Pre-Application Meeting
February 12, 2014
These comments are preliminary in nature and are not intended to represent final comments and or
requirements for the City of Yelm. Until a complete application is made, the Community Development
Department can only attempt to inform the applicant of general requirements as they appear in the form
presented by the applicant at the time of pre-submission.
Proponent: Marvin Pratt, East Haven Villas, LLC
Representative: Bob Balmelli, RB Engineering
Project Proposal: Construct 22,800 Sq. Ft. Memory Care Facility at existing
East Haven Villa site with Boundary Line Adjustment
Project Location: 311 Cullens Road / 111 Killion Road
Tax parcel numbers: 21724140502 & 21724140600
Property Background and Zoning
The property is zoned Commercial (C-1) which is codified at Chapter 17.26 YMC. The
purpose of the C-1 zone is to provide of the location of business centers to serve the
needs of the community for convenience goods and services. The C-1 zone allows
nursing homes, convalescent and congregate care facilities through a special use
permit pursuant to Chapter 17.66 YMC.
East Haven received a special use permit in 1997 to construct a 26,500 sq. ft residential
care facility. In 2002, the Yelm Hearing Examiner approved a Phase II conditional use
to construct an additional building for assisted living units, and associated office and
maintenance facilities. The additional facility requires the issuance of a new conditional
use permit.
Critical Areas
The City critical area maps indicate that the property is located outside of wetlands,
flood zones, and high ground water areas.
All of Yelm is considered a critical aquifer recharge area. Protection measures for
development within a critical aquifer recharge area are met through treating and
disposing of stormwater through an approved stormwater system.
Pre-Application Meeting
Page 2 of 6
Development Standards
Water
The site is within the City of Yelm water service area and the existing buildings are
currently connected to City water service via an 8 inch main on Cullens. There is also a
6” fire line around and serving the building. There is a 10 inch water main located in
Killion Road.
The Civil engineer shall provide estimated water calculations at the time of civil plan
review to determine the number of additional water connections needed to serve the
project.
All commercial buildings and irrigation systems are required to provide for cross-
connection control through the provisions of a back flow prevention device (reduced
pressure backflow assembly) installed on the water services. A list of approved devices
can be found at Chapter 246-290-490 WAC. The backflow device is required to be
installed after the meter and tested by a certified backflow tester.
Sewer
The site is within the City of Yelm sewer service area and the existing buildings are
connected to City sewer service. There is a 2” sewer service line located on the south
side of the existing facility, as well as what appears to be a 2” service line on the north
side of the facility. The point of new connection will be determined when an official site
plan is created. A licensed civil engineer will need to design a system, based on water
usage calculations.
Food preparation requires a grease interceptor to be installed. There are options for
grease interceptor size and location, based on the size of the use. The grease
interceptor must be designed by a licensed engineer and reviewed by the City. If
additional water connections are required, additional sewer connections will also be
required.
Stormwater
Developments with additional impervious surface are required to provide stormwater
facilities pursuant to the Stormwater Management Manual for Western Washington.
Transportation
Frontage improvements are required for all new development within the city, including
expansion of uses that require a site plan review approval. The property fronts on
Pre-Application Meeting
Page 3 of 6
Cullens Road which improvements were completed as part of the original Conditional
Use Permit Approval.
The City of Yelm Transportation Plan identifies, in the Transportation Improvement
Program Project Y4A, the need for a street connection between Coates and Killion
Road. The future street would be constructed to a Commercial Collector Standard. In
order to achieve the future connection, a requirement of any land use approval will most
likely be to protect a 30 foot future road area along the northern property line from the
Cullens Road point west to Killion Road. The boundary line adjustment and/or site plan
review approval shall show the 30 foot future roadway area to be left unencumbered.
Parking
The requirements for off-street parking and their design shall be regarded as the
minimum; however, the owner, developer, or operator of the premises for which the
parking facilities are intended shall be responsible for providing adequate amounts and
arrangement of space for the particular premises even though such space is in excess
of the minimum set forth.
Chapter 17.72 YMC requires institutions and long-term care facilities to provide one
parking stall for each two beds, plus one per employee based on the greatest number of
care employees on a single shift.
Chapter 17.72 YMC also offers incentives for reducing the number of required parking
stalls, which East Haven used in the original Conditional Use Approval.
Design Guidelines
Building setbacks are 15 feet from the front, 20 feet from the rear and 10 feet from the
side property lines, the maximum building height is forty (40) feet. The property is
located within the “Village Retail District” of the Yelm Design Guidelines.
Building design should be comfortable at a human scale, and incorporate features such
as balconies in upper stories, bay windows, building articulations, covered entries, or
upper story setbacks.
To encourage unique, identifiable architectural features at intersections, additional
elements to be included are decorated rooflines, window or door treatments, light
fixtures or building materials. Concrete block walls must use textured blocks, colored
mortar or a mix of other masonry types, and metal roofing must be of high quality with a
standing seam.
Blank walls must be treated through trellis and plantings, landscaping beds or other
methods.
Pre-Application Meeting
Page 4 of 6
Site Planning
All development for properties not on pedestrian oriented streets shall include site
planning measures to create an attractive street edge and accommodate pedestrian
access, such as landscape features, and direct pedestrian access from the sidewalk
and parking.
Perimeter site landscaping consists of a standard eight foot strip with a combination of
deciduous and evergreen trees, and shrubs, or a fifteen foot landscape strip to provide
a dense site barrier if adjacent to conflicting uses.
Pedestrian circulation and amenities shall be provided with all development, such as
adequate lighting, safe pathways from sidewalks and parking, weather protection at
entries, and special amenities such as window displays or pedestrian scaled signs. All
pedestrian paths must comply with the ADA.
Service areas and outdoor storage shall be located away from neighboring properties
and located behind the building. No refuse container shall be permitted between a
street and the front of a building.
The refuse area must be large enough to accommodate a dumpster and recycle bin.
Refuse areas must be screened with an enclosure of a material and design compatible
with the overall architectural theme and landscaped consistent with the required
perimeter landscaping.
Building
Building Plan review, permitting and inspections will be based on Title 15 Yelm
Municipal Code, adopting the International Codes, Uniform Plumbing Code and
Washington State Energy Code. By resolution, the City of Yelm re-adopted the 1997
UBC, UMC and UPC Fee schedules.
The proposed building an I-2 Occupancy Nursing Home, and will be reviewed for life/
safety, structural design, accessibility and energy code requirements.
Life /Safety & Accessibility
An I-2 Nursing Home building Shall conform of the International Building Code
for an I-2 Occupancy, including but not limited to Section 407 and Chapter 11
An accessible circulation path shall be within all primary functions and from the I-
2 Nursing Home space, to parking and/or bus stop. Slope shall be a maximum of
5% with a cross slope of 2%.
Changes of elevation greater than 5% shall be accessible ramps.
The I-2 Nursing Home spaces shall have 60% of the entrances accessible.
One accessible parking stall shall be made available for each 25 parking stalls.
Pre-Application Meeting
Page 5 of 6
One van accessible parking stall is required for every six accessible parking
stalls
Parking lot shall be striped and signed accordingly
Maneuvering clearance at door are waived provided the door width is a minimum
of 44 inches
Structural Design:
The I-2 Nursing Home shall be designed per the requirements of Chapter 16 of
the International Building Code as a risk category III
Energy Code and Mechanical Code
An I-2 Nursing Home shall be heated, insulated and ventilated per the WEC and
the International Mechanical Code
Plumbing Code
The I-2 Nursing Home shall comply with the Uniform Plumbing Code for domestic
water and sanitary waste.
Kitchens will need the appropriate hoods and vents
Type I hoods for grease laden vapors shall have fire protection.
Plumbing grease interceptors, sinks, floor drains and indirect wastes required by
the City of Yelm or the Thurston County Health Department shall meet current
codes.
Building Plans showing conformance to the above requirements and any other items
deemed necessary may be submitted after Site Plan Review approval. Five(5) sets of
plans, one of which may be half scale, two (2) sets of engineering calculations, energy
calculations and specifications will be required. All fire related items 5’ outside the
building will be subject to civil review along with domestic water, waste, and storm
water.
Concurrently with Site Plan Review two sets of building and accessory building
elevations must be submitted for review of the building for consistency with the Design
Guidelines.
Allow at least 8 to 12 weeks for Building Plan Review and 2 weeks for design guideline
review.
Approval Process
Site Plan Review
Site plan review and approval is required prior to the use of land or building for the
location of any commercial, industrial or public building or activity, or for the conversion
of an existing building to a new use.
Pre-Application Meeting
Page 6 of 6
The minimum application requirements can be found at Section 17.84.060 YMC and are
listed on the application form. A notice of application is mailed to all property owners
within 300 feet of the site.
A site plan review approval typically contains conditions of approval that the applicant
must complete prior to receiving a building permit. Upon satisfactory completion of all
conditions of land use approval, the applicant can submit building plans for approval.
Boundary Line Adjustment
A boundary line adjustment is a ministerial review. The boundary line adjustment can
be reviewed concurrently with the Site Plan Review.
State Environmental Policy Act
A SEPA threshold determination is required for new commercial construction projects
over 4,000 square feet or 20 or more parking stalls.
Fees & Charges
Site Plan Review $350.00 + $50 per 1,000 sq. ft. of gross floor area
Boundary Line Adjustment $100.00
SEPA Review $150.00
Civil Plan Review Billed on a cost recovery basis
Building Plan Review Based on 1997 UBC fee Schedule
Building Permit Based on 1997 UBC fee Schedule
Sewer Connection Fee $6,394.00 per ERU
Sewer Inspection Fee $145.00 per ERU
Water Connection Fee $5,903.59 per ERU
Water Meter Fee Based on meter size
Transportation Facilities Charge $1,321.00 per peak PM trip
The Transportation Facility Charge (TFC) is per new PM peak trip generated by the
development. The code provides a default table that the applicant can use to determine
the number of new PM trips generated by a proposal. A congregate care or assisted
living facility creates 0.17 new pm peak hour trips per dwelling (bed).
0.17 X 30 dwellings (beds) = 5.1 trips X $1,321.00 = $6,737.10
The City will accept a traffic engineers report as to peak hour traffic generation rather
than the default table.