SitePlanReviewAgenda - LF
THE FOLLOWING CASES WILL BE CONSIDERED AT
COMMUNITY DEVELOPMENT DEPARTMENT
YELM CITY HALL - 105 YELM AVE W
MEETING DATE: WEDNESDAY, JANUARY 11, 2017
TIME
PRE-
SUB-
MISSION
Applicant
Attendance
Required
ENVIRON-
MENTAL
REVIEW
Internal
Staff
Review
Only*
SITE
PLAN
REVIEW
Internal
Staff
Review
Only*
OTHER
DESCRIPTION
1:00 p.m.
1:30 p.m.
2:00 p.m.
INTERNAL STAFF REVIEW
2:30 p.m.
3:00 p.m.
STAFF REVIEW
3:30 p.m.
1ST ST SIDEWALK. SE MOSMAN AVE
TO WASHINGTON AVE SE
* Environmental Review/Site Plan Review: Internal staff review only, applicants and/or
representatives may attend to OBSERVE. If you plan to attend, please notify the Community
Development Department at 458-3835.
YELM COMMUNITY DEVELOPMENT DEPARTMENT
(x) City Admin. (x) Comm. Dev. Dir. (x) Building Official (x) Mayor
(x) Applicant (x) Posted (x) Public Works Dir. (x) City Engineer
(x) Assistant Planner (x) Project Manager (x) Code Enforcement Officer
TaskBegins OnDuration (Cal. Days)Ends On1Authorization to ProceedCompleted2Send out Utility Map Requests/ Call for LocatesCompleted3Topographical Survey (Window)Completed4Prepare 30% Concept PlanCompleted5Draft SEPA for CityCompleted6Send 30% Plan to City/Parks Master Plan ArchitectCompleted7City reviews 30% Concept Plan (incorporate Park Master Plan/Architect)Completed8QA/QC Concept 30% with CityCompleted9Send 30% Plans to WSDOT For ReviewCompleted10Prepare 60% PS&ECurrent11Prepare 60% Plans and SpecificationsCompleted12Send 60% to City / WSDOT for reviewCompleted13ROW Acquisition / Easement AcquisitionDecember 30, 201660February 28, 201714WSDOT Reviews 60%December 30, 20167January 6, 201715City Reviews 60%December 30, 201614January 13, 201716QA/QC (60%) meeting with CityJanuary 13, 20171January 13, 201717Prepare 90% PS&EJanuary 13, 201710January 23, 201718Submit 90% Plans to City January 23, 20171January 23, 201719City Review of 90%January 23, 20177January 30, 201720WSDOT Review of 90%January 23, 201714February 6, 201721Prepare Final January 30, 201722February 21, 201722Submit Final to CityFebruary 21, 20177February 28, 201723TIB Approval to AdvertiseFebruary 21, 20177February 28, 201724Advertise ProjectFebruary 28, 201714March 14, 201725Open BidsMarch 14, 20171March 14, 201726Council awards projectMarch 14, 201714March 28, 201727Contracts are signed by Contractor & CityMarch 28, 201714April 11, 201728Notice to Proceed & Preconstruction MeetingApril 11, 201710April 21, 2017City of Yelm1st Street Sidewalk ProjectG&O Project # 16490Project Schedule - Updated: 12/30/2016
CITY OFFICIALS
MAYOR
TODD STILLWEL
JW FOSTER
CITY COUNCIL
JENNIFER LITTLEFIELDEJ CURRY MOLLY CARMODY
TRACY WOOD
CHAD BEDLINGTON
CITY OF YELM
THURSTON COUNTY WASHINGTON
PUBLIC WORKS DIRECTOR / PROJECT MANAGER
1ST STREET SOUTH SIDEWALK IMPROVEMENTS
(MOSMAN AVE SE TO WASHINGTON AVE SE)
JOE DePINTO RUSS HENDRICKSON
T .I.B. PROJECT NO. P-W-978(P02)-1
PRE
LI
MI
N
A
R
Y
JANUARY 2017
1ST ST (SR 507)
VICINITY MAP
YELM
SHEET INDEX
LOCATION MAP
PROJECT AREA
1 LEGEND, ABBREVIATIONS, VICINITY AND LOCATIONMAP AND SHEET INDEX1 LEGEND, ABBREVIATIONS, VICINITY AND LOCATION
MAP AND SHEET INDEX
2 SURVEY CONTROL TABLE, ALIGNMENT CONTROL
TABLES, GENERAL NOTES AND SITE MAP
3 - 4 NORTH SIDEWALK PLAN-PROFILES
5 - 6 PARK SIDEWALK PLAN-PROFILES
7 PARK MAINTENANCE ACCESS PLAN-PROFILE
8 TYPICAL CROSS SECTIONS
9 - 10 ROADWAY DETAILS
11 - 13 STORM DRAINAGE DETAILS
14 CHANNELIZATION AND SIGNING PLAN
15 CHANNELIZATION AND SIGNING DETAILS
16 - 18 TRAFFIC CONTROL DETAILS
19 TESC PLAN
20 - 21 TESC DETAILS
LINETYPESABBREVIATIONS
WATER SYMBOLS
GAS/POWER/TELEPHONE SYMBOLS
SURVEY SYMBOLS
SANITARY/STORM SEWER SYMBOLS
SIGNALIZATION/ILLUMINATION SYMBOLS
CHANNELIZATION SYMBOLS
SURFACE FEATURES/LANDSCAPING
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
SHEET #DESCRIPTION
2 SURVEY CONTROL TABLE, ALIGNMENT CONTROLTABLES, GENERAL NOTES AND SITE MAPPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
SURVEY CONTROL TABLE
HORZ. DATUM = NAD83/07
WSPCS SOUTH ZONE, GRID NOTH
VERT. DATUM = NAVD88
1ST STREET SIDEWALK, SURVEY CONTROL TABLE
SITE MAP
SCALE: 1" = 200'
GENERAL NOTES:
RIGHT-OF-WAY DISCLAIMER
SW EDWARDS
S
T
YELM-TENINO
TRAIL
SR 507 1ST ST S
2ND ST SE
ALIGNMENT CONTROL TABLES
ROADWAY & STORM DRAINAGE NOTES
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE SHEET 4NORTH SIDEWALK PLAN-PROFILERIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG
3
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE SHEET 3NORTH SIDEWALK PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES
RIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG
4
ROADWAY & STORM DRAINAGE NOTES
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK SIDEWALK PLAN-PROFILERIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG
1ST ST S
(SR 507)SE MOSMAN AVEYELM CITY
PARK
5
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK SIDEWALK PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES
RIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG
6
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 PARK MAINTENANCE ACCESS PLAN-PROFILE ROADWAY & STORM DRAINAGE NOTES
RIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG1ST ST S(SR 507)7
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 TYPICAL CROSS SECTIONSTYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION
STA. 40+60± TO STA. 43+60±
TYPICAL 1ST ST S (SR 507) SE PERVIOUS SIDEWALK SECTION
STA. 30+05± TO STA. 34+45±
TYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION
STA. 43+60± TO STA. 46+30±
TYPICAL PARK MAINTENANCE ACCESS SECTION
STA. 70+22± TO STA. 70+90±
TYPICAL 1ST ST S (SR 507) NW SIDEWALK SECTION
STA. 44+90± TO STA. 46+30±8
BUTT JOINT DETAIL
HMA DRIVEWAY
CEMENT CONCRETE CURBS
CITY OF YELM STANDARD DETAIL 4-13 (MODIFIED)
CEMENT CONCRETE TRAFFIC CURB AND GUTTER
CEMENT CONCRETE BARRIER CURB
DRIVEWAY SCHEDULE
NOTES:
GRIND/COLD PLANE AT ADJACENT
PARKING AREASTOPSOIL INSTALLATION DETAIL 6"SECTION
NTS
SECTION
NTS
ISOMETRIC VIEW
CEMENT CONCRETE DRIVEWAY ENTRANCE TYPE 2 DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
9 ROADWAY DETAILS
MONOLITHIC CURB DESIGN TABLE
STATION OFFSET
TOP OF MONOLITHIC
CURB ELEVATION
CURB
HEIGHT
CEMENT CONCRETE SIDEWALK
CITY OF YELM STANDARD DETAIL 4-11 (MODIFIED)
MONOLITHIC CEMENT CONCRETE
CURB AND SIDEWALK
EXTRUDED CEMENT CONCRETE CURB
TYPICAL RELOCATED METER PLACEMENT
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
10 ROADWAY DETAILS
11 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
12 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
CONCRETE INLET INSTALLATION DETAIL
ELEVATION
PLAN
(WITH CURB AND GUTTER)
TRENCH SECTION - RIGID STORM PIPE
TYPICAL TRENCH EXCAVATION LIMITS STORM SEWER PIPE
13 STORM DRAINAGE DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
OUTSIDE PAVED AREA
INSIDE PAVED ROADWAY
MODIFIED
CATCH BASIN ADJUSTMENT DETAILVALVE BOX ADJUSTMENT DETAIL
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21MATCHLINE STA 44+00, SEE BELOWCHANNELIZATION AND SIGNING PLANRIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIGMATCHLINE STA 44+00, SEE ABOVE1ST ST S
(SR 507)
1ST ST S
(SR 507)WASHINGTONAVE SECHANNELIZATION NOTES:
GENERAL
””
SIGNING NOTES:
14
TYPICAL SIGN LOCATION DETAIL
CASE 1 CASE 2
STREET SIGN INSTALLATION DETAIL PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
15 CHANNELIZATION AND SIGNING DETAILS
16 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
17 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
18 TRAFFIC CONTROL DETAILSPRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21 TESC PLANRIGHT-OF-WAY DISCLAIMER
BURIED UTILITIES IN AREA
1-811
CALL BEFORE YOU DIG
19MATCHLINE, SEE BELOWMATCHLINE, SEE ABOVE
EROSION/SEDIMENTATION CONTROL NOTES
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
20 TESC NOTES & DETAILSFILTER FABRIC FENCE SECTION FILTER FABRIC FENCE ELEVATION
INLET PROTECTION DETAIL
PRELIMINARYNOT FORCONSTRUCTIONCITY OF YELM1ST STREETSOUTH SIDEWALKIMPROVEMENTS21
21 TESC DETAILS