Loading...
2021.0482.CI0018 CPR1 Response Ltr 10.26.2021LARSON AND ASSOCIATES W W W.RRLARSON.COM October 26, 2021 Derek M. McCoy, P.E. City of Yelm Public Services Department - Engineering 106 2nd Street SE Yelm, WA 98597 Subject: Response to 1 st Civil Engineering Review Comments, Cruz Auto Dealership, Application #2021.0482.010018, City of Yelm Project No. MU 2020.0010 Dear Mr. McCoy. The following are responses to your comments October 6, 2021. Your comments are shown italicized; our responses are provided below each comment. Storm Report: 1. Prior to final construction approval, provide the City with an updated Construction SWPPP with the CESCL and on-site contact information. An updated Construction SWPPP with the CESCL and on-site contact information will be provided at the pre -construction meeting by the site contractor and/or owner's representative. Given the porosity of the on-site native soils no off-site discharge is anticipated but there will be a SWPPP and site CESCL as necessary to assist with erosion control as necessary. Plannina (Land Use): 2. Provide label and sign that the access proposed at the current driveway entrance serving the residence shall operate as a restricted right in/right out until the time the SR 510 Yelm Loop roundabout is complete. A construction note has been added to the civil plans to install proper signage at the proposed access which shall remain until such time that the Yelm Loop is complete. 3. Include pedestrian path from office building to commercial building. The pedestrian path has been extended on the civil plans to the commercial building exterior. 4. Show cluster mailboxes or state that mail will not be received on the property. Refer to the attached USPS Planning Standards and include any appropriate USPS details and notes. 9027 Pacific Avenue, Suite 4, Tacoma WA 98444 Office (253) 474-3404 Fax (253) 473-7358 The property owner currently receives mail via USPS post office box. No USPS mail will be received on the property. 5. Show refuse enclosure and landscaping pursuant to Section 18.59.040 YMC. The refuse enclosure was relocated near the southeast corner of the commercial building per previous City comment. Details for the refuse enclosure will be provided as part of the building plans. 6. 3 regular ADA stalls and I van accessible stall are required. Locate at least one ADA stall at each building. The required minimum of ADA stalls is shown on the revised civil plans with at least 1 ADA stall at each building. 7. Legend includes proposed chain link fencing but the proposed location of this is not clear to Planning. As the Legend on the civil plans indicates, chain link fencing is proposed parallel with the west, south and east property lines, on the inside edge of the perimeter bioretention swales and landscaping. Chain link fencing is also proposed around the proposed storm pond. Sanitary Sewer & Water Plan: 8. Revise to extend the 4" Sewer main and 8" water from a point further west so it can be extended at the time that the future road is constructed. Yelm Water Department has provided redline conceptual sketch of what they would like to see. The 4" sewer and 8" water mains have been revised per the sketch from Yelm Water Department. 9. Water meter and sewer service box should be between the east edge of the proposed right-of-way and the edge of Display Area Asphalt. See Water Department sketch. The water meter and sewer box have been relocated per the Yelm Water Department sketch. 10. Water main would need to be extended through the Display Area to provide Fire Flow but only a water and sewer service line would be required to the building and STEP tank. The 8" water main has been extended to the proposed fire hydrant. Separate water and sewer service lines have been extended from the relocated water meter and sewer box to the commercial building and STEP tank, respectively. Frontage Improvements: 11. Deferral agreements for frontage improvements on SR 507 and pedestrian access at the time the roundabout is constructed shall be signed and recorded as part of project closeout. The deferral agreements were received and forwarded to the property owner for execution. 12. These agreements have been included as an attachment, owner of the property (One]I Holdings LLC) must sign and notarize the agreements and return to Yelm City Hall. Notarization is offered at City Hall for no cost when required for a project. See response to comment # I I above. Landscape / Irrieation Plans: 13. Include label showing material ofpedestrian path The cement concrete walk is described and labeled on the civil plans. 14. 2 parking planter areas do not have trees each parking planter needs at least I tree. The landscape plans have been updated to include at least 1 tree in each parking planter. M isc. Information: 15. Provide a blank box for an approval block on the civil engineeringplans on all sheets. Civil Review Engineer will affix a digital approval stamp here. :1larkups contain a red box for suggested placement. (typical all sheets) An approval block has been added to all sheets. 16. Latecomer's fee of $46,942.69 is due. The invoice was received and forwarded to the property owner for payment. Sincerely, 24OY1411111U� Grant J. Middleton, P.E. President