Loading...
206 3rd St SE (2) 1 | P a g e PRE-SUBMISSION NOTES JULY 28, 2021 Michael Holman and Michael Blank propose to hold Kazoku Judo Club practices at Emanuel Lutheran Church, located at 206 3rd St SE Assessor’s Tax Parcel number 64420800100. The addition of a judo club is considered change of use, as well as an additional tenant within a building permitted for a single use. The property is zoned Central Business District (CBD). Churches and service-oriented establishments are allowed uses in this zone. PROCESS The approval process from initial concept to final occupancy consists of three steps: land use review, civil plan review, and building life/safety review. LAND USE Churches and service establishments are allowed uses in the Central Business District (CBD). As the use is permitted in the CBD, the additional tenant requires a ministerial site plan review. The ministerial review is an administrative review and does not require notification of the application to surrounding property owners, nor does it require a public hearing before the Hearing Examiner. A complete application will be routed to the City Public Works Department for comment. City staff reviews the application, and provides an approval with conditions to bring the site into consistency with the development regulations of the Unified Development Code. The ministerial site plan review process typically takes between 4 to 6 weeks. CIVIL PLAN REVIEW Civil plans are required for the construction of driveways, parking areas, stormwater treatment and public infrastructure. Civil plans must be provided to show compliance with the most current Stormwater Management Manual for Western Washington. The City may use a third party peer review service as well as a review by City staff. A first review typically takes 3 to 4 weeks. Additional reviews may be needed depending on the quality of the initial plans sent. BUILDING LIFE/SAFETY – MAY NOT BE REQUIRED 2 | P a g e Yelm has adopted the International Building Codes and reviews building plans for life/safety and consistency per these codes, as adopted by Washington State. Electrical permits and inspections are through the Washington State Department of Labor and Industries. A first review of structural plans typically takes 2 to 3 weeks. Additional reviews may be needed depending on the quality of the initial plans set. CONSISTENCY WITH DEVELOPMENT STANDARDS ENVIRONMENTAL The project is exempt from SEPA review. TRANSPORTATION Frontage improvements are required. McKenzie Ave SE and 3rd St SE are not constructed to City standards. At this time the City would be in favor of approving a deferral of frontage improvements. This requires the property owner to sign a deferral agreement, where the owner agrees to participate in any local improvements made by others for the construction of frontage improvements for a period of 15 years. Transportation facility charges are based on the new pm peak hour trips generated on the site. Credit is given for the existing use. There is not currently a trip generation rate for specialty athletic clubs. The closest trip rate to use is a health/fitness club. This creates a trip generation of 4.06 trips per 1,000 square feet during the peak pm hour of traffic. Churches create a trip generation rate of 1.41 trips per 1,000 square feet during the peak pm hour of traffic. At the time of building permit, a report will be necessary to prove that no additional pm peak hour trips are generated. The site plan submitted did not estimate the square footage of the building used for judo club practices. PARKING The requirements for off-street parking and their design shall be regarded as the minimum; however, the owner, developer, or operator of the premises for which the parking facilities are intended shall be responsible for providing adequate amounts and arrangement of space for the particular premises even though such space is in excess of the minimum set forth. Section 18.54.030 YMC requires the following for assembly areas with less-concentrated use such as conference rooms and gymnasiums: One space for each 10 occupants based on the maximum occupant load per the International Building Code. All parking areas shall be surfaced with asphalt, concrete or similar pavement so as to provide a permanent all-weather surface that is durable and dust-free and shall be so graded and drained as to properly dispose of all surface water. Gravel surfaces are not acceptable or approved surface material. 3 | P a g e One ADA space is required for every 25 parking spaces. At least one space is required to be van accessible. SITE DESIGN Perimeter landscape includes an 8’ planter strip with a combination of evergreen and deciduous trees, and ground cover. Parking lot landscaping requires landscaped islands, and no parking stall be located more than 50 feet from a tree. Site planning amenities include increased landscaping when parking is adjacent to the street, providing pedestrian amenities such as pedestrian furniture, transit stop, and/or decorative screen wall. More detailed description may be found at Section 18.36.040 (J) YMC. Street corners require corner enhancement pursuant to Section 18.59.060 YMC. Corner enhancement can include substantial landscaping of at least 200 square feet at or near the corner of the lot, a decorative screen wall at least 3 feet high, a trellis or other continuous architectural element with a length of at least 20 ft along the front property line, and/or a pedestrian walkway from the corner to building entry. Additional perimeter landscaping and corner enhancement will not be needed if no additional building square footage is proposed. POTABLE WATER The property is connected to City water service. With the addition of the judo club, it is not anticipated that additional water connections would be required. All commercial buildings and irrigation systems are required to provide for cross-connection control through the provisions of a back flow prevention device (reduced pressure backflow assembly) installed on the water services. A list of approved devices can be found at Chapter 246-290-490 WAC. The backflow device is required to be installed after the meter and tested by a certified backflow tester. Fire hydrants with hydrant locks are required based on the International Fire Code. WASTE WATER The property is connected to City sewer service. If additional water connections are required, additional sewer connections will also be required. STORM WATER Stormwater must be collected, treated, and infiltrated on the project site. The engineer preparing the civil plans will determine the required level of treatment and will prepare a storm water plan for the City to review as part of the civil plan review process. The City has adopted the most recent version (2019) of the Washington State Department of Ecology Storm Water Manual (SWMMWW). Civil plans must show the existing system to meet these standards, or be upgraded. 4 | P a g e BUILDING The judo club and church will share the same space at different times. Both uses are considered an A Assembly Occupancy. The hazards associated with the use of these two occupancy classes in one building does not require a fire rated occupancy separation. 5 | P a g e FEES & CHARGES LAND USE REVIEW Ministerial Site Plan Review $250* CIVIL PLAN REVIEW Civil Plan Application $250 City Staff Review $54 per Hour Consultant Review Actual Cost BUILDING PERMIT REVIEW Building Permit Based on Valuation Traffic Facilities Charge (per new pm peak hr trip) $1,497 County Recording Fees Actual Cost **Fees subject to change These notes are based solely on the site plan and description submitted July, 2021. They are meant to map out the process for approval and to point out any potential conflicts with City standards and are NOT meant to fully review the proposal. 6 | P a g e 7 | P a g e