Loading...
External RE Follow up from Presubmission meetingTami, Per your attached NPR Recycling Civil Plans, on Sheet C3.1, in the center of the page there is clearly a note that says, “Gravel Yard Storage Area – Strip top 4” sod and fine grade. Add 6” CSBC compacted to 95%. Also, per your attached ICE Storage Yard Plans, on Sheet C2.1, on the left side of the plan, there is clearly a note that says, “Compacted Gravel Storage Yard” and per Detail 1/C3.4, it shows 10” CSTC compacted to 95% on top of compacted native soil. Based on our conversation last week regarding our proposed contractor storage yard, these two drawings are in conflict with what we were told was going to be required by the City. It was our understanding that we would have to either A) pave all areas or B) install a sand/geotextile/clean crushed grid system under all storage areas, but no evidence of either of those options are shown on the civil plans you sent over for similar applications. We were specifically told that simply grading, compacting, and adding compacted crushed rock would not be acceptable for our equipment/materials storage area. However, that is exactly what both of these drawings show. Please clarify. Thank you, Kelson McClung Mike McClung Construction Co. MIKEMCC981KB o: (360) 761-7695 f: (360) 761-7529 c: (253) 397-9049 From: Tami Merriman <tamim@Yelmwa.gov> Sent: Thursday, November 5, 2020 8:27 AM To: Steve McClung <steve@mcclungconstruction.com>; Kelson McClung <kelson@mcclungconstruction.com> Subject: RE: Follow up from Presubmission meeting. Civil plan approval for the NPR auto wrecking yard. Tami Merriman, Associate Planner 360.458.8496 www.yelmwa.gov <http://www.yelmwa.gov/> From: Tami Merriman Sent: Thursday, November 5, 2020 7:42 AM To: 'steve@mcclungconstruction.com' <steve@mcclungconstruction.com <mailto:steve@mcclungconstruction.com> >; 'kelson@mcclungconstruction.com' <kelson@mcclungconstruction.com <mailto:kelson@mcclungcon struction.com> > Subject: RE: Follow up from Presubmission meeting. Steve & Kelson I am not able to find the approved plans for the auto wrecking yard at this time. I will keep looking and get them to you as soon as they are located. Tami Merriman, Associate Planner 360.458.8496 www.yelmwa.gov <http://www.yelmwa.gov/> From: Tami Merriman Sent: Thursday, November 5, 2020 6:38 AM To: 'steve@mcclungconstruction.com' <steve@mcclungconstruction.com <mailto:steve@mcclungconstruction.com> >; 'kelson@mcclungconstruction.com' <kelson@mcclungconstruction.com <mailto:kelson@mcclungcon struction.com> > Subject: Follow up from Presubmission meeting. Attached please gopher preliminary reviews that have been used in other land use approvals. Tami Merriman, Associate Planner 360.458.8496 www.yelmwa.gov <http://www.yelmwa.gov/>