Loading...
LDS - KPFF Cmt Ltr 051309 - LFkpff Consulling Engineers May 13,2009 Steve Hanington City of Yelm Community Development Department SUBJECT: Yelm L.D.S. Church 10423 Clark Rd SE, Folder Sequence #09-102963 Thurston County Project #: 2007104764 Construction Review RE: Redline Plans dated April22,2009 Dear Mr. Hanington: We have received comments from the City of Yelm and or¡r response is as follows: Sewer Comments: 1.As previously discussed with City of Yelm personnel in January regarding the STEP sewer alignment, it was established that this property lies at the edge of its sewer basin. Properties to the south lie in a separate basin and we were informed by city personnel that it was not necessary to continue the STEP main all across the property frontage. A sewer cleanout and subject detail has been added to the plans The proposed connection to the existing sewer main has been detailed on the plans. The service connection to the property has been revised to eliminate the 45-degree bends. The STEP pipeline callouts have been amended to include fabrication specifications. This specification has been added to the plans. The proposed service connection to the STEP main has been detailed on the plans. The STEP Ta¡k Sizing Calculations are included with this letter. 4200 6th Avenue SE, Suite 309 Lacey. WA 98503 (360) 292-7230 Fax (360) 292-7231 seattle Everctt lacona Lacey Portland Eusene sanFrancisco sacnnento LosAnselos Pasadena bvine sanùieco PhoaKff:l:.l13grû MAY 1 I 2C09 ) 3. 4. 5. 6. 7. 9. Water Usage Data for the property is included with this letter. 10. The STEP Tank Detail on sheet C4.5 has been revised. Water Comments (Addressed Clockwise from Left): 1. The existing well is to be decommissioned as a part of this project. This notation appears on the Existing Conditions and Demolition Plan and has been added to the Onsite Composite Utility Plan. 2. Reduced Pressure Backflow Assemblies (RPBA's) have been called out on the plan at the existing meter location. 3. The inigation meter has been relocated to the planting strip between the sidewalk and roadway and the RPBA has been called out at this location. 4. The City of Yelm water meter detail has been added to sheet C4.4. 5. The requested note concerning testing of RPBA's has been added to sheet c4.0. Engineering Civil Comments : 1. The existing 8" water main in Clark Road has been enhanced on sheet C4.0 and specifically called out. 2. The STEP main has not been extended across the property frontage. Please see the response to Sewer Comment #1. 3. The City of Yelm Reduced Pressure Backflow Assembly (RPBA) detail has been added to sheet C4.5. If you have any further questions or comments, please feel free to contact me at (360) 292-7230 or by email at nancy.whaley@.kpff.com. Sincerely, 4 *, a/,¿0Ò Nancy M. Whaley Design Engineer cc: GaryHochstrasser,HochstrasserAssociatesArchitects Project File