Pre-Application Meeting
July 8, 2009
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Jim Coran
Project Proposal: Additional tenant consisting of a 99 cent retail store as part of an existing business.
Project Location: 1506 Yelm Avenue W.
Tax parcel numbers 21713340405 & 21713340406
Zoning and Setbacks
The property is zoned Commercial (C-1) which is codified at Chapter 17.26 YMC. The (C-1) district allows for the location of business centers to serve the needs of the community for
convenience goods and services such as food, drugs, household supplies, automobile servicing, recreation, entertainment and other uses related to, but lesser in scope, than downtown
core area uses.
Retail establishments are an allowed use in the (C-1) Commercial zone.
Building setbacks are 15 feet from the front, 20 feet from the rear and 10 feet from the side property lines
The maximum building height is forty (40) feet.
Critical Areas
All of Yelm is considered a critical aquifer recharge area. The City critical area maps indicate that the property is located outside of wetlands, flood zones, and high ground water
areas.
Site Plan Review Process
Site plan review and approval shall be required prior to the use of land or building for the location of any commercial, industrial or public building or activity, including environmental
checklist review, and for the location of any building in which more than two dwelling units would be contained.
Exemptions from site plan review and approval shall be granted by the site plan review committee if:
1. There is no addition of square feet or no additional tenant, or the expansion is for storage only (future conversion of storage area would require compliance with this chapter);
2. The proposed use is similar as classified by the Standard Industrial Code Classification Manual;
3. The building has been occupied within the previous 18 months.
A Site Plan Review application as established by Chapter 17.84 YMC is an administrative review process. The minimum application requirements can be found at Section 17.84.060 YMC and
are listed on the application form. A notice of application is mailed to all property owners within 300 feet of the site.
The site plan review committee’s decision on a site plan review application may be appealed to the Hearing Examiner, who would hold an open record hearing on the issue. The Examiner’s
decision can be appealed to the City Council, which would hold a closed record hearing and determine if the decision was supported by substantial evidence or contrary to law. If a
SEPA appeal is filed, the site plan review would be combined with that appeal and the Hearing Examiner would become the decision maker with a recommendation from the SPR Committee.
An open record hearing would be held by the examiner on the site plan review application, if combined with a SEPA appeal.
A conceptual landscaping plan is required at the time of application for site plan review. The final landscaping and irrigation plan is required as an element of civil plans, with installation
and approval prior to occupancy of the business.
Land use approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions of
land use approval, the applicant can submit building plans for approval.
State Environmental Policy Act Process
A SEPA threshold determination will be not be required for this proposal.
The SEPA threshold determination is appealable to the Hearings Examiner, who would hold an open record hearing on the issue. The Examiner’s decision may be appealed to City Council,
which would conduct a closed record hearing and determine if the Examiner’s decision was contrary to law and supported by substantial evidence.
Land Use Fees
Site Plan Review $350.00 + $50 per 1,000 sq ft per gross floor area.
Traffic Impact Fee $1,321 .00 per peak PM trip
Water Meter Fee Based on meter size
Sewer Connection Fee $6,050 per ERU or $2,927 if part of LID
Sewer Inspection Fee $145.00 per ERU
Water Connection Fee $1,500 per ERU
Fire Impact Fee $0.32 per 1,000 square feet.
Parking Lot Location and Design
The requirements for off-street parking and their design shall be regarded as the minimum; however, the owner, developer, or operator of the premises for which the parking facilities
are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space is in excess of the minimum set forth.
Chapter 17.72 YMC requires retail establishments to provide for one (1) parking stall for every 250 square feet of GFA and (1) parking stall for every 200 square feet of GFA for restaurants.
Based on the proposed square footage for the structures on both parcels, approximately 17 parking spaces would be required. Currently, there are approximately 32 parking spaces with
an additional 2 which are handicap accessible.
A standard stall is 9 feet by 20 feet while a compact stall is 8 by 16. A loading space must accommodate a truck 45 feet in length, 12 feet in width, and 14 feet tall.
All parking areas must be surfaced with asphalt or concrete, and shall be striped and landscaped to the standards of the development guidelines.
The design details for parking lot construction can be found in the Yelm Development Guidelines.
Landscaping Types and Description
The purpose of landscaping requirements is to preserve the aesthetic character of communities; to promote retention and protection of existing vegetation; and to reduce the impacts of
development on drainage systems and natural habitats.
Type I landscaping is intended to provide a very dense sight barrier and physical buffer to significantly separate conflicting uses and land use districts. A minimum of 15 feet of width
shall be required when Type I landscaping design is utilized. Type I landscaping is required along the north and west property lines.
Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas and
building elevation. It is used around the perimeter of a site with a minimum planting area of eight-feet in width. When used adjacent to a building, a minimum five-foot planting area
shall be provided. Type II landscaping will be required around the perimeter of the site. Existing landscaping me be substituted for some landscape requirements.
Type IV landscaping is intended to provide visual relief and shade in parking areas. Parking shall have at least 24 square feet of landscape development for each parking stall proposed.
Each area of landscaping must contain at least 100 square feet of area and must be at least six feet in any direction.
Transportation
Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, Section 4B.140.
Frontage improvements are required for all new development within the city.
Frontage requirements include improvements to the roadway from the centerline of right-of-way back towards your property.
Frontage improvements on Yelm Avenue (SR 510) are currently complete.
The City of Yelm has adopted a Transportation Facility Charge (TFC) of $1,321.00 per PM peak trip generated by new development. The code provides a default table that the applicant can
use to determine the number of new PM trips generated by a proposal.
The TFC charges are based on the type of use proposed. Each use may be significantly different. For example, the traffic generated from a fast food restaurant is
much greater than a “sit-down” restaurant. Retail sales are also determined by different factors.
EXAMPLE: Gross Floor Area / 1,000 x $1,321.00=TFC
Miscellaneous Retail: 2.4 x 816 sq. ft.= 1,958 ÷1,000 = 1.9 x $1,321.00 = $2,587.00 to be paid prior to issuance of the City of Yelm Business License.
Traffic Facilities Charges may be applied to off-site improvements required to mitigate potential significant impacts attributed to the proposed development if the required improvements
are capacity related.
Water
The proposed project is located in the City of Yelm’s water service area and is currently connected to the City of Yelm’s water system. I
Water connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $1,500 per a connection (fee subject to change) inside city limits. The fees
will be calculated utilizing the water consumption calculations provided by your civil engineer. These fees are payable at building permit issuance.
An irrigation meter shall be installed and an approved backflow prevention device provided. As sewer use fees are calculated based on water usage, an irrigation meter will lower monthly
sewer bills.
Cross Connection Control:
Washington State Department of Heath, in WAC 246-490 states all group A water systems with 1000 or more connection are required by the department of health to develop and implement a
cross connection control program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device installed on the water services. A list
of approved devices can found at the above referenced Washington Administrative Code.
Any existing well(s) will need to be abandoned per Department of Ecology standards and the water rights will need to be dedicated to the city.
All commercial buildings and irrigation systems are required to provide for cross-connection control through the provisions of a back flow prevention device installed on the water services.
A list of approved devices can be found at Chapter 246-290-490 WAC.
Sewer
The proposed site is currently located in the City of Yelm’s STEP sewer system service area and is currently connected to the City of Yelm’s STEP sewer system service area.
This proposal will be required to install step tank(s) and associated equipment needed to operate with the City of Yelm’s step sewer system. This project will be required to install
a City of Yelm STEP sewer tank(s) assembly. The size of the STEP tank will be based on peak flows as calculated by the developer’s engineer, which must be submitted as part of the
civil plan review.
Any on-site septic systems will need to be abandoned prior to site plan review approval.
Commercial sewer connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $6,050.00 per a connection (fee subject to change) inside city limits.
An inspection fee of $145.00 per a connection will also be required.
Fire Protection
All projects need to have fire protection for the buildings. It is likely that fire flow may be an issue at this location, which will be addressed through building official review of
the proposed building uses and construction material used for the buildings.
The International Building Code (IBC) provides occupancy ratings for different types of uses. The fire coverage and sprinkler system for the proposed use must meet IBC requirements.
Fire Impact Fee pursuant to Section 15.40.020 (B)(6) YMC is established at a rate of $0.32 per square foot of development for all new development I the City of Yelm.
Stormwater
Developments with additional impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. Stormwater treatment for all impervious surfaces,
such as internal and frontage streets is to be treated on site.
The size and design would be reviewed as part of the site plan review. A preliminary stormwater plan is required as part of Site Plan Review application submittal, and final stormwater
plan review at civil plan submittal. An operations and maintenance agreement will be required.
ADA Requirements
The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon
further review of the civil and architectural plans.
Civil Plan Review Process
Civil Plan review generally takes place after a land use approval. The Yelm Development Guidelines contain standard details for all infrastructure requirements, including parking lot
layout, sewer and water lines, STEP tank design, and stormwater control.
Building Permit Process
Building Plan review, permitting and inspections will be based on Title 15 Yelm Municipal Code, adopting the 2003 IBC, IMC, UPC, IFC and the 2001 Washington State Energy Code. By resolution,
the City of Yelm re-adopted the 1997 UBC, UMC and UPC Fee schedules.
Building Plans may be submitted after Site Plan Review approval. Five(5) sets of plans, one of which may be half scale, two (2) sets of engineering calculations, energy calculations
and specifications will be required. Due to the size of the occupancy, an integrated sprinkler and fire alarm system will be required. These plans may be submitted at a later date
along with any required kitchen suppression systems. All fire related items 5’ outside the building will be subject to civil review along with domestic water, waste, and storm water.
Concurrently with Site Plan Review two sets of building and accessory building elevations must be submitted for review of the building for consistency with the Design Guidelines.
Allow at least 8 to 12 weeks for Building Plan Review and 2 weeks for design guideline review.