Loading...
GMS MDNSSEPA NO 050657 2 MITIGATED DETERMINATION OF NONSIGNIFICANCE Proponent GMS Construction Inc Description of Proposal Construct 15 townhouses Location of the Proposal 304 Longmire Street SE Southwes of Yelm Avenue West SR 510 SectionTownshiplRange Section 24 Township 17 North Range 1 E WM Threshold Determination The City of Yelm as lead agency for this action has determined that this proposal does not have a probable significant adverse impact on the environment Therefore an environmental impact statement EIS will not be required under RCW 4321C0302cThis decision was made after review of a completed environmental checklist and other information on fle with the leatl agency This information is available o the public on request ConditionsMitigating Measu res SEE ATTACHED Lead agency City of Yelm Responsible Official Grant Beck Community Development Director D of Issu September 26 2006 ommen eadli ctober 10 2006 Appeal eadli October 17 2006 Grant BecJ Community Development Director Thi itigated Determination of NonSignificance MDNS is issued pursuant to Washington Administrative ode 19711340 2 Comments must be submitted to Tami Merriman Community Development Department at City of Yelm 105 Yelm Avenue West PO Boz 479 Yelm WA 98597 by October 10 2006 at 500PM The City of Yelm will not act on this proposal prior October 17 2006 at 500P M You may appeal this determination to the Yelm Hearing Examiner at above address by submitting a written appeal no later than October 17 2006 at 500P M You should be prepared to make specific factual objections Contact Grant Beck Community Development Director to learn more about the procedures for SEPA appeals This MDNS is not a permit and does not by itself constitute project approval The applicant must comply with all applicable requirements of the City of Yelm prior to receiving construction permits which may include but are not limited to the City of Yelm Comprehensive Plan Zoning Code Title 17 YMC Critical Areas Code Chapter 1408 YMC Storm water Drainage Design and Erosion Control Manual DOE Uniform Builtling Code State Environmental Policy Act SEPA Title 14 YMC Road Design Standards Platting and Subdivision Code Title 16 YMC and the Shoreline Master Program DO NOT PUBLISH BELOW THIS LINE Publishetl Nisqually Valley News Friday September 29 2006 Postetl in public areas Tuestlay September 262W6 Copies to All agenciescitens on SEPA mailing list antl atljacent property owners Dept of Ecology wchecklist ATTACHMENT SEPA Case Number OS0657 Findings of Fact This Mitigated Determination of Non Significance is based on the project as proposed and the impacts and potential mitigation measures reflected in the following environmental documents Environmental Checklist July 2006 KPFF Consulting Engineers 2 Chapter 1412 YMC requires the dedication of open space for all residential development Section 1412050YMC lists four 4 attributes for qualification of open space 3 The Yelm School District has adopted a school mitigation requirement based on the demand that new residential units create for additional school services and facilities Additional demands on the school system will be mitigated through the requirement that the developer enter into a mitigation agreement with the District Mitigation Measures 1 Temporary erosion control systems to be approved by the City of Yelm 2 The developer shall provide a minimum of 10 percent of qualifed open space 3 The developer shall enter into an agreement with Yelm Community Schools to mitigate project impacts to the School District