Loading...
109138228_SITE_DRAFT3 Lv 'I - VI I 00 N N 00 n rn 0 rn 0') LO rn O (n E v 3 Q) rn .3 U 0 Q c L 0 3 3 Q U E 0- C'4 LO I N O N U N r) STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 1. NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED OUTAGE. 2. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARD 2525.2300. 3. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. 4. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 5. INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 2550.1600. 6. REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. 7. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400 AND PSE GAS FIELD PROCEDURE 4700.1500. 8. PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. 9. INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100. 10. PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING STANDARDS 2525.2100 AND 2525.3600. 11. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. 12. INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 13. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. 14. REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. 15. ACTIVE SERVICES TO BE REPLACED DENOTED BY: _ 16. MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200. 17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND 4700.1310. 18. WHEN INSTALLING, DEACTIVATING, REPAIRING, OR OTHERWISE MODIFYING A PIPELINE THAT IS LOCATED WITHIN 200 FEET OF ANY ACTIVE REGULATING STATION, PRESSURE RELIEF AND LIMITING DEVICE, OR SINGLE SERVICE FARM TAP WHERE GAS SYSTEM ENGINEERING REVIEW AND APPROVAL IS REQUIRED PER GAS OPERATING STANDARDS. SEE REVIEW DOCUMENTS, PROVIDED BY ENGINEERING. 19. FIELD TO VERIFY THAT ALL PROPER SERVICE ACTIONS (FOLLOWING THE KEY TO SERVICE ACTION LEGEND) HAVE BEEN ACCOUNTED FOR PER THE "SERVICE CHECKLIST". IF A RISER IS FOUND IN THE FIELD AND WASN'T ACCOUNTED FOR, FIELD PERSONNEL SHALL CONFIRM WHETHER THE RISER IS AN ABANDONED OR IDLE RISER: 19.1 IF IT IS AN ABANDONED RISER, CONTACT THE POINT DESK TO REQUEST GFR TO REMOVE IT. 19.2 IF IT IS AN IDLE RISER, REPORT THE RISER TO THE PROJECT MANAGER SO THAT THE PROJECT MANAGER MAY CONFIRM WITH THE CUSTOMER WHETHER THEY WOULD LIKE TO KEEP THE SERVICE AND RISER. THE PROJECT MANAGER MAY INSTRUCT TO TEST AND TIE THE SERVICE IF THE CUSTOMER WANTS GAS OR DOESN'T PROVIDE PSE A RESPONSE IN A TIMELY MANNER. KEY TO SERVICE ACTION T&T TEST & TIE SERVICE ### REPLACE COMPLETE SVC T&T ### REPLACE STUB AND TEST & TIE EXTENSION SAP BATCH YEAR & FOOTAGE SIZE OF RETIRED MAIN MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT ACTUAL LENGTH OF RETIREMENT 8" PE 109026608 2008 400' Ind. Service N/A N/A Ind. MSA N/A N/A Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 N/A GAS MAIN PRESSURE & TESTING TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME APPROVED BY T.FAY PRESSURE TEST RESULTS ❑ P ❑ F E -Mail: tony.fay&pse.com TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY LEGEND Detail Number 1 2 PIPE :Sheet Location of Detail SEGMENT (a dash if on some sheet as the Plot Plan) Section Letter A 2 :,Sheet Location of Section CP APPROVAL DATE REQUIRED GASSED UP PIPELINE FOREMAN'S DATE NAME FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION) ❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 ❑ Reviewed and complied with all construction notes. ❑ Recorded all required information on the as -built per GOS 2500.1700. ❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700. ❑ Left the work area in a clean and safe condition. Foreman's Signature Foreman's Name (printed) Company: Date 4680 06/11 STANDARD GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE -CALL" TWO WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 5. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7. COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG 12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14. PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400. 15. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. N/A , PHONE N/A 17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS -BUILT IN RED.( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18. EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) Backfill for Direct Bury - The final backfill may be soil -based select material or native soil, but free of construction debris and shall not contain rocks larger than 10" -in. diameter to prevent impedence of gas system maintenance. VEHICLE ACCESS Excavated Dirt Pile SIDE 12"-18" Min24" Min Final Grade /i.. \\/ r\\\ 12" Min. of /\; Acceptable Backfill Cover /�\\� /j� (See Definition Above) / NOTE: Install 12" shading if the backfill contains rocks .. J 6" Sand Shading' greater than 6" dia. 4" Sand Bedding Gas Main Line TYPICAL GAS MAINLINE TRENCH DETAIL Not to scale PROJECT PHASE Notification # GAS MAIN INSTALLATION/RETIREMENT Type/Work Pipe Size Type Est Length Act Lgth Manufacturer SCAT 8" PE 400' RETIRE 8" PE 400' Service/Meter N/A N/A Service/Meter N/A N/A Ind. Service N/A N/A Ind. MSA N/A N/A Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 N/A GAS MAIN PRESSURE & TESTING TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME APPROVED BY T.FAY PRESSURE TEST RESULTS ❑ P ❑ F E -Mail: tony.fay&pse.com TYPE TEST ❑ SOAP ❑ AIR ❑ NITROGEN ❑ WATER DATE ON / / START TIME TESTED BY DATE OFF / / STOP TIME PRESSURE TEST RESULTS ❑ P ❑ F JOINT FACILITIES ARRANGEMENTS ❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 DESIGN PRESSI 60 1 SYS MAOP 2023 02/18 N/A N/A N/A PROJECT PHASE Notification # Order # GAS SAP Superior 11719202 109138228 Service/Meter N/A N/A Service/Meter N/A N/A Service/Meter N/A N/A Service/Meter N/A N/A Ind. Service N/A N/A Ind. MSA N/A N/A Dis. Reg. / FT N/A N/A HP Svc/MSA N/A N/A Relocate N/A N/A Retirement I N/A 108630302 Project Manager Contact Information: Emer Sect 344 Manager: TONY FAY APPROVED BY T.FAY Cell Phone: (253) 213-2514 CP APPROVAL N/A E -Mail: tony.fay&pse.com 1/4 SEC SE 24-17-01E Vicinity Map N/A rto Vallarta p 510 a° EI Rey oqp s emy v.nry Rr McDonald's IpYelm Middle School 41 Toho a Valley If Course9 Yelm City Pa SITE andsplas .;, h Arc SECochrane //Z"' Memorial Park 9F Owner/ Developer Contact Info CITY OF YELM N/A N/A ATTN: PATRICK HUGHES (360) 458-8499 office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG 00 N 00 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Locates Required" Yes ❑ "Flagging Required" Yes ❑ No ❑ No ❑ REAL ESTATE/EASEMENT N/A PERMIT YELM REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 PROJECT MGR T.FAY 253-213-2514 11/2/21 ® ENGR - GAS N/A N/A N/A 10 DRAWN BY .WALKER-PAU 253-625-0964 12/9/21 CHECKED BY COUNTY THURSTON Emer Sect 344 GAS WK CTR CSPPGPM APPROVED BY T.FAY 253-213-2514 CP APPROVAL N/A N/A N/A 1/4 SEC SE 24-17-01E OP MAP 280.038 PLAT MAP 283.043 PC APPROVAL N/A N/A N/A MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUG ET SOUND ENERGY DESIGNED BY PSE PI - SW MOSMAN AVE IMPROVEMENTS 8" PE IP MAIN RELOCATE SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597 SAP Sup Order Nbr 109138228 Drawi N/Aumber SCALE N/A PAGE 1 / 3 Ld I 00 N N 00 n rn 0 / rn 0') LO rn / v 0 / co .3 U 0 Q IZ L 0 3 3 Q U E 0- 00 I N 0 N U N 0 DEACTIVATE IN PLACE EXISTING 8" MPE IP MAIN --4 D C' ° � O o' CO 8" MPE IP 5'N, 6f Ptr- C- - 1-08926688 — -- IP GAS FLOW i 4+50.00 G� / G POLYVALVE 2" MPE (OPEN) SCALE: 1" = 20'-0" WITH VALVE BOX & SUPPORT 5'N P/L & 144'W C/L ___'N C/L & ___'W C/L PROPOSED PIPE 8" MPE IP MAIN 5'N 9/1- ___'N C/L PROPOSED TIE INE — COUPLING 8" ELECTROFUSION 5'N P/L & 148'W C/L (STA:14+92) _-- _ C/L & ---'W C/L .`J0- ��Q 5 V s nQ PS��p� MINIMUM 60" BELOW GRADE ELBOW 8"X90° MPE 5'N P/L & 141'W C/L -'X C/L & ___'X C/L PROPOSED PIPE 8" MPE IP MAIN 9'S C/L TO 2'N P/L ___'_ C/L TO '_ C/L TEE TAP 8"X1-1 /8" MPE (INJECTION TEE) N C/L & ___'W C/L PROPOSED PIPE 8" MPE IP MAIN 5'N 9/1- ___'N C/L ELBOW 8"X90° MPE 5'N P/L & 140'W C/L (STA:15+00) ___'N C/L & ___'W C/L DETAIL Scale: None PROPOSED PIPE 8" MPE IP MAIN 141'W C/L ___'W C/L PROPOSED PIPE 8" MPE IP MAIN 141'W C/L ___'W C/L ELBOW 8"X90° MPE 19'X C/L & XX'X C/L ___'X C/L & ___'X C/L PROPOSED PIPE 8" MPE IP MAIN 9'S C/L ___'S C/L 5/8" MPE IP 218'W 2000 T&T 410 ELBOW 8"X90° MPE 14S C/L & 249'E C/L (STA:19+00) ___'S C/L & ___'E C/L TEE TAP 8"X1-1/8" MPE (PURGE TEE) 'S C/L & ___'E C/L PROPOSED PIPE 8" MPE IP MAIN 249'E C/L ___'E C/L ELBOW 8"X90° MPE 9'S C/L & 249'E C/L S C/L & ___'E C/L PROPOSED PIPE 8" MPE IP MAIN 249'E C/L ___'E C/L 4680 06/11 am - COUPLING 8" ELECTROFUSION 14'S C/L & 250'E C/L (STA: 19+01) S C/L & ___'E C/L MINIMUM 60" BELOW GRADE ELBOW 8"X90° MPE 14'S C/L & 249'E C/L S C/L & ___'E C/L DETAIL Scale: None 5/8" MPE IP 124'W 1995 For contacts below dial 1 -888 -CALL PSE (225-5773) CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES REAL ESTATE/EASEMENT N/A PERMIT YELM REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 PROJECT MGR T.FAY 253-213-2514 11/2/21 ® ENGR - GAS N/A N/A N/A 10 DRAWN BY .WALKER-PAU 253-625-0964 12/9/21 CHECKED BY COUNTY THURSTON Emer Sect 344 GAS WK CTR CSPPGPM APPROVED BY T.FAY 253-213-2514 CP APPROVAL N/A N/A N/A 1/4 SEC SE 24-17-01E OP MAP 280.038 PLAT MAP 283.043 PC APPROVAL N/A N/A N/A MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUGET PI - SOUND ENERGY DESIGNED BY PSE SW MOSMAN AVE IMPROVEMENTS 8" PE IP MAIN RELOCATE SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597 SAP Sup Order Nbr 109138228 Drawi N/Aumber SCALE 1" = 20' PAGE 2/3 NOTES & REDLINES Ld I 00 N N 00 n O O O O LO O (0 rn E v N Q) rn .3 U 0 Q c L O 3 3 Q U E Q cfl Ln N O N U N r) FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION) ❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 ❑ Reviewed and complied with all construction notes. ❑ Recorded all required information on the as -built per GOS 2500.1700. ❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700. ❑ Left the work area in a clean and safe condition. Foreman's Signature Foreman's Name (printed) Company: 4680 06/11 Date For contacts below dial 1 -888 -CALL PSE (225-5773) CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES REAL ESTATE/EASEMENT N/A PERMIT YELM REV# DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 PROJECT MGR T.FAY 253-213-2514 11/2/21 ® ENGR - GAS N/A N/A N/A 10 DRAWN BY .WALKER-PAU 253-625-0964 12/9/21 CHECKED BY COUNTY THURSTON Emer Sect 344 GAS WK CTR CSPPGPM APPROVED BY T.FAY 253-213-2514 CP APPROVAL N/A N/A N/A 1/4 SEC SE 24-17-01E OP MAP 280.038 PLAT MAP 283.043 PC APPROVAL N/A N/A N/A MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUG ET PI - SOUND ENERGY DESIGNED BY PSE SW MOSMAN AVE IMPROVEMENTS 8" PE IP MAIN RELOCATE SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597 SAP Sup Order Nbr 109138228 Drawi N/Aumber SCALE N/A PAGE 3/3