204 Yelm Ave E Drenie Weber 042413
City of Yelm
Community Development Department
105 Yelm Avenue West
Yelm, WA 98597
Pre-Application Meeting
April 24, 2013
These comments are preliminary in nature and are not intended to represent final comments and or requirements for the City of Yelm. Until a complete application is made, the Community
Development Department can only attempt to inform the applicant of general requirements as they appear in the form presented by the applicant at the time of pre-submission.
Proponent: Kym Drenie & Jayne Weber
Project Proposal: Operate a preschool in existing building
Project Location: 204 Yelm Avenue East
Parcel Number: 64400701500
Property Background and Zoning
The property is zoned Central Business District (CBD) which is codified at Chapter 17.24 YMC. A Preschools and Nursery School is listed as a Special Use in Section 17.66.020, and is
allowed in the CBD with a special use permit.
The building is existing, and has on street parking along its front on Yelm Avenue, as well as paved parking in the rear, accessed from the alley.
Critical Areas
The City critical area maps indicate that the property is located outside of wetlands, flood zones, and high ground water areas.
All of Yelm is considered a critical aquifer recharge area. Protection measures for development within a critical aquifer recharge area are met through treating and disposing of stormwater
through an approved stormwater system.
Development Standards
Water
The site is currently served by City water service. It is unclear at this time whether additional water connections will be required. Evidence of water usage will be reviewed at building
permit issuance.
All commercial buildings and irrigation systems are required to provide for cross-connection control through the provisions of a back flow prevention device (reduced pressure backflow
assembly) installed on the water services. A list of approved devices can be found at Chapter 246-290-490 WAC. If irrigation is installed, a double detector check valve is required.
The site currently has a double check valve which will need to be upgraded to a Reduced Pressure Backflow assembly.
Sewer
The site is currently connected to the City sewer system. If additional water connections are required, additional sewer connections will also be required.
Stormwater
Developments with additional impervious surface are required to provide stormwater facilities pursuant to the 1992 DOE Stormwater Manual. Stormwater treatment for all impervious surfaces,
such as internal and frontage streets is to be treated on site.
Additional stormwater treatment is not required as no impervious surfaces are proposed.
Transportation
Frontage improvements are required for all new development within the city, including expansions of uses that require a site plan review approval. Yelm Avenue at this location does
not require further improvements.
Parking
The requirements for off-street parking and their design shall be regarded as the minimum; however, the owner, developer, or operator of the premises for which the parking facilities
are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space is in excess of the minimum set forth.
Chapter 17.72 YMC requires a minimum of 1 stall per employee based on the greatest number of employees, plus a loading and unloading area with storage for 3 cars. City of Yelm Development
Guidelines require that parking areas be paved and landscaped. Parking plan shall be submitted with Site Plan Review.
Building Design
Building design should be comfortable at a human scale, and incorporate features such as balconies in upper stories, bay windows, building articulations, covered entries, or upper story
setbacks.
Perimeter landscaping is required to provide visual relief, and consists of an eight (8) foot planter strip with groupings of evergreen and deciduous trees, and shrubs.
The existing site meets the design standards listed above.
Site Planning
Service areas and outdoor storage shall be located away from neighboring properties and located behind the building. No refuse container shall be permitted between a street and the
front of a building.
Currently the site uses “residential” cans for refuse, and they are to be screened when not placed out for pick up. If the preschool requires a dumpster, the refuse area must be large
enough to accommodate a dumpster and recycle bin. Refuse areas must be screened with an enclosure of a material and design compatible with the overall architectural theme and landscaped
consistent with the required perimeter landscaping.
Approval Process
Special Use
A special use permit requires a public hearing before the Yelm Hearing Examiner, who would prepare findings and a written decision and may approve a special use permit when it is consistent
with City development standards and properties adjacent to the proposed use are reasonable projected from adverse effects or impacts. The final decision of the Hearing Examiner may
be appealed to the City Council. A special use permit runs with the property and does not expire unless specifically conditioned in the approval.
Site Plan Review
Site plan review and approval is required prior to the use of land or building for the location of any commercial, industrial or public building or activity, or for the conversion of
an existing building to a new use.
A Site Plan Review application would be reviewed and issued concurrently with the Special Use Permit. The minimum application requirements can be found at Section
17.84.060 YMC and are listed on the application form. A notice of application is mailed to all property owners within 300 feet of the site.
A site plan review approval typically contains conditions of approval that the applicant must complete prior to receiving a building permit. Upon satisfactory completion of all conditions
of land use approval, the applicant can submit building plans for approval.
State Environmental Policy Act
The project is exempt from SEPA pursuant to 197-11-800 WAC, as the building is under 4,000 square feet in area, and less than 20 parking stalls are required.
Building Permit Process
Building Plan review, permitting and inspections will be based on Title 15 Yelm Municipal Code, adopting the International Codes, Uniform Plumbing Code and Washington State Energy Code.
By resolution, the City of Yelm re-adopted the 1997 UBC, UMC and UPC Fee schedules. Additions, alterations, repairs and change of occupancy will be based on Chapter 34 of the International
Building Code or the International Existing Building Code. New and existing buildings will be reviewed for life/ safety, seismic design, accessibility and energy code requirements.
Some, but not all factors reviewed will be:
Life /Safety:
The existing building has been used as business occupancy. Per chapter 3 of the IBC a day care with more than 5 children shall be an E Occupancy. The comments are based on a change
of occupancy from a B to an E Occupancy. Based on the Thurston County’s Assessor’s Office the max occupancy number will be 40.
The Existing fire hydrants will adequately serve the building
An E Occupancy with less the 50 students is not required to be sprinklered
Due to the age of the building interior wall covering will be reviewed for compliance with chapter 8 of the IBC. Specifically class of flame spread
Current access and egress will be acceptable if the conditions of Accessibility Sections are met
Seismic design:
Change of Occupancy does not change the Occupancy Category. No seismic upgrades required
Accessibility:
Changes of elevation greater than 5% shall be accessible ramps.
The building shall have one accessible entrance. One accessible parking stall shall be made available for each 25 parking stalls. One van accessible parking stall for each accessible
parking stall is required for each 6 accessible parking stall
An accessible route shall connect the parking stalls to the entry. Parking lot shall be striped and signed accordingly
All new restrooms and fixtures shall meet ADA requirements
Plumbing
A change of occupancy shall meet the current plumbing and mechanical codes. Separate facilities are required for occupancies over 15.
Energy Code.
All new or altered Conditioned space shall meet the 2009 Washington State Energy Code:
Building Plans showing conformance to the above requirements and any other items deemed necessary may be submitted after Site Plan Review approval. Five(5) sets of plans, one of which
may be half scale, two (2) sets of engineering calculations, energy calculations and specifications will be required. An integrated sprinkler and fire alarm system may be required.
These plans may be submitted at a later date along with any required kitchen suppression systems. All fire related items 5’ outside the building will be subject to civil review along
with domestic water, waste, and storm water.
Concurrently with Site Plan Review two sets of building and accessory building elevations must be submitted for review of the building for consistency with the Design Guidelines.
Allow at least 8 to 12 weeks for Building Plan Review and 2 weeks for design guideline review.
Fees & Charges
Special Use Permit $500.00
Site Plan Review $350.00 + $50 per 1,000 sq. ft. of gross floor area (50% reduction on the lesser of the two permits)
Civil Plan Review Billed on a cost recovery basis
Building Plan Review Based on 1997 UBC fee Schedule
Building Permit Based on 1997 UBC fee Schedule
Sewer Connection Fee $6,394.00 per ERU
Sewer Inspection Fee $145.00 per ERU
Water Connection Fee $5,490.00 per ERU
Water Meter Fee Based on meter size
Transportation Facilities Charge $1,321.00 per peak PM trip
The Transportation Facility Charge (TFC) is per new PM peak trip generated by the development. The code provides a default table that the applicant can use to determine
the number of new PM trips generated by a proposal. When a specific use is not listed, a similar use can be used. In this instance, the most similar use is an elementary school. The
trip generation for an elementary school is less than the previous use of miscellaneous retail. No TFC charges are required.
The City will accept a traffic engineers report as to peak hour traffic generation rather than the default table.