Pre-Application Meeting
September 15, 2010
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Randy Weber
Project Proposal: Resubmit for Yelm RV.
Project Location: Rhoton Road
Site Plan Review Process
A Site Plan Review application as established by Chapter 17.84 YMC is an administrative review process. The minimum application requirements can be found at Section 17.84.060 YMC and
are listed on the application form. A notice of application is mailed to all property owners within 300 feet of the site.
The site plan review committee’s decision on a site plan review application may be appealed to the Hearing Examiner, who would hold an open record hearing on the issue. The Examiner’s
decision can be appealed to the City Council, which would hold a closed record hearing and determine if the decision was supported by substantial evidence or contrary to law. If a
SEPA appeal is filed, the site plan review would be combined with that appeal and the Hearing Examiner would become the decision maker with a recommendation from the SPR Committee.
An open record hearing would be held by the examiner on the site plan review application, if combined with a SEPA appeal.
Land use approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions of
land use approval, the applicant can submit building plans for approval.
State Environmental Policy Act Process
Adoption of previous SEPA is appropriate if no changes
Land Use Fees
Site Plan Review $350.00 + $50 per 1,000 sq ft per gross floor area.
SEPA $0
Civil Plan Review Billed on a cost recovery basis
Traffic Impact Analysis $0
Traffic Impact Fee $1,321.00 per peak PM trip
Water Meter Fee Based on meter size
Building Plan Review Based on 1997 UBC fee Schedule
Building Permit Based on 1997 UBC fee Schedule
Sewer Connection Fee $6,050 per ERU or $3,093 if part of LID
Sewer Inspection Fee $145.00 per ERU
Water Connection Fee $5,036.00 per ERU
Fire Impact Fee $0.32 per 1,000 square feet of gross floor area.