PRE-SUBMISSION NOTES
NOVEMBER 4, 2020
Danelle Prengel proposes to develop the property located at 1411 Yelm Avenue West into a
retail or service establishment, as well as possibly subdividing the parcel. This parcel
received Site Plan Review Approval in 2004, however the project never moved forward, the
paved parking area onsite was installed without approval and does not meet City of Yelm
Development Standards, so the any use on this site is subject to a new Site Plan Review
Approval. The property is zoned Commercial (C-1). Retail and service establishments are
allowed uses on this site.
PROCESS
The approval process from initial concept to final occupancy consists of three steps: land
use review, civil plan review, and building life/safety review.
LAND USE
The application materials did not propose a specific use onsite. As previous approvals have
expired, any permitted use would be required to be approved through the administrative site
plan review process.
The administrative site plan review process allows notification of the application to
surrounding property owners, but does not trigger a public hearing. A complete application
will be routed to the City Public Works Department, Thurston County, and other state
agencies (including the Department of Transportation) for comment.
If the use proposed falls into the special use category, the process includes notification of
the application to surrounding property owners, and requires a public hearing before the
Hearing Examiner.
Subdivision of land requires preliminary and final subdivision approval. Due to the size and
shape of the parcel, and that Yelm Avenue West is a limited access State Highway, it would
be beneficial to subdivide the property through the binding site plan process.
After the review process, City staff will begin to craft the approval. A typical approval
includes conditions designed to ensure the proposal is consistent with the development
standards of the City. The project can only be denied if it will have significant environmental
impacts or is inconsistent with City, County, or State development regulations.
The administrative site plan review process typically takes between 8 to 12 weeks. The
decision may be appealed to the City's Hearing Examiner.
Page 2 of 4
Special use and subdivision approvals typically take between 12 – 16 weeks.
Building elevations, site utility screens and refuse enclosure details showing compliance
with City of Yelm Design Guidelines shall be submitted with the site plan review application.
CIVIL PLAN REVIEW
Civil plans are required for the construction of driveways, parking areas, stormwater
treatment and public infrastructure. Civil plans must be provided to show compliance with
the most current Stormwater Management Manual for Western Washington.
BUILDING LIFE/SAFETY
Yelm has adopted the International Building Codes and reviews building plans for life/safety
and consistency per these codes, as adopted by Washington State. Electrical permits and
inspections are through the Washington State Department of Labor and Industries.
CONSISTENCY WITH DEVELOPMENT STANDARDS
ENVIRONMENTAL
Maps indicate the property contains soils moderately suitable as habitat for the Mazama
Pocket Gopher, a protected species listed on the Washington Priority Species and Habitat
List as well as the Federal Threatened Species List.
If there is evidence of pocket gopher activity on the property, a critical areas report would be
required. If a critical areas report is required, it must be prepared by a qualified
professional.
Compliance with Yelm’s requirements under the Critical Areas Code does not ensure
compliance with the provisions of the Endangered Species Act, and a federal permit may be
required if pocket gophers are found on the property. This permit would be issued through
the US Fish and Wildlife Service (360.753.5823).
All of Yelm is considered a critical aquifer recharge area. Protection measures for
development within a critical aquifer recharge area are met through treating and disposing
of stormwater through an approved stormwater system.
TRANSPORTATION
Ingress and egress at the site shall be consistent with the Yelm Development Guidelines,
Section 2.10.100. There is one existing access on Yelm Avenue. Any additional access
would be reviewed for safety and distance between driveways.
This section of Yelm Avenue is a Class 4 Managed Access Highway, which means driveways
should be spaced minimum of 250 feet apart or from an intersection for traffic flow;
however, WAC 468-52-040 (6) allows for restricted accesses based in part on distance and
orientation from an intersection.
Frontage improvements are required at the time of development. Yelm Avenue is completed
to City Standards.
Page 3 of 4
PARKING
The requirements for off-street parking and their design shall be regarded as the minimum;
however, the owner, developer, or operator of the premises for which the parking facilities
are intended shall be responsible for providing adequate amounts and arrangement of
space for the particular premises even though such space is in excess of the minimum set
forth.
Section 18.54.030 YMC requires the following:
Sale of consumption of food: 1 stall per 200 sq. ft. of Gross Floor area
Retail: 1 stall per 250 sq. ft. of Gross Floor area
Professional Office: 1 stall per 300 sq. ft. of Gross Floor area
The site must provide appropriate Fire Department vehicle access. Access lane widths are
determined by building size and height. This includes driveway radius and internally.
SITE DESIGN
The Unified Development Code includes standards for parking lot design and landscaping,
requires adequately sized service areas. Features required include screening of outdoor
storage and service areas, landscaping including an internal perimeter landscape, and
landscape requirements for above ground stormwater facilities. Refuse areas are to be
enclosed and landscaped. Illumination requirements are found at Section 18.59.050 YMC
and include standards for walkway and parking lot lighting.
Perimeter landscape includes an 8’ planter strip with a combination of evergreen and
deciduous trees, and ground cover. Parking lot landscaping requires landscaped islands,
and no parking stall be located more than 50 feet from a tree.
POTABLE WATER
The property is located in the City of Yelm’s water service area, and is not currently
connected to City water service. The site must be disconnected from the well, and a
protective well radius must be established.
Connection to City water service is required. There is an existing 8 inch water main located
in Yelm Avenue West. Water connections are based on a consumption rate of 875 cubic feet
a month. The number of water connections cannot be determined at this time, but at the time
application for a specific proposed use.
The Civil engineer shall provide estimated water calculations at the time of civil plan review
to determine the number of water connections needed to serve the project.
All commercial buildings and irrigation systems are required to provide for cross-connection
control through the provisions of a back flow prevention device (reduced pressure backflow
assembly) installed on the water services. A list of approved devices can be found at
Chapter 246-290-490 WAC. The backflow device is required to be installed after the meter
and tested by a certified backflow tester.
Page 4 of 4
WASTE WATER
The property is located in the City of Yelm’s STEP sewer system service a 6 inch sewer main
located in Yelm Avenue West. The main will need to be tapped for service line. Connection
to City sewer service is required. Sewer connections are based on the water consumption
rate of 875 cubic feet a month.
Any on-site septic systems will need to be abandoned prior to site plan review approval.
Food preparation requires a grease interceptor to be installed. There are options for grease
interceptor size and location, based on the size of the use. The grease interceptor must be
designed by a licensed engineer and reviewed by the City. If additional water connections are
required, additional sewer connections will also be required.
STORM WATER
Stormwater must be collected, treated, and infiltrated on the project site. The engineer
preparing the civil plans will determine the required level of treatment and will prepare a
storm water plan for the City to review as part of the civil plan review process. The City has
adopted the most recent version (2019) of the Washington State Department of Ecology
Storm Water Manual. (SWMMWW). Civil plans must show the existing system to meet these
standards, or be upgraded.
All buildings and site improvements must meet current Americans with Disabilities Act (ADA)
requirements.
FEES & CHARGES
LAND USE REVIEW
Ministerial Site Plan Review $250
Administrative Site Plan Review $750
Short Subdivision $750
CIVIL PLAN REVIEW
Civil Plan Application $250
City Staff Review $54 per Hour
Consultant Review Actual Cost
BUILDING PERMIT REVIEW
Building Permit Based on Valuation
Sewer SDC (per ERU) $6,394
Water SDC (per ERU) $6,725
Traffic Facilities Charge (per new pm peak hr trip) $1,497
Fire Impact Fee (per new square foot) 0.36
These notes are based solely on the site plan and description submitted October, 2020. They are
meant to map out the process for approval and to point out any potential conflicts with City
standards and are NOT meant to fully review the proposal.