Copper Creek Lounge 11.18.09  City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597   Pre-Application Meeting November 18, 2009 These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Jim Coran Project Proposal: Convert Putt Putt Golf Office to Copper Creek Lounge. Project Location: 1506 Yelm Avenue W. Tax parcel numbers 21713340405 & 21713340406 Zoning and Setbacks The property is zoned Commercial (C-1) which is codified at Chapter 17.26 YMC. The (C-1) district allows for the location of business centers to serve the needs of the community for convenience goods and services such as food, drugs, household supplies, automobile servicing, recreation, entertainment and other uses related to, but lesser in scope, than downtown core area uses. Restaurants including cocktail lounges are an allowed use in the (C-1) Commercial zone. Building setbacks are 15 feet from the front, 20 feet from the rear and 10 feet from the side property lines The maximum building height is forty (40) feet. A copy of the history of the liquor license for the site is requried. Critical Areas All of Yelm is considered a critical aquifer recharge area. The City critical area maps indicate that the property is located outside of wetlands, flood zones, and high ground water areas. Site Plan Review Process Site plan review and approval shall be required prior to the use of land or building for the location of any commercial, industrial or public building or activity, including environmental checklist review, and for the location of any building in which more than two dwelling units would be contained. Exemptions from site plan review and approval shall be granted by the site plan review committee if: 1. There is no addition of square feet or no additional tenant, or the expansion is for storage only (future conversion of storage area would require compliance with this chapter); 2. The proposed use is similar as classified by the Standard Industrial Code Classification Manual; 3. The building has been occupied within the previous 18 months. A Site Plan Review application as established by Chapter 17.84 YMC is an administrative review process. The minimum application requirements can be found at Section 17.84.060 YMC and are listed on the application form. A notice of application is mailed to all property owners within 300 feet of the site. The site plan review committee’s decision on a site plan review application may be appealed to the Hearing Examiner, who would hold an open record hearing on the issue. The Examiner’s decision can be appealed to the City Council, which would hold a closed record hearing and determine if the decision was supported by substantial evidence or contrary to law. If a SEPA appeal is filed, the site plan review would be combined with that appeal and the Hearing Examiner would become the decision maker with a recommendation from the SPR Committee. An open record hearing would be held by the examiner on the site plan review application, if combined with a SEPA appeal. A conceptual landscaping plan is required at the time of application for site plan review. The final landscaping and irrigation plan is required as an element of civil plans, with installation and approval prior to occupancy of the business. Land use approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions of land use approval, the applicant can submit building plans for approval. State Environmental Policy Act Process A SEPA threshold determination will be not be required for this proposal. The SEPA threshold determination is appealable to the Hearings Examiner, who would hold an open record hearing on the issue. The Examiner’s decision may be appealed to City Council, which would conduct a closed record hearing and determine if the Examiner’s decision was contrary to law and supported by substantial evidence. Land Use Fees Site Plan Review $350.00 + $50.00 per 1,000 sq ft per gross floor area. Traffic Impact Fee $1,321 .00 per peak PM trip Water Meter Fee Based on meter size Sewer Connection Fee $6,050.00 per ERU or $3,093.00 if part of LID Sewer Inspection Fee $145.00 per ERU Water Connection Fee $1,500.00 per ERU Fire Impact Fee $0.32 per square foot. Parking Lot Location and Design The requirements for off-street parking and their design shall be regarded as the minimum; however, the owner, developer, or operator of the premises for which the parking facilities are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space is in excess of the minimum set forth. Chapter 17.72 YMC requires restaurants to provide one (1) parking stall for every 200 square feet of GFA. Based on the proposed square footage for the structures on both parcels, 2440 & 816, approximately 16 parking spaces would be required. A standard stall is 9 feet by 20 feet while a compact stall is 8 by 16. All parking areas must be surfaced with asphalt or concrete, and shall be striped and landscaped to the standards of the development guidelines. The design details for parking lot construction can be found in the Yelm Development Guidelines. Landscaping Types and Description The purpose of landscaping requirements is to preserve the aesthetic character of communities; to promote retention and protection of existing vegetation; and to reduce the impacts of development on drainage systems and natural habitats. Type I landscaping is intended to provide a very dense sight barrier and physical buffer to significantly separate conflicting uses and land use districts. A minimum of 15 feet of width shall be required when Type I landscaping design is utilized. Type I landscaping is required along the north and west property lines. Type II landscaping is intended to provide visual separation of uses from streets, and visual separation of compatible uses so as to soften the appearance of streets, parking areas and building elevation. It is used around the perimeter of a site with a minimum planting area of eight-feet in width. When used adjacent to a building, a minimum five-foot planting area shall be provided. Type II landscaping will be required around the perimeter of the site. Existing landscaping may be substituted for some landscape requirements. Type IV landscaping is intended to provide visual relief and shade in parking areas. Parking shall have at least 24 square feet of landscape development for each parking stall proposed. Each area of landscaping must contain at least 100 square feet of area and must be at least six feet in any direction. Transportation Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, Section 4B.140. Frontage improvements are required for all new development within the city. Frontage improvements on Yelm Avenue (SR 510) are currently complete. The City of Yelm has adopted a Transportation Facility Charge (TFC) of $1,321.00 per PM peak trip generated by new development. The code provides a default table that the applicant can use to determine the number of new PM trips generated by a proposal. The TFC charges are based on the type of use proposed. Each use may be significantly different. EXAMPLE: Gross Floor Area / 1,000 x $1,321.00=TFC Restaurant 6.13 x 816 sq. ft.= 5,002.08 ÷1,000 = 5.0 x $1,321.00 = $6,607.74 A credit of 4 trips is due from the current putt putt golf course. $6,607.74 - $5,284.00 = $1,323.74 due prior to business license issuance. Water The proposed project is located in the City of Yelm’s water service area and is currently connected to the City of Yelm’s water system. Water connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $1,500 per a connection (fee subject to change) inside city limits. The fees will be calculated utilizing the water consumption calculations provided by your civil engineer. These fees are payable at building permit issuance. An irrigation meter shall be installed and an approved backflow prevention device provided. As sewer use fees are calculated based on water usage, an irrigation meter will lower monthly sewer bills. Cross Connection Control: Washington State Department of Heath, in WAC 246-490 states all group A water systems with 1000 or more connection are required by the department of health to develop and implement a cross connection control program. This program requires all commercial buildings and irrigation systems to have a back flow prevention device installed on the water services. A list of approved devices can found at the above referenced Washington Administrative Code. Any existing well(s) will need to be abandoned per Department of Ecology standards and the water rights will need to be dedicated to the city. All commercial buildings and irrigation systems are required to provide for cross-connection control through the provisions of a back flow prevention device installed on the water services. A list of approved devices can be found at Chapter 246-290-490 WAC. Sewer The proposed site is currently located in the City of Yelm’s STEP sewer system service area and is currently connected to the City of Yelm’s STEP sewer system service area. This proposal will be required to have a grease interceptor. Commercial sewer connections are based on a consumption rate of 900 cubic feet a month and are charged at a rate of $6,050.00 per a connection (fee subject to change) inside city limits. An inspection fee of $145.00 per a connection will also be required. Fire Protection All projects need to have fire protection for the buildings. It is likely that fire flow may be an issue at this location, which will be addressed through building official review of the proposed building uses and construction material used for the buildings. The International Building Code (IBC) provides occupancy ratings for different types of uses. The fire coverage and sprinkler system for the proposed use must meet IBC requirements. Fire Impact Fee pursuant to Section 15.40.020 (B)(6) YMC is established at a rate of $0.32 per square foot of development for all new development I the City of Yelm. Stormwater Developments with additional impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. Stormwater treatment for all impervious surfaces, such as internal and frontage streets is to be treated on site. The size and design would be reviewed as part of the site plan review. A preliminary stormwater plan is required as part of Site Plan Review application submittal, and final stormwater plan review at civil plan submittal. An operations and maintenance agreement will be required. ADA Requirements The American Disabilities Act required that facilities are ADA accessible. Facility improvements will have to meet current code. Review of these improvements will be determined upon further review of the civil and architectural plans. Civil Plan Review Process Civil Plan review generally takes place after a land use approval. The Yelm Development Guidelines contain standard details for all infrastructure requirements, including parking lot layout, sewer and water lines, STEP tank design, and stormwater control. Building Permit Process Building Plan review, permitting and inspections will be based on Title 15 Yelm Municipal Code, adopting the 2003 IBC, IMC, UPC, IFC and the 2001 Washington State Energy Code. By resolution, the City of Yelm re-adopted the 1997 UBC, UMC and UPC Fee schedules. Building Plans may be submitted after Site Plan Review approval. Five(5) sets of plans, one of which may be half scale, two (2) sets of engineering calculations, energy calculations and specifications will be required. Due to the size of the occupancy, an integrated sprinkler and fire alarm system will be required. These plans may be submitted at a later date along with any required kitchen suppression systems. All fire related items 5’ outside the building will be subject to civil review along with domestic water, waste, and storm water. Concurrently with Site Plan Review two sets of building and accessory building elevations must be submitted for review of the building for consistency with the Design Guidelines. Allow at least 8 to 12 weeks for Building Plan Review and 2 weeks for design guideline review.