Loading...
902 Algiers (3) The City of Yelm is an equal opportunity employer and provider PRE-SUBMISSION NOTES May 20, 2020 Ryan and Stephanie Cruz have opened a fitness center in 2 units located within the Nisqually Plaza shopping center. The fitness center is a change of use, based on the Standard Industrial Classification Manual, and requires a ministerial site plan review approval. The two units, 1A & 1C were previously retail sales, with Unit 1A being retail space, and Unit 1C storage. The units are located 902 Algiers Drive. (parcel 22730110203). The property is zoned Commercial (C-1). *Items noted in preliminary review: *RPBA *Delineate outdoor use from traffic movement PROCESS The approval process from initial concept to final occupancy consists of three steps: land use review, civil plan review, and building life/safety review. LAND USE The building is existing and previous use has been retail sales with storage space. Converting the space to a fitness center/place of assembly is a change of use, and is subject to the Ministerial Site Plan Review process. Review typically takes between 2 -4 weeks to receive approval. The decision may be appealed to the City's Hearing Examiner. CIVIL PLAN REVIEW Civil plans are required for the construction of driveways, parking areas, stormwater treatment and public infrastructure. Civil plans must be prepared by an engineer licensed in the State of Washington. BUILDING LIFE/SAFETY Yelm has adopted the International Building Codes and reviews building plans for life/safety and consistency per these codes, as adopted by Washington State. Electrical permits and inspections are through the Washington State Department of Labor and Industries. Page 2 of 3 CONSISTENCY WITH DEVELOPMENT STANDARDS POTABLE WATER Water connections are based on a consumption rate of 875 cubic feet a month. The units are served by a master meter in Nisqually Plaza. A brief review of other fitness centers in town without shower facilities, it is not expected that additional water connections will be required. All commercial buildings and irrigation systems are required to provide for cross-connection control through the provisions of a back flow prevention device (reduced pressure backflow assembly) installed on the water services. A list of approved devices can be found at Chapter 246-290-490 WAC. The backflow device is required to be installed after the meter and tested by a certified backflow tester. There is an old double check valve at the meter that does not meet WAC standards. This will need to be upgraded to a Reduced Pressure Backflow Assembly. WASTE WATER S.T.E.P. tank sizing is governed by the Criteria for Sewage Works Design (Orange Book) published by the Washington State Department of Ecology There is a 7,500 gallon holding tank, and a 1,500 gallon STEP tank shared between this building, and the adjacent units. It would be expected that this system is adequately sized to serve the buildings and use. Food preparation requires a grease interceptor to be installed. There are options for grease interceptor size and location, based on the size of the use. The grease interceptor must be designed by a licensed engineer and reviewed by the City. If additional water connections are required, additional sewer connections will also be required. STORM WATER Stormwater must be collected, treated, and infiltrated on the project site. The engineer preparing the civil plans will determine the required level of treatment and will prepare a storm water plan to the City for review as part of the civil plan review process. The City has adopted the most recent version of the Washington State Department of Ecology Storm Water Manual. ENVIRONMENTAL The project is exempt from SEPA pursuant to Section 18.20.020 YMC. Page 3 of 3 TRANSPORTATION Ingress and egress at the site shall be consistent with the Yelm Development Guidelines, Section 4B.140. Use of the outdoor area behind the building must not impede any vehicle travel, and emergency vehicle access. Outdoor areas for customers should be clearly marked and curbing or other barriers to be provided to protect customers from vehicle movement. PARKING On-site parking meets current development standards. SITE DESIGN The Unified Development Code includes standards for parking lot design and landscaping, requires adequately sized service areas. Features required include screening of outdoor storage and service areas, landscaping including an internal perimeter landscape, and landscape requirements for above ground stormwater facilities. Refuse areas are to be enclosed and landscaped. All buildings and site improvements must meet current Americans with Disabilities Act (ADA) requirements. FEES & CHARGES LAND USE REVIEW Ministerial Site Plan Review $250 CIVIL PLAN REVIEW City Staff Review $250 Consultant Review Actual Cost BUILDING PERMIT REVIEW Sewer SDC (per ERU) $6,394 Water SDC (per ERU) $6,725 Traffic Impact Fee (per new Peak PM Trip) $1,497 Fire Impact Fee (per square foot of building) 0.36 These notes are based solely on the site plan and description submitted May, 2020. They are meant to map out the process for approval and to point out any potential conflicts with City standards and are NOT meant to fully review the propose