Loading...
presub notes 050112 Richel  City of Yelm Community Development Department 105 Yelm Avenue West P.O. Box 479 Yelm, WA 98597  Pre-Application Meeting May 2, 2012 These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission. Proponent: Lester Richel Project Proposal Construct 15 townhouse units Project Location 304 SE Longmire Road The Office of the Hearings Examiner City of Yelm Issued a Report and Decision on December 21, 2006, approving a 15 unit binding site plan on approx. one acre at 304 Longmire St. Some of The Hearings Examiners conclusions are: A sewer late comers fee of $ 3793.81 associated with this parcel shall be paid at connection time A water late comers fee of $ 5893.00 associate with this parcel shall be paid at connection time The proponent shall mitigate Traffic Impact Fees and Fire Impact Fees at permit issuance Frontage Improvements shall be completed to city standards of a neighborhood collector Civil Plans submitted with this project expired on August 3, 2008. Plans shall Be resubmitted and reviewed under current Development Guidelines Building Building Plan review, permitting and inspections will be based on Title 15 Yelm Municipal Code, adopting the International Codes, Uniform Plumbing Code and Washington State Energy Code. By resolution, the City of Yelm re-adopted the 1997 UBC, UMC and UPC Fee schedules. Additions, alterations, repairs and change of occupancy will be based on Chapter 34 of the International Building Code or the International Existing Building Code. Townhouses 3 stories or less will be reviewed for life/ safety, seismic design, accessibility and energy code requirements based on the 2009 International Residential Code. Plans submitted by GMA for the townhomes have expired and shall be resubmitted under the 2009 IRC. Each townhouse is treated as a separate building. Separation may be achieved by a one hour rated sprinklered separation or 2 hour rated non sprinklered separation. Concurrently with Site Plan Review two sets of building and accessory building elevations must be submitted for review of the building for consistency with the Design Guidelines. Allow at least 3 to 4 weeks for Building Plan Review and 2 weeks for design guideline review.