Loading...
2020.0029 MU - Civil Eng Approval LTR Page 1 of 2 October 22, 2021 Casey Peterson Peterson Brothers, LLC PO Box 2983 Yelm, WA 98597 RE: Civil Engineering Approval – Stevens Street 4Plex (Application # 2021.0040.CI0006) City of Yelm Project No. MU 2020.0029 Location: Parcel # 64423400100 Dear Mr. Peterson: The City of Yelm has completed the final review of the Stevens Street 4Plex located on Parcel 64423400100. Your application included:  Civil Plans (dated September 1, 2021 stamped by James Edward Gibson, PE)  Landscape Plan (dated September 1, 2021)  Stormwater Site Plan (dated December 15, 2020)  Construction Stormwater Pollution Prevention Plan (dated December 15, 2020)  Operations & Maintenance Manual (dated December 15, 2020) We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed during the construction process. 1. You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting, provide the City with an updated Construction SWPPP with the CESCL and on-site contact information. 2. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. 3. A request from the engineer of record must be presented for any changes requested to the plans. 4. The engineering review invoice must be paid in full before the preconstruction meeting. Page 2 of 2 5. Prior to the installation of lights not shown on civil engineering plans, submit illumination plans that meets the requirements of the City of Yelm Municipal Code Section 18.59.050. At the time of project closeout the improvements will require final inspection / acceptance before a final Certificate of Occupancy can be issued by the Building Official. This final inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following documents will be uploaded as required through this form; 1. As-Build Plans 2. Engineer Construction Report – Stormwater Facilities 3. Applicable O/M Manuals 4. Construction Inspection & Testing Logs 5. Special Test Results & Reports If you have any additional questions or comments please do not hesitate to call or contact me at derekm@yelmwa.gov or call me at (253) 278-2937. Respectfully City of Yelm Public Service Department - Engineering Derek M. McCoy, PE Civil Review Engineer Cc: Valeska Rae - C&E Development Jim Gibson, PE - JE Gibson Engineering & Consulting Mark Cantrell – Knight Fire Protection