Loading...
2020.0010 MU - Civil Eng Approval LTR 11.17.2021 Page 1 of 2 November 17, 2021 Ryan Cruz Cruz Developments, LLC 9935 Cochrane Ave Yelm, WA 98597 RE: Civil Engineering Approval – Cruz Auto Dealership (Application # 2021.0482.CI0018) City of Yelm Project No. MU 2020.0010 Location: 17041 Yelm Ave E (WA-507) Parcel # 64303200300 Dear Mr. Cruz: The City of Yelm has completed the final review of the Cruz Auto Dealership located on Parcel 64303200300. Your application included:  Civil Plans (dated November 1, 2021 stamped by Grant J. Middleton, PE)  Landscape Plan (dated November 16, 2021 stamped by Katherine Owens, LSA)  Lighting Plans (dated Oct 12,2021 stamped by Jacob Colby Meulink, PE)  Stormwater Site Plan (rev August 18, 2021)  Construction Stormwater Pollution Prevention Plan (rev July 9, 2021)  Operations & Maintenance Manual (rev July 9, 2021) We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed during the construction process. 1. You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting, provide the City with an updated Construction SWPPP with the CESCL and on-site contact information. 2. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. 3. A request from the engineer of record must be presented for any changes requested to the plans. 4. The engineering review invoice must be paid in full before the preconstruction meeting. Page 2 of 2 5. Prior to the installation of lights not shown on civil engineering plans, submit illumination plans that meets the requirements of the City of Yelm Municipal Code Section 18.59.050. At the time of project closeout the improvements will require final inspection / acceptance before a final Certificate of Occupancy can be issued by the Building Official. This final inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following documents will be uploaded as required through this form; 1. As-Build Plans 2. Engineer Construction Report – Stormwater Facilities 3. Applicable O/M Manuals 4. Construction Inspection & Testing Logs 5. Special Test Results & Reports If you have any additional questions or comments please do not hesitate to call or contact me at derekm@yelmwa.gov or call me at (253) 278-2937. Respectfully City of Yelm Public Service Department - Engineering Derek M. McCoy, PE Civil Review Engineer Cc: Grant Middleton, PE - Larson & Associates Katherine Owens – Nature by Design Landscape Architecture