Loading...
01-11-2017 - LF (2) THE FOLLOWING CASES WILL BE CONSIDERED AT COMMUNITY DEVELOPMENT DEPARTMENT YELM CITY HALL - 105 YELM AVE W MEETING DATE: WEDNESDAY, JANUARY 11, 2017 TIME PRE- SUB- MISSION Applicant Attendance Required ENVIRON- MENTAL REVIEW Internal Staff Review Only* SITE PLAN REVIEW Internal Staff Review Only* OTHER DESCRIPTION 1:00 p.m. 1:30 p.m. 2:00 p.m. INTERNAL STAFF REVIEW 2:30 p.m. 3:00 p.m. STAFF REVIEW 3:30 p.m. 1ST ST SIDEWALK. SE MOSMAN AVE TO WASHINGTON AVE SE * Environmental Review/Site Plan Review: Internal staff review only, applicants and/or representatives may attend to OBSERVE. If you plan to attend, please notify the Community Development Department at 458-3835. YELM COMMUNITY DEVELOPMENT DEPARTMENT (x) City Admin. (x) Comm. Dev. Dir. (x) Building Official (x) Mayor (x) Applicant (x) Posted (x) Public Works Dir. (x) City Engineer (x) Assistant Planner (x) Project Manager (x) Code Enforcement Officer TaskBegins OnDuration (Cal. Days)Ends On1Authorization to ProceedCompleted2Send out Utility Map Requests/ Call for LocatesCompleted3Topographical Survey (Window)Completed4Prepare 30% Concept PlanCompleted5Draft SEPA for CityCompleted6Send 30% Plan to City/Parks Master Plan ArchitectCompleted7City reviews 30% Concept Plan (incorporate Park Master Plan/Architect)Completed8QA/QC Concept 30% with CityCompleted9Send 30% Plans to WSDOT For ReviewCompleted10Prepare 60% PS&ECurrent11Prepare 60% Plans and SpecificationsCompleted12Send 60% to City / WSDOT for reviewCompleted13ROW Acquisition / Easement Acquisition December 30, 2016 60 February 28, 201714WSDOT Reviews 60%December 30, 2016 7 January 6, 201715City Reviews 60%December 30, 2016 14 January 13, 201716QA/QC (60%) meeting with City January 13, 2017 1 January 13, 201717Prepare 90% PS&EJanuary 13, 2017 10 January 23, 201718Submit 90% Plans to City January 23, 2017 1 January 23, 201719City Review of 90%January 23, 2017 7 January 30, 201720WSDOT Review of 90%January 23, 2017 14 February 6, 201721Prepare Final January 30, 2017 22 February 21, 201722Submit Final to CityFebruary 21, 2017 7 February 28, 201723TIB Approval to AdvertiseFebruary 21, 2017 7 February 28, 201724Advertise ProjectFebruary 28, 2017 14 March 14, 201725Open BidsMarch 14, 2017 1 March 14, 201726Council awards projectMarch 14, 2017 14 March 28, 201727Contracts are signed by Contractor & City March 28, 2017 14 April 11, 201728Notice to Proceed & Preconstruction Meeting April 11, 2017 10 April 21, 2017City of Yelm1st Street Sidewalk ProjectG&O Project # 16490Project Schedule - Updated: 12/30/2016 CITY OFFICIALS MAYOR TODD STILLWEL JW FOSTER CITY COUNCIL JENNIFER LITTLEFIELDEJ CURRY MOLLY CARMODY TRACY WOOD CHAD BEDLINGTON CITY OF YELM THURSTON COUNTY WASHINGTON PUBLIC WORKS DIRECTOR / PROJECT MANAGER 1ST STREET SOUTH SIDEWALK IMPROVEMENTS (MOSMAN AVE SE TO WASHINGTON AVE SE) JOE DePINTO RUSS HENDRICKSON T .I.B. PROJECT NO. P-W-978(P02)-1 PRE LI MI N A R Y JANUARY 2017 1ST S T ( S R 5 0 7) VICINITY MAP YELM SHEET INDEX LOCATION MAP PROJECT AREA 1 LEGEND, ABBREVIATIONS, VICINITY AND LOCATIONMAP AND SHEET INDEX1 LEGEND, ABBREVIATIONS, VICINITY AND LOCATION MAP AND SHEET INDEX 2 SURVEY CONTROL TABLE, ALIGNMENT CONTROL TABLES, GENERAL NOTES AND SITE MAP 3 - 4 NORTH SIDEWALK PLAN-PROFILES 5 - 6 PARK SIDEWALK PLAN-PROFILE S 7 PARK MAINTENANCE ACCESS PLAN-PROFILE 8 TYPICAL CROSS SECTIONS 9 - 10 ROADWAY DETAILS 11 - 13 STORM DRAINAGE DETAILS 14 CHANNELIZATION AND SIGNING PLAN 15 CHANNELIZATION AND SIGNING DETAILS 16 - 18 TRAFFIC CONTROL DETAILS 19 TESC PLAN 20 - 21 TESC DETAILS LINETYPESABBREVIATIONS WATER SYMBOLS GAS/POWER/TELEPHONE SYMBOLS SURVEY SYMBOLS SANITARY/STORM SEWER SYMBOLS SIGNALIZATION/ILLUMINATION SYMBOLS CHANNELIZATION SYMBOLS SURFACE FEATURES/LANDSCAPING PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 SHEET #DESCRIPTION 2 SURVEY CONTROL TABLE, ALIGNMENT CONTROLTABLES, GENERAL NOTES AND SITE MAPPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 SURVEY CONTROL TABLE HORZ. DATUM = NAD83/07 WSPCS SOUTH ZONE, GRID NOTH VERT. DATUM = NAVD88 1ST STREET SIDEWALK, SURVEY CONTROL TABLE SITE MAP SCALE: 1" = 200' GENERAL NOTES: RIGHT-OF-WAY DISCLAIMER SW EDWAR D S S T YELM-TENINO TRAIL SR 507 1ST ST S 2ND ST SE ALIGNMENT CONTROL TABLES ROADWAY & STORM DRAINAGE NOTES PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE SHEET 4NORTH SIDEWALK PLAN-PROFILERIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG 3 PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE SHEET 3NORTH SIDEWALK PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES RIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG 4 ROADWAY & STORM DRAINAGE NOTES PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK SIDEWALK PLAN-PROFILERIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG 1ST ST S (SR 507)SE MOSMAN AVEYELM CITY PARK 5 PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK SIDEWALK PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES RIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG 6 PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK MAINTENANCE ACCESS PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES RIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG1ST ST S(SR 507)7 PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 TYPICAL CROSS SECTIONSTYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION 67$“7267$“ TYPICAL 1ST ST S (SR 507) SE PERVIOUS SIDEWALK SECTION 67$“7267$“ TYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION 67$“7267$“ TYPICAL PARK MAINTENANCE ACCESS SECTION 67$“7267$“ TYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION 67$“7267$“8 BUTT JOINT DETAIL HMA DRIVEWAY CEMENT CONCRETE CURBS CITY OF YELM STANDARD DETAIL 4-13 (MODIFIED) CEMENT CONCRETE TRAFFIC CURB AND GUTTER CEMENT CONCRETE BARRIER CURB DRIVEWAY SCHEDULE NOTES: GRIND/COLD PLANE AT ADJACENT PARKING AREASTOPSOIL INSTALLATION DETAIL 6"SECTION NTS SECTION NTS ISOMETRIC VIEW CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 2 DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 9 ROADWAY DETAILS MONOLITHIC CURB DESIGN TABLE STATION OFFSET TOP OF MONOLITHIC CURB ELEVATION CURB HEIGHT CEMENT CONCRETE SIDEWALK CITY OF YELM STANDARD DETAIL 4-11 (MODIFIED) MONOLITHIC CEMENT CONCRETE CURB AND SIDEWALK EXTRUDED CEMENT CONCRETE CURB TYPICAL RELOCATED METER PLACEMENT PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 10 ROADWAY DETAILS 11 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 12 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 CONCRETE INLET INSTALLATION DETAIL ELEVATION PLAN (WITH CURB AND GUTTER) TRENCH SECTION - RIGID STORM PIPE TYPICAL TRENCH EXCAVATION LIMITS STORM SEWER PIPE 13 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 OUTSIDE PAVED AREA INSIDE PAVED ROADWAY MODIFIED CATCH BASIN ADJUSTMENT DETAILVALVE BOX ADJUSTMENT DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE BELOWCHANNELIZATION AND SIGNING PLANRIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIGMATCHLINE STA 44+00, SEE ABOVE1ST ST S (SR 507) 1ST ST S (SR 507)WASHINGTONAVE SECHANNELIZATION NOTES: GENERAL ͟͟ SIGNING NOTES: 14 TYPICAL SIGN LOCATION DETAIL CASE 1 CASE 2 STREET SIGN INSTALLATION DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 15 CHANNELIZATION AND SIGNING DETAILS 16 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 17 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 18 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 TESC PLANRIGHT-OF-WAY DISCLAIMER BURIED UTILITIES IN AREA 1-811 CALL BEFORE YOU DIG 19MATCHLINE, SEE BELOWMATCHLINE, SEE ABOVE EROSION/SEDIMENTATION CONTROL NOTES PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 20 TESC NOTES & DETAILSFILTER FABRIC FENCE SECTION FILTER FABRIC FENCE ELEVATION INLET PROTECTION DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 21 TESC DETAILS