Loading...
4-17-13 (2) THE FOLLOWING CASES WILL BE CONSIDERED AT COMMUNITY DEVELOPMENT DEPARTMENT YELM CITY HALL - 105 YELM AVE W MEETING DATE: WEDNESDAY, APRIL 17, 2013 TIME PRE- SUB- MISSION Applicant Attendance Required ENVIRON- MENTAL REVIEW Internal Staff Review Only* SITE PLAN REVIEW Internal Staff Review Only* OTHER DESCRIPTION 1:00 p.m. Internal Staff Review 1:30 p.m. 20090210 –Civil Review 2 – Yelm Transportation Center, Fueling Station 2:00 p.m. Brad Carlsen – Prairie Christian Center 2:30 p.m. 3:00 p.m. Randy Weber – Parcel #22719240300 E. of Crystal Springs Rd SE, W. of Rhoton Rd SE 3:30 p.m. Limited SCOPE SDP for grading only to relocate Flood plain on site. * Environmental Review/Site Plan Review: Internal staff review only, applicants and/or representatives may attend to OBSERVE. If you plan to attend, please notify the Community Development Department at 458-3835. YELM COMMUNITY DEVELOPMENT DEPARTMENT (x) City Admin. (x) Comm. Dev. Dir. (x) Building Official (x) Mayor (x) Applicant (x) Posted (x) Public Works Dir. (x) City Engineer (x) Assistant Planner (x) Project Manager (x) Code Enforcement Officer 4 F THF Fee 4(, p Ci ty of Ye Zm Date Received By File No. Community Deuelopment Department PRES UBMISSION REQ UESTYELMF'ORMWA5MINCTON Fee: None A presubmission conference is an opportunity for applicants, developer(s) and/or consultants to meet with city staff to discuss preliminary studies or sketches of a proposed project. At the conference the staff will make available information relating to the proposed development. The intent is to identify and eliminate as many potential problems as possible in order for the project to be processed without delay. The conference should take place prior to detailed work by an engineer or surveyor9 however a site drawing must be submitted that has sufficient information to allow for evaluation. Discussion topics will include such things as Yelm's Comprehensive Plan, street design, storm runoff and retention, Shoreline Master Program, zoning, availability of sewer and water, development concepts, other requirements and permits, and the environmental impact. Staff notes are prepared and available to review. There is no charge for this meeting. Meetings are held each Wednesday. This request form should be submitted by 5:00 p.m. at least one week before the preferred meeting date. MEETING DATE REQUESTED March 13, 2013 2 p.m. a Wednesday) Time(afternoon only)i APPLICANT Same as owner OWNER Randv Weber MAILING ADDRESS ADDRESS 26550 S.E. 354th Place Black Diamond,WA 98010 TELEPHONE TELEPHONE Ce: (206)5 0-5563 EMAIL EMAIL rweber(a novastardev.com Ivana Halvorsen Planner REPRESENTATIVE (if any) Hal Grubb, P.E. OCCUPATION Civi Enaineer MAILING ADDRESS 18215-72nd Avenue South Kent,WA 98032 TELEPHONE (425)251-6222 IEMAIL hgrubb@barghausen.com/ihalvorsen@barghausen.com General location of the project East of Crystal Springs Road S.E.,West of Rhoton Road S.E. Section 19 Township 7N Range 2E Assessor's Tax Parcel Number 227-19-240300 Type of Project (Subdivision, Annexation, Zone Change, etc.. Commercial Total acreage 7.57 acres Proposed Density N/A Proposed Land Use: Single-family Duplex Multi-family Mobile Home Park Commercial Industrial BI'I@f C @SCt'IptIOCI Of pt'OJ@Ct Limited scope SDP for Gradinq onlv to relocate flood plain on site. The applicant will obtain a CLOMR(Conditional Letter of Map Revision)from FEMA as part of the Yelm Site Development Review process to show no net impact to flood plain. Grading to relocate the floodplain is proposed as stipulated by YMC 14.08.120.E.6. Please attach a copy of a site plan drawing not larger than 11" X 17" and forward to Yelm City Hall. 105 Yelm Aoenue West 360)458-3835 PO Box 479 360)458-3144 FAX Yelm, WA 98597 www.ci.yelm.wa.us i i a,A CIVIL ENGINEERING,LANR PLANNING,SURVEYING Q`cy I 1- ,,, p ,-, '.4.:, =fi 2S `I,_I11. ? `h^ r ' March 28, 2013iNeNGNEmail: KarenB(a?_ci.yelm.wa.us Mr. Grant Beck c/a Ms. Karen 8ennett City of Yelm P.O. Box 479 Yelm,WA 98597 RE: Request for Pre-Submissian Meeting Weber Property Limited 5cope Site Development Permit for Grading with Floodplain Compensatian Thurston County Parcel No. 227-19-240300 Our Job No. 12433 Dear Mr. Sec{c: On behalf of Mr, Randy Weber, we are requesting a pre-submission meeting to process a Site Development Permit (SDP} to conduct gradinq activities' on the site noted above. The proposed grading . will modify the requfated floadplain so that the floodplain porfion of the site is relocated to the west side of he site coincidenf with Yelm Creek, and the non-floodplain area can be established at the east end of the site that can be accessed from Rhoton Road. The proposal is to provide compensatory flood storage on the site to ensure that the base flaod elevation is not increased. The folfowing items are enclosed for your review: 1. Pre-submission Request Form 2. Preliminary Grading Plan for Flood Plafn Compensation prepared by Barghausen Consulting Engineers, Inc. dated March 27, 20'E3 3. FEMA Flood fnsurance Rate Map (FIRM} No. 53037 C 0353 E, effective date Octaber 16, 2012, annotated 4. Email chain fram Scott Spooner regarding his preliminary Habitat Assessment work to date 5. EMA MT-1 Forms and fnstructions (Application Forms for Conciitional and Final Letters of Map Amendment and Letters of Map Revision Based on Fill) We intend to fo!!aw the process outlined below to obtain the City of Yelm's approval as wefl as file a Letter of Map Revision with Fill (LOMR-F) to EMA far the relocated floodplain. If necessary, as a condit[on of or prior to Yelm's Site Development Permit (SDP) approval, we can fife a Conditional LOMR-F (CLOMR- F)to FEMA pri r to issuance of SDP so that City of Yelm has the assurance that FEMA wili approve the LOMR-F upon completion of Yslm's SDP-approved grading activity. Proposed process: 1. Submit Site Devefapment Permit from the City of Yelm for grading to relocate the flaodplain limits closer to Yelm Creek including the following materials: Reference YMC 14.08.120.E_6 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX BRANCH OFFICES OLYMPIA,WA 0 CONCORD,CA TEMECULA,CA www.barghausen.com Mr. Grant Beck c/o Ms. Karen Bennett City of Yelm 2- March 28, 2013 a. Floodplain Habitat Assessment b. Site and Grading Plans as listed in the SDP Checklist, limited to grading only c. SEPA Environmental Checklist d. Other documents as listed in the SDP Checklist as applicable for grading only 2. If necessary for City review and concurrent with Step 1 above, file a CLOMR-F with FEMA. This will require the City's signature on the MT-1 Community Acknowledgement Form. 3. Complete grading activities on site consistent with the City of Yelm's SDP Permit and Conditions of Approval. 4. File the Final LOMR-F to FEMA to revise the flood elevations for the site. We believe that the process as noted will enable the City to review the proposed grading as a standalone permitted action that will not trigger a variance or special approval. Grading actions such as that proposed are allowed per Yelm Municipal Code 14.08.120.E.6. Please schedule a meeting so that we can discuss this proposal in more detail. Thank you. Respectfully, t"l/I/c li Ivana Halvorsen Senior Planner IH/dm 12433c.012.doc enc: As Noted cc: Mr. Randy Weber(w/enc. via email) fMr. Hal P. Grubb, Barghausen Consulting Engineers, Inc.