Loading...
KPFF Comment Ltr 061709koff Consulling Engineers June 1,7,2009 Steve Hanington City of Yelm Community Development Department SUBJECT: Yelm L.D.S. Church 10423 Clark Rd SE, Folder Sequence #09-102963 Thurston County Project #: 2007104764 Construction Review RE: Redline Plans dated June 3,2009 Dear Mr. Hanington: We have received comments from the City of Yelm and our response is as follows: Drawing C4.0 (Clockwise from Upper Right): Item 6 in the Composite Utility Plan Notes has been revised to reference Yelm Detail 7-7 onDrawing C4.3. An additional note (#11) regarding the 4" End of Line Cleanout has been added to the drawing. The note regarding the 4"x2" reducing tee has been revised. The Cleanout callout has been revised to indicate "End of Line." A note requiring the Sewer Line to be encased in a sleeve at the water line crossing has been added to the plans. The RIM Elevation of the STEP Tank has been added to the plans. The water data and sizing calculations are attached to this letter. The STEP Tank is to be installed in the area of lawn between the new building addition and the parking arca,adjacent to the existing sidewalk. The only traffic in this area will be lawn maintenance and pedestrian traffic. The note regarding installation of the pump control panel has been updated. 4200 6th Avenue SE, Suite 309 Lacey, WA 98503 (360) 292-7230 Fax (360) 292-7231 1. 2. 3. 4. 5. 6. 7. 8. Seattle Everett Tacoma Lacoy Poñland Eugane San Frunclsco Sacnmonto Los Angoles Pasadena lnlne San Dlegt ,nw?ffË. lV$tÉrüt JUN 1 r ?0û9 9. Note 6 regarding the sanitary sewer cleanout has been revised. See #1 above. Drawing C4.1 (Clockwise from Upper Right): 1. Gate Valve callouts have been revised to reflect the MJ x MJ requirement. 2. The need for Thrust Blocking was previously noted, but has been enlarged on the plans. 3. The need for Thrust Blocking was previously noted, but has been enlarged on the plans. Drawing C4.2: 1. The Reducing Tee callout has been revised. Drawing C4.3: 1. We are unable to edit City of Yelm standard details. The redlined sheet has been scanned and is now included as part ofthe sheet set. Drawing C4.4: l. We are unable to edit City of Yelm standard details. The redlined sheet has been scanned and is now included as part ofthe sheet set. Drawing C4.5: 1. The STEP Tank Detail has been revised to reflect the redline comments. If you have any fruther questions or comments, please feel free to contact me at (360) 292-7230 or by email at nancy.whaley@kpff.com. Sincerely, 2""-%- Nancy M. Whaley Design Engineer cc: GaryHochstrasser,HochstrasserAssociatesArchitects Project File