feet. Maximum building allowance shall be
85 percent of site.
Pre-Application Meeting
Page 2 of 8
Critical Areas
All of Yelm is considered a critical aquifer recharge area. The City critical area maps
indicate that there are associated wetlands and flood zones located to the property is
located outside of wetlands, flood zones, and high ground water areas.
Yelm Creek is located along the north and northwest portion of the site and is a
Shoreline of the State. The Shoreline Jurisdiction area is 200’ from the ordinary high
water mark. There is a 150 foot setback from the ordinary high water mark for any
development. Any development over $2,500 in the shoreline jurisdiction area requires a
shoreline substantial permit.
The property contains wetlands associated with the creek. Wetlands must be
delineated and classified as part of the development application. There are ‘no-disturb’
buffers associated with wetlands, the depth of which are based on the wetland
classification and range from 50 feet to 300 feet.
A portion of the site also includes the 100 year floodplain as designated by the Federal
Emergency Management Agency (FEMA). Regulations prohibit any development to
occur within the 100 year floodplain. Additionally, impervious surfaces and storm
drainage facilities are not allowed in the 100 year floodplain.
SEPA
A SEPA Environmental checklist is required, and a Transportation Impact Analysis (TIA)
may be required at the time of application. The TIA will be used to identify traffic
impacts resulting from the project and Improvements necessary to address safety
issues.
Site Plan Review Process
A Site Plan Review application as established by Chapter 17.84 YMC is an
administrative review process. The minimum application requirements can be found at
Section 17.84.060 YMC and are listed on the application form. A notice of application is
mailed to all property owners within 300 feet of the site.
The site plan review committee’s decision on a site plan review application may be
appealed to the Hearing Examiner, who would hold an open record hearing on the
issue. The Examiner’s decision can be appealed to the City Council, which would hold
a closed record hearing and determine if the decision was supported by substantial
evidence or contrary to law. If a SEPA appeal is filed, the site plan review would be
combined with that appeal and the Hearing Examiner would become the decision maker
Pre-Application Meeting
Page 3 of 8
with a recommendation from the SPR Committee. An open record hearing would be
held by the examiner on the site plan review application, if combined with a SEPA
appeal.
A conceptual landscaping plan is required at the time of application for site plan review.
The final landscaping and irrigation plan is required as an element of civil plans, with
installation and approval prior to occupancy of the business.
Land use approval typically contains conditions of approval that the applicant must
complete prior to receiving a building permit. Upon satisfactory completion of all
conditions of land use approval, the applicant can submit building plans for approval.
Land Use Fees
Site Plan Review $350.00 + $50 per 1,000 sq ft per gross floor area
SEPA $150.00
Civil Plan Review Billed on a cost recovery basis
Traffic Impact Analysis $500.00 scoping fee, and actual cost for review
Traffic Impact Fee $1,321.00 per peak PM trip
Water Meter Fee Based on meter size
Building Plan Review Based on 1997 UBC fee Schedule
Building Permit Based on 1997 UBC fee Schedule
Sewer Connection Fee $6,050 per ERU or $3,009 if part of LID
Sewer Inspection Fee $145.00 per ERU
Water Connection Fee $1,500 per ERU
Fire Impact Fee $0.32 per square foot
Parking Lot Location and Design
The requirements for off-street parking and their design shall be regarded as the
minimum; however, the owner, developer, or operator of the premises for which the
parking facilities are intended shall be responsible for providing adequate amounts and
arrangement of space for the particular premises even though such space is in excess
of the minimum set forth.
Chapter 17.72 YMC requires professional offices to provide (1) one parking space for
every 300 square feet of gross floor area. Industrial uses require (1) one space per
employee, based on the greatest number of employees on a single shift, plus, (1) one
square foot of parking per square foot of display or retail area, plus, (1) one space for
each vehicle owned, leased or operated by the company.
Pre-Application Meeting
Page 4 of 8
A standard stall is 9 feet by 20 feet while a compact stall is 8 by 16. A loading space is
required and must accommodate a truck 45 feet in length, 12 feet in width, and 14 feet
tall.
All parking areas must be surfaced with asphalt or concrete, and shall be striped and
landscaped to the standards of the development guidelines.
The design details for parking lot construction can be found in the Yelm Development
Guidelines.
Landscaping Types and Description
The purpose of landscaping requirements is to preserve the aesthetic character of
communities; to promote retention and protection of existing vegetation; and to reduce
the impacts of development on drainage systems and natural habitats.
Type I landscaping is intended to provide a very dense sight barrier and physical
buffer to separate conflicting uses, and land use districts. Type I landscaping is
required along the northeastern property line, where the zoning is residential.
Type I landscaping is characterized by a 15 foot landscape strip in which any
combination of trees, shrubs, fences, walls, earthen berms, and design features
provides an effect which is sight-obscuring from adjoining properties.
Type II landscaping is intended to provide visual separation of uses from streets, and
visual separation of compatible uses so as to soften the appearance of streets, parking
areas and building elevation. It is used around the perimeter of a site with a minimum
planting area of eight-feet in width. When used adjacent to a building, a minimum five-
foot planting area shall be provided.
Type II landscaping will be required around the perimeter of the site with the exception
of the portion that is located in the flood zone areas.
Type IV landscaping is intended to provide visual relief and shade in parking areas.
Parking shall have at least 24 square feet of landscape development for each parking
stall proposed. Each area of landscaping must contain at least 100 square feet of area
and must be at least six feet in any direction.
Type V landscaping is to provide visual relief in storm water retention/detention areas
with vegetation that is suitable and will thrive in hydric soils.
Pre-Application Meeting
Page 5 of 8
Refuse
The refuse area must be large enough to accommodate a dumpster and recycle bin.
Refuse areas must be screened with an enclosure of a material and design compatible
with the overall architectural theme. A six foot wall or fence shall enclose any outdoor
refuse collection point. The fence shall be a solid material such as wood or masonry.
Transportation
Ingress and egress at the site shall be consistent with the Yelm Development
Guidelines, Section 4B.140. Existing access vehicular access into the site may need to
be reviewed.
The Traffic Impact Analysis, if required as part of the environmental review will indicate
the impacts that the development will have on the transportation system and suggest
mitigation measures that may be required.
Frontage improvements are required for all new development within the city. Frontage
requirements include improvements to the roadway from the centerline of right-of-way
back towards your property. Frontage improvements on Stevens Street have already
been completed.
A Traffic Impact Analysis may be required. This analysis may trigger additional off-site
improvements to mitigate traffic impacts associated with the proposal.
The City of Yelm has adopted a Transportation Facility Charge (TFC) of $1,321.00 per
PM peak trip generated by new development. The code provides a default table that the
applicant can use to determine the number of new PM trips generated by a proposal.
The TFC charges are based on the type of use proposed. Each use may be
significantly different. For example, the traffic generated from a fast food restaurant is
much greater than a “sit-down” restaurant. Retail sales are also determined by different
factors. Credit shall be given for the existing traffic generated from the site.
It appears that the PM Peak trips for a school bus barn would be the same or less than
the previous industrial use. If that is the case then Traffic Facility charges would not
apply. The City may need additional information from the applicant regarding specific
trip generation for further analysis at the time of application.
Traffic Facilities Charges may be applied to off-site improvements required to mitigate
potential significant impacts attributed to the proposed development if the required
improvements are capacity related.
Pre-Application Meeting
Page 6 of 8
Water
The proposed project is located in the City of Yelm’s water service area, and is currently
connected to City water service.
Water connections are based on a consumption rate of 900 cubic feet a month and are
charged at a rate of $1,500 per a connection (fee subject to change) inside city limits.
The fees will be calculated utilizing the water consumption calculations provided by your
civil engineer. These fees are payable at building permit issuance.
An irrigation meter shall be installed and an approved backflow prevention device
provided. As sewer use fees are calculated based on water usage, an irrigation meter
will lower monthly sewer bills.
Any existing well(s) will need to be abandoned per Department of Ecology standards
and the water rights will need to be dedicated to the city.
All commercial buildings and irrigation systems are required to provide for cross-
connection control through the provisions of a back flow prevention device installed on
the water services. A list of approved devices can be found at Chapter 246-290-490
WAC.
Sewer
The proposed site is currently located in the City of Yelm’s STEP sewer system service
area, and the proposed site is currently connected to the City of Yelm’s STEP sewer
system.
It is unclear at this time whether the existing STEP tank’s size and location is adequate
for this expansion.
Any on-site septic systems will need to be abandoned prior to site plan review approval.
If additional connections are required, sewer connections are based on a consumption
rate of 900 cubic feet a month and are charged at a rate of $6,050.00 per a connection
(fee subject to change) inside city limits. An inspection fee of $145.00 per a connection
will also be required.
Fire Protection
All projects need to have fire protection for the buildings. It is likely that fire flow may be
an issue at this location, which will be addressed through building official review of the
proposed building uses and construction material used for the buildings.
Pre-Application Meeting
Page 7 of 8
The International Building Code (IBC) provides occupancy ratings for different types of
uses. The fire coverage and sprinkler system for the proposed use must meet IBC
requirements.
Fire Impact Fee pursuant to Section 15.40.020 (B)(6) YMC is established at a rate of
$0.32 per square foot of development for all new development in the City of Yelm.
Stormwater
Developments with additional impervious surface are required to provide stormwater
facilities pursuant to the 1992 DOE Stormwater Manual. Stormwater treatment for all
impervious surfaces, such as internal and frontage streets is to be treated on site.
The size and design would be reviewed as part of the site plan review and further
review at civil plan submittal. An operations and maintenance agreement will be
required.
ADA Requirements
The American Disabilities Act required that facilities are ADA accessible. Facility
improvements will have to meet current code. Review of these improvements will be
determined upon further review of the civil and architectural plans.
Civil Plan Review Process
Civil Plan review generally takes place after a land use approval. The Yelm
Development Guidelines contain standard details for all infrastructure requirements,
including parking lot layout, sewer and water lines, STEP tank design, and stormwater
control.
Building Permit Process
Building Plan review, permitting and inspections will be based on Title 15 Yelm
Municipal Code, adopting the 2006 IBC, IMC, UPC, IFC and the 2006 Washington State
Energy Code. By resolution, the City of Yelm re-adopted the 1997 UBC, UMC and UPC
Fee schedules.
Building Plans may be submitted after Site Plan Review approval. Five(5) sets of plans,
one of which may be half scale, two (2) sets of engineering calculations, energy
calculations and specifications will be required. Due to the size of the occupancy, an
integrated sprinkler and fire alarm system will be required. These plans may be
submitted at a later date along with any required kitchen suppression systems. All fire
related items 5’ outside the building will be subject to civil review along with domestic
water, waste, and storm water.
Pre-Application Meeting
Page 8 of 8
Concurrently with Site Plan Review two sets of building and accessory building
elevations must be submitted for review of the building for consistency with the Design
Guidelines.
Allow at least 8 to 12 weeks for Building Plan Review and 2 weeks for design guideline
review.