SR 507 J & I Saw (2)
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.
Pre-Submission Notes
August 1, 2018
J & I Power Equipment proposes to remodel an existing building currently occupied as a health
club as retail sales, service, and outdoor display of power, lawn, and farm equipment at 16910
State Route 507 SE (APN 64303100800). The proposal also includes a boundary line adjustment
between the subject property and the property to the east.
Summary of Potential Significant Issues
A design for the roundabout at Grove Road and SR 507 as identified in the Gateway Final
Environmental Impact Statement needs to be reviewed and approved by the City and
Washington State Department of Transportation before any development within the study area.
If additional Right of Way is required along SR 507 for a single lane roundabout, it would need to
be dedicated as part of the development and could impact the front parking lot.
Process
The approval process from initial concept to final occupancy consists of three steps: land use
review, civil plan review, and building life/safety review.
LAND USE
The building and 2.5 acre site was historically used as a retail lumber supply. In 2007, the building
converted to use as Health Club, which has been in continuous operation. The proposed power
equipment sales, service, and display is a similar use to the historical use of the property, however
the outdoor storage and display is an expansion of scope and scale, triggering the need for a
ministerial site plan review.
The ministerial process does not require public notice or comment and is in place to ensure the
proposed expanded use meets all the development standards of the Unified Development Code.
The application is reviewed and approved by the City’s Site Plan Review Committee.
A typical approval includes conditions designed to ensure the proposed expansion is consistent
with the development standards of the City. The project can only be denied if it will have
significant environmental impacts or is inconsistent with City, County, or State development
regulations.
The ministerial site plan review process typically takes between 4 to 6 weeks. The decision of the
Site Plan Review Committee may be appealed to the City's Hearing Examiner.
CIVIL PLAN REVIEW
The City reviews site construction plans for constructability and consistency with the City's
engineering standards and details. Civil construction plans detail all the proposed site
improvements down to the size of water and sewer lines and the location of the water meter.
Civil plans must be prepared by an engineer licensed in the State of Washington.
The City uses a third party peer review service as well as a review by City staff. A first review
typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the
initial plan set.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety and
consistency per these codes, as adopted by Washington State. Electrical permits and inspections
are through the Washington State Department of Labor and Industries.
A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed
depending on the quality of the initial plan sets.
Consistency with Development Standards
POTABLE WATER
The building is connected to City water service. It is expected that no additional water
connections will be required, but this will be confirmed during the permit review process.
Any wells onsite must be decommissioned pursuant to Washington Department of Ecology
standards, and water rights dedicated to the City.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (RPBA) installed on the water
service and a Double Check Valve Assembly on irrigation meters. A list of approved devices can
be found at Chapter 246-290-490 WAC.
The building is currently served by a 5/8-3/4 inch meter with a ¾ inch double check valve. The
check valve will need to be replaced with a ¾ inch RPBA.
WASTE WATER
The building is connected to City sewer service. It is expected that no additional sewer
connections will be required, but this will be confirmed during the permit review process.
Any commercial use that potentially generates Fats, Oils, or Greases (FOG) are required to
remove FOG from the wastewater before it enters the City’s wastewater treatment system,
including the S.T.E.P. tank. An oil water separator or other approved oil removal device will be
required in the service center if there is any potential for oil to enter the wastewater treatment
system.
Any onsite septic systems must be abandoned pursuant to Thurston County Department of
Health standards.
STORM WATER
Storm water must be collected, treated, and infiltrated on the project site according to the 2014
Stormwater Management Manual for Western Washington published by the Washington
Department of Ecology. New impervious surfaces, such as the storage and display area or
relocated parking lot will trigger the need for a civil engineer to include a stormwater plan as part
of the civil plan set.
ENVIRONMENTAL
The property is part of the Yelm East Gateway Planned Action Environmental Impact Study
(Gateway EIS). This document will be adopted as the environmental review, with identified
mitigation measures adopted for the project. The Gateway EIS describes a coordinated
development structure for the properties in this area, and includes mitigation measures for the
affected environment.
Maps indicate the property contains soils moderately suitable as habitat for the Mazama Pocket
Gopher, a protected species listed on the Washington Priority Species and Habitat List as well as
the Federal Threatened Species List.
A critical areas report including a gopher survey prepared by a qualified professional will be
required at the time of application.
There is also occurrence of Townsend’s Bat in the vicinity. Any structures to be demolished
should be inspected for signs of Townsend’s Bats.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure compliance
with the provisions of the Endangered Species Act, and a federal permit may be required if pocket
gophers are found on the property. This permit would be issued through the US Fish and Wildlife
Service (360.753.5823).
TRANSPORTATION
The Gateway Final EIS established certain mitigation measures for any development within the
Gateway area. Specifically, the following transportation mitigation measures apply to the current
proposal.
1. Driveways shall be designed to accommodate the ultimate configuration of the
coordinated conceptual access plan, but based on a Site Circulation Study, may
be constructed to a lesser configuration with property and frontage improvement
setbacks to accommodate the ultimate configuration.
This condition requires the coordination of all access points within the development area, which
for the proposal includes all the properties within the study area northwest of the
SR507/WalMart Boulevard intersection. Civil plans for proposal will need to include the
coordinated access plan, which can be based on the conceptual plans of the EIS.
2. Each development within the project area shall design internal site circulation
systems to accommodate connections to adjacent properties. Internal
connections shall be designed to accommodate through- traffic within the project
area between individual parcels.
This condition furthers the requirement to coordinate all internal traffic movements, which can
be shown as part of the previous condition.
3. Prior to any development approval within the planned action area, a conceptual
design for a two -lane modern roundabout at the intersection of Grove Road and
Yelm Avenue (SR 507) shall be prepared by the applicant and reviewed and
approved by the City of Yelm and the Washington State Department of
Transportation. The design shall include a construction sequencing plan for the
construction of a single lane roundabout within the full design and shall specify
the conditions under which a two lane roundabout is required.
This condition requires the roundabout be designed and approved prior to development.
Construction of the roundabout is NOT required before development, just a notation about when
future development would trigger the construction, based on new vehicle trips. This will be a
significant design exercise and it may make sense to work with the other property owners who
would benefit from design to contribute financially or as an alternative, a latecomers agreement
is a possibility.
6. Prior to any development approval within the planned action area, a conceptual
design for the completion of the Walmart Boulevard ( SR 510 Alt) and Yelm
Avenue ( SR 507) intersection shall be prepared by the applicant and approved by
the City of Yelm and the Washington State Department of Transportation. The
design shall include a construction sequencing plan for the construction of:
a. A new northbound approach with a dedicated left turn lane and a
combined through /right turn lane
b. Improving the southbound approach with a dedicated left turn lane, a
dedicated through lane, and a dedicated right turn lane.
c. Improving the westbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through /right turn lane.
d. Improving the eastbound approach with a dedicated left turn lane, a
dedicated through lane and a combined through / right turn lane.
This condition is similar to the previous condition except for the SR 507 intersection. As stage 2
of the Yelm Loop is currently underway, there is an opportunity to coordinate this design with
the work being completed by the Washington State Department of Ecology.
7. Any development approval within the planned action area shall require the
dedication of any necessary right of way for a single lane roundabout and the
initial intersection improvement at Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt). No buildings, parking, or other impediments shall be permitted
within the future right of way for the two lane roundabout at Grove Road and the
full intersection improvements of Yelm Avenue (SR 507) and Walmart Boulevard
(SR 510 Alt).
Once the right of way needs are identified through the plans required above, the necessary right
of way needs to be dedicated as part of the project. This could likely impact the parking lot in
front of the building and trigger the need to relocate required parking.
SITE DESIGN
The Large Lot Commercial zone is intended to provide for the location of facilities and services
needed by the traveling public and which depend more heavily on convenient vehicular access.
The Large Lot Commercial zone requires that 70 percent of the original tract to be kept in a single
lot.
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas, pedestrian access between buildings, corner
enhancements, and mailbox clusters on site.
Features required include screening of outdoor storage and service areas, landscaping including
an internal perimeter landscape, planter strips and street trees with frontage improvements,
parking lot landscaping and landscape requirements for above ground stormwater facilities.
Site planning measures include relating development to street fronts, connected streets and
pedestrian access, and corner enhancements.
Minimum parking requirements are 1 space for every 250 square feet of gross floor area. A
standard parking stall is 9’x20’ with a maximum of 25% of the required stalls as compact stalls.
The building at 8300 square feet requires 34 parking stalls. There are 39 parking stalls in the
existing lot, which meets the minimum requirements if the parking lot is not required to be
relocated.
The outdoor display areas for equipment may be required to be surfaced if the American’s with
Disabilities Act or the Stormwater Management Manual require an assessable path or impervious
surfaces. Your engineer should be aware of these standards and will help determine the
appropriate design for the display areas.
BUILDING DESIGN
Building setbacks are 15 feet from the front, side and rear property lines, with a maximum
building height of 55 feet. The building is existing and meets this requirement.
Fees & Charges
LAND USE REVIEW
Ministerial Site Plan Review with BLA $250
Boundary Line Adjustment (if submitted separately) $250
CIVIL PLAN REVIEW
City Staff Review $250
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Plan Review Based on value
Building Permit Based on value
These notes are based solely on the site plan and description submitted on July 25, 2018. They
are meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposed project with all regulations.