STANDARD IP & LP GAS
REPLACEMENT CONSTRUCTION NOTES
1. NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
OUTAGE.
2. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS
OPERATING STANDARD 2525.2300.
3. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
4. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
5. INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER
PSE GAS OPERATING STANDARD 2550.1600.
6. REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
7. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400
AND PSE GAS FIELD PROCEDURE 4700.1500.
8. PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
9. INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100.
10. PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
STANDARDS 2525.2100 AND 2525.3600.
11. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.
12. INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
13. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
14. REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
15. ACTIVE SERVICES TO BE REPLACED DENOTED BY: _
16. MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200.
17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND
4700.1310.
18. WHEN INSTALLING, DEACTIVATING, REPAIRING, OR OTHERWISE MODIFYING A PIPELINE THAT IS LOCATED WITHIN 200
FEET OF ANY ACTIVE REGULATING STATION, PRESSURE RELIEF AND LIMITING DEVICE, OR SINGLE SERVICE FARM TAP
WHERE GAS SYSTEM ENGINEERING REVIEW AND APPROVAL IS REQUIRED PER GAS OPERATING STANDARDS. SEE
REVIEW DOCUMENTS, PROVIDED BY ENGINEERING.
19. FIELD TO VERIFY THAT ALL PROPER SERVICE ACTIONS (FOLLOWING THE KEY TO SERVICE ACTION LEGEND) HAVE BEEN
ACCOUNTED FOR PER THE "SERVICE CHECKLIST". IF A RISER IS FOUND IN THE FIELD AND WASN'T ACCOUNTED FOR,
FIELD PERSONNEL SHALL CONFIRM WHETHER THE RISER IS AN ABANDONED OR IDLE RISER:
19.1 IF IT IS AN ABANDONED RISER, CONTACT THE POINT DESK TO REQUEST GFR TO REMOVE IT.
19.2 IF IT IS AN IDLE RISER, REPORT THE RISER TO THE PROJECT MANAGER SO THAT THE PROJECT MANAGER MAY
CONFIRM WITH THE CUSTOMER WHETHER THEY WOULD LIKE TO KEEP THE SERVICE AND RISER. THE PROJECT
MANAGER MAY INSTRUCT TO TEST AND TIE THE SERVICE IF THE CUSTOMER WANTS GAS OR DOESN'T PROVIDE
PSE A RESPONSE IN A TIMELY MANNER.
KEY TO SERVICE ACTION
T&T TEST & TIE SERVICE
### REPLACE COMPLETE SVC
T&T
### REPLACE STUB AND
TEST & TIE EXTENSION
SAP BATCH YEAR & FOOTAGE
SIZE OF
RETIRED
MAIN
MATERIAL
RETIRED
ORIGINAL
JOB
ORIGINAL
YEAR
PROPOSED
LENGTH OF
RETIREMENT
ACTUAL
LENGTH OF
RETIREMENT
8"
PE
109026608
2008
400'
Ind. Service N/A
N/A
Ind. MSA N/A
N/A
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
N/A
GAS MAIN PRESSURE & TESTING
TYPE TEST
❑ SOAP ❑ AIR ❑ NITROGEN
❑ WATER
DATE ON
/ / START TIME
TESTED BY
DATE OFF
/ / STOP TIME
APPROVED BY T.FAY
PRESSURE
TEST RESULTS ❑ P ❑ F
E -Mail: tony.fay&pse.com
TYPE TEST
❑ SOAP ❑ AIR ❑ NITROGEN
❑ WATER
DATE ON
/ / START TIME
TESTED BY
LEGEND
Detail Number
1
2 PIPE
:Sheet Location of Detail SEGMENT
(a dash if on some sheet
as the Plot Plan)
Section Letter
A
2
:,Sheet Location of Section
CP APPROVAL
DATE REQUIRED
GASSED UP PIPELINE
FOREMAN'S DATE
NAME
FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION)
❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
❑ Reviewed and complied with all construction notes.
❑ Recorded all required information on the as -built per GOS 2500.1700.
❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700.
❑ Left the work area in a clean and safe condition.
Foreman's Signature
Foreman's Name (printed)
Company: Date
4680 06/11
STANDARD GAS CONSTRUCTION NOTES:
1. FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE -CALL" TWO WORKING DAYS PRIOR TO
CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
2. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
3. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
4. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
5. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER
FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE
OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS
OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
6. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE
APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
7. COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST
LEAD) INSTALLATION.
8. PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
9. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY
ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
10. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
11. SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG
12. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
13. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
14. PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400.
15. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.
N/A , PHONE N/A
17. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS -BUILT IN RED.( ') DENOTES FOOTAGE
BETWEEN FITTINGS.
18. EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)
Backfill for Direct Bury - The final backfill may be soil -based select material or native soil, but
free of construction debris and shall not contain rocks larger than 10" -in. diameter to prevent
impedence of gas system maintenance.
VEHICLE
ACCESS Excavated Dirt Pile
SIDE 12"-18"
Min24" Min
Final Grade
/i..
\\/ r\\\ 12" Min. of
/\; Acceptable Backfill
Cover /�\\� /j� (See Definition Above)
/ NOTE: Install 12" shading
if the backfill contains rocks
.. J 6" Sand Shading' greater than 6" dia.
4" Sand Bedding
Gas Main Line
TYPICAL GAS MAINLINE TRENCH DETAIL
Not to scale
PROJECT PHASE Notification #
GAS MAIN INSTALLATION/RETIREMENT
Type/Work
Pipe Size Type Est Length Act Lgth Manufacturer
SCAT
8" PE 400'
RETIRE
8" PE 400'
Service/Meter N/A
N/A
Service/Meter N/A
N/A
Ind. Service N/A
N/A
Ind. MSA N/A
N/A
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
N/A
GAS MAIN PRESSURE & TESTING
TYPE TEST
❑ SOAP ❑ AIR ❑ NITROGEN
❑ WATER
DATE ON
/ / START TIME
TESTED BY
DATE OFF
/ / STOP TIME
APPROVED BY T.FAY
PRESSURE
TEST RESULTS ❑ P ❑ F
E -Mail: tony.fay&pse.com
TYPE TEST
❑ SOAP ❑ AIR ❑ NITROGEN
❑ WATER
DATE ON
/ / START TIME
TESTED BY
DATE OFF
/ / STOP TIME
PRESSURE
TEST RESULTS ❑ P ❑ F
JOINT FACILITIES ARRANGEMENTS
❑ TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
DESIGN PRESSI 60 1 SYS MAOP
2023 02/18
N/A N/A N/A
PROJECT PHASE Notification #
Order #
GAS SAP Superior 11719202
109138228
Service/Meter N/A
N/A
Service/Meter N/A
N/A
Service/Meter N/A
N/A
Service/Meter N/A
N/A
Ind. Service N/A
N/A
Ind. MSA N/A
N/A
Dis. Reg. / FT N/A
N/A
HP Svc/MSA N/A
N/A
Relocate N/A
N/A
Retirement I N/A
108630302
Project Manager Contact Information:
Emer Sect
344
Manager: TONY FAY
APPROVED BY T.FAY
Cell Phone: (253) 213-2514
CP APPROVAL N/A
E -Mail: tony.fay&pse.com
1/4 SEC
SE 24-17-01E
Vicinity Map
N/A
rto Vallarta
p
510
a° EI Rey oqp
s
emy v.nry Rr
McDonald's
IpYelm Middle School
41
Toho a Valley
If Course9
Yelm City Pa
SITE andsplas
.;,
h Arc SECochrane
//Z"' Memorial Park
9F
Owner/ Developer Contact Info
CITY OF YELM
N/A
N/A
ATTN: PATRICK HUGHES (360) 458-8499 office
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
00
N
00
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Locates Required" Yes ❑
"Flagging Required" Yes ❑
No ❑
No ❑
REAL ESTATE/EASEMENT
N/A
PERMIT
YELM
REV# DATE BY
DESCRIPTION
FUNCTION CONTACT
PHONE NO DATE
3
PROJECT MGR T.FAY
253-213-2514 11/2/21
®
ENGR - GAS N/A
N/A N/A
10
DRAWN BY .WALKER-PAU
253-625-0964 12/9/21
CHECKED BY
COUNTY
THURSTON
Emer Sect
344
GAS WK CTR
CSPPGPM
APPROVED BY T.FAY
253-213-2514
CP APPROVAL N/A
N/A N/A
1/4 SEC
SE 24-17-01E
OP MAP
280.038
PLAT MAP
283.043
PC APPROVAL N/A
N/A N/A
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A N/A N/A
N/A
CONTACT
N/A N/A N/A
N/A
PHONE#
N/A N/A N/A
N/A
PUG ET
SOUND
ENERGY
DESIGNED BY PSE
PI - SW MOSMAN AVE IMPROVEMENTS
8" PE IP MAIN RELOCATE
SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597
SAP Sup Order Nbr
109138228
Drawi N/Aumber
SCALE
N/A
PAGE
1 / 3
Ld
I
00
N
N
00
n
rn
0
/
rn
0')
LO
rn
/
v
0
/
co
.3
U
0
Q
IZ
L
0
3
3
Q
U
E
0-
00
I
N
0
N
U
N
0
DEACTIVATE IN PLACE
EXISTING 8" MPE IP MAIN
--4
D C'
° � O
o' CO
8" MPE IP 5'N, 6f Ptr- C-
- 1-08926688 — --
IP GAS FLOW
i
4+50.00
G�
/ G
POLYVALVE 2" MPE (OPEN)
SCALE: 1" = 20'-0" WITH VALVE BOX & SUPPORT
5'N P/L & 144'W C/L
___'N C/L & ___'W C/L
PROPOSED PIPE 8" MPE IP MAIN
5'N 9/1- ___'N C/L
PROPOSED TIE INE —
COUPLING 8" ELECTROFUSION
5'N P/L & 148'W C/L (STA:14+92)
_-- _ C/L & ---'W C/L
.`J0-
��Q 5
V s nQ PS��p�
MINIMUM 60"
BELOW GRADE
ELBOW 8"X90° MPE
5'N P/L & 141'W C/L
-'X C/L & ___'X C/L
PROPOSED PIPE 8" MPE IP MAIN
9'S C/L TO 2'N P/L
___'_ C/L TO '_ C/L
TEE TAP 8"X1-1 /8" MPE
(INJECTION TEE)
N C/L & ___'W C/L
PROPOSED PIPE 8" MPE IP MAIN
5'N 9/1- ___'N C/L
ELBOW 8"X90° MPE
5'N P/L & 140'W C/L (STA:15+00)
___'N C/L & ___'W C/L
DETAIL
Scale: None
PROPOSED PIPE 8" MPE IP MAIN
141'W C/L ___'W C/L
PROPOSED PIPE 8" MPE IP MAIN
141'W C/L ___'W C/L
ELBOW 8"X90° MPE
19'X C/L & XX'X C/L
___'X C/L & ___'X C/L
PROPOSED PIPE 8" MPE IP MAIN
9'S C/L ___'S C/L
5/8" MPE IP 218'W
2000
T&T
410
ELBOW 8"X90° MPE
14S C/L & 249'E C/L (STA:19+00)
___'S C/L & ___'E C/L
TEE TAP 8"X1-1/8" MPE
(PURGE TEE)
'S C/L & ___'E C/L
PROPOSED PIPE 8" MPE IP MAIN
249'E C/L ___'E C/L
ELBOW 8"X90° MPE
9'S C/L & 249'E C/L
S C/L & ___'E C/L
PROPOSED PIPE 8" MPE IP MAIN
249'E C/L ___'E C/L
4680 06/11
am
- COUPLING 8" ELECTROFUSION
14'S C/L & 250'E C/L (STA: 19+01)
S C/L & ___'E C/L
MINIMUM 60"
BELOW GRADE
ELBOW 8"X90° MPE
14'S C/L & 249'E C/L
S C/L & ___'E C/L
DETAIL
Scale: None
5/8" MPE IP 124'W
1995
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
REAL ESTATE/EASEMENT
N/A
PERMIT
YELM
REV# DATE BY DESCRIPTION
FUNCTION CONTACT
PHONE NO DATE
3
PROJECT MGR T.FAY
253-213-2514 11/2/21
®
ENGR - GAS N/A
N/A N/A
10
DRAWN BY .WALKER-PAU
253-625-0964 12/9/21
CHECKED BY
COUNTY
THURSTON
Emer Sect
344
GAS WK CTR
CSPPGPM
APPROVED BY T.FAY
253-213-2514
CP APPROVAL N/A
N/A N/A
1/4 SEC
SE 24-17-01E
OP MAP
280.038
PLAT MAP
283.043
PC APPROVAL N/A
N/A N/A
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A
N/A N/A
N/A
CONTACT
N/A
N/A N/A
N/A
PHONE#
N/A
N/A N/A
N/A
PUGET PI -
SOUND
ENERGY
DESIGNED BY PSE
SW MOSMAN AVE IMPROVEMENTS
8" PE IP MAIN RELOCATE
SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597
SAP Sup Order Nbr
109138228
Drawi N/Aumber
SCALE
1" = 20'
PAGE
2/3
NOTES & REDLINES
Ld
I
00
N
N
00
n
O
O
O
O
LO
O
(0
rn
E
v
N
Q)
rn
.3
U
0
Q
c
L
O
3
3
Q
U
E
Q
cfl
Ln
N
O
N
U
N
r)
FITTER'S CHECKLIST (CHECK BOX TO CONFIRM COMPLETION)
❑ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
❑ Reviewed and complied with all construction notes.
❑ Recorded all required information on the as -built per GOS 2500.1700.
❑ Completed post installation inspection per GOS 2525.1200 and 2525.2700.
❑ Left the work area in a clean and safe condition.
Foreman's Signature
Foreman's Name (printed)
Company:
4680 06/11
Date
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
REAL ESTATE/EASEMENT
N/A
PERMIT
YELM
REV# DATE BY DESCRIPTION
FUNCTION CONTACT
PHONE NO DATE
3
PROJECT MGR T.FAY
253-213-2514 11/2/21
®
ENGR - GAS N/A
N/A N/A
10
DRAWN BY .WALKER-PAU
253-625-0964 12/9/21
CHECKED BY
COUNTY
THURSTON
Emer Sect
344
GAS WK CTR
CSPPGPM
APPROVED BY T.FAY
253-213-2514
CP APPROVAL N/A
N/A N/A
1/4 SEC
SE 24-17-01E
OP MAP
280.038
PLAT MAP
283.043
PC APPROVAL N/A
N/A N/A
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A
N/A N/A
N/A
CONTACT
N/A
N/A N/A
N/A
PHONE#
N/A
N/A N/A
N/A
PUG ET PI -
SOUND
ENERGY
DESIGNED BY PSE
SW MOSMAN AVE IMPROVEMENTS
8" PE IP MAIN RELOCATE
SW MOSMAN AVE & SOLBERG ST SW, YELM, WA 98597
SAP Sup Order Nbr
109138228
Drawi N/Aumber
SCALE
N/A
PAGE
3/3