105098782 THE MEADOWS AT MILL PONDN
Vicinity Map
46.9359, -122.6115
Owner / Developer Contact Info
officeATTN:
RUSH RESIDENTIAL, INC
6622 WOLLOCHET DR
GIG HARBOR, WA 98335
JOE FLANSBURG 253.858.3636
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
511881653 105098782
N/A 105099387
N/A N/A
N/A N/A
N/A N/A
N/A N/A
511881654 107061204
N/A 106381434
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Street Light
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105098782107061204Phone
INTOLIGHT Contact Information:
LARS LARSON
425.456.2701
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
C.GESTRING 253.234.6394 1.13.22
C. GESTRING 253.234.6394 1.13.22
A. VASQUEZ .12.14.21
REDT # ( RW-124370 )YELM
THE MEADOWS AT MILL POND
1Ø PRIMARY U/G LINE EXTENSION - 21 S/F LOTS
P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107061204 105098782
N/A 1 OF 4
THURSTON 344 CIONC QSTHLE
30SE-T17N-R02E 284.044 284.044
1702E120 1702E116 1702E118 YEL-26
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DON BETTENCOURT
206.445.5958
Don.Bettencourt@pse.com
x
x
x
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
x
JFLANSBURG@THERUSHCOMPANIES.COM
VAULT DETAIL @ V01 - V03
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
4'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A, H2A & H3A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
SITE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED TRANSFORMER
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF3'
3'
REDUCED FLAMMABILITY
3'
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Combustible walls using a reduced-flammability transformer. Gas
service meter relief vent.3 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Generators, customer-owned transformers, fire sprinkler valves,
standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and reduced flammability oil.
100 FT
s s
s s
ssssssss s
s
s
ssssss0+75 1+00
2+00
3+00 4+00 5+00 6+00
0+42 0+50 0+56
0+080+170+250+330+40709 ABC#2ACSRFEEDYEL
26
#2ACSRABCFUSE @ 40T
SW#T86556
MON
IRR
LOT 15 LOT 14
LOT 21
LOT 13
LOT 20
LOT 19 LOT 18 LOT 17 LOT 16
LOT 6LOT 5LOT 4
LOT 11
LOT 3
LOT 10
LOT 2 LOT 9LOT 1
LOT 8
TRACT 'A'LOT 7
LOT 12
TRACT 'B'#4ACSR#4AC
S
R
B104TH PL SE
104TH AVE SE
MILL RD SEMEADOWS ROAD 1
TO BE REMOVED
58'50'
R50'
'A'
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
H1A TO METER LOCATION
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
C.GESTRING 253.234.6394 1.13.22
C. GESTRING 253.234.6394 1.13.22
A. VASQUEZ .12.14.21
REDT # ( RW-124370 )YELM
THE MEADOWS AT MILL POND
1Ø PRIMARY U/G LINE EXTENSION - 21 S/F LOTS
P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107061204 105098782
1" = 50'2 OF 4
THURSTON 344 CIONC QSTHLE
30SE-T17N-R02E 284.044 284.044
1702E120 1702E116 1702E118 YEL-26
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-26
6.11.21
260 256 272
0 18 0
260 274 272
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 600'
17 3200
115 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
P02 & ALL RELATED
FACILITIES TO BE REMOVED ON A
SEPARATE WORK ORDER # 101145190
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 H1A 1 #1 MONUMENT
-1 H1A 1 #1 IRRIGATION
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #MONUMENT
N/A
N/A
TBD
N/A
1KW
N/A
3.3 @ H1A
2.8 @ H1A
SITE SPECIFIC NOTES
At P01 (559155-147281) 1965 CLASS 3 - 40'
-INSTALL 2" PRIMARY RISER ON NEW STANDOFF BRACKETS
-STIRRUP (2254000)
-ALUM "H" CONNECTOR (2167000)
(RIS2CSS) 6042.1000
-FUSE @ 40T (3412500), TAP 'B' PHASE
-INSTALL SWITCH# T86556
-INSTALL 1Ø TERM ON NEW BI-UNIT (8721000) FIBERGLASS ARM
W/ LINKBREAK C/O & SURGE ARRESTOR (TSU1C1) 6043.1000
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #IRRIGATION
N/A
N/A
TBD
N/A
1KW
N/A
3.3 @ H1A
2.8 @ H1A
DEDICATED FACILITIES (105098782) for RF Transformers
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
V01-V03 ---REDUCED FLAMMABILITY -
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 'A'LOT 21 4 40 1 S 2 DB120 1 70 ( )' NCL GAS MAIN, PRIMARY
X02 LOT 18 LOT 2 2 40 1 W 3 DB120 1 70 ( )' ECL GAS SVC, SECONDARY
X03 LOT 16 LOT 4 2 40 1 W 3 DB120 2 70 ( )' ECL GAS SVC, SECONDARY
X04 LOT 15 LOT 5 2 40 1 E 3 DB120 2 70 ( )' ECL GAS SVC, SECONDARY
2" PVC PLUG /CAPS = 6 2" YELLOW SCH 40 PVC = 210 FT 2" DB120 GREY PVC = 70 FT 2" PVC PLUG /CAPS = 2
4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 70 FT 3" DB120 GREY PVC = 350 FT 3" PVC PLUG /CAPS = 10
COORDINATE WITH PSE ON MAINTAINING
ELECTRIC SERVICE TO EXISTING CUSTOMERS
DURING ALL PHASES OF CONSTRUCTION
→SEE PSE HANDBOOKS←
SEE 1218 (SF),1220 (MF), 6080,
FOR TRENCH SEE 3061, 2809
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANAGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
DEVELOPER TO PROVIDE TYPICAL 10' PSE
FRONTAGE EASEMENT FOR OPERATION
AND MAINTENANCE OF PSE EQUIPMENT.
EASEMENT TO BE CLEAR OF ALL BUILDING
OVERHANGS AND FOUNDATION FOOTINGS
NEW 1/O AL
EJC871BØABC#2ACSRFEEDYEL
26
#2ACSRABCFUSE @ 40T #4ACSR#4AC
S
R
B'A'
SW#T86556
NEW 1/O AL
EJC872-BØ NEW 1/O AL
EJC873-BØ
AØAAA385
BØAAA386
CØAAA387
BØAAX387
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
C.GESTRING 253.234.6394 1.13.22
C. GESTRING 253.234.6394 1.13.22
A. VASQUEZ .12.14.21
REDT # ( RW-124370 )YELM
THE MEADOWS AT MILL POND
1Ø PRIMARY U/G LINE EXTENSION - 21 S/F LOTS
P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107061204 105098782
AS SHOWN 3 OF 4
THURSTON 344 CIONC QSTHLE
30SE-T17N-R02E 284.044 284.044
1702E120 1702E116 1702E118 YEL-26
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP 1702E118
NOT TO SCALE
SITE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559162
147300
42"x48"x38"
Unistrut HH
Matid: 7663001
37.5KVA RF MP
120/240
Matid: 9995528
2 -
MINU1SL 6045.1010 BØ
V02 559162
147316
42"x48"x38"
Unistrut HH
Matid: 7663001
50kVA RF MP
120/240
Matid: 9995529
2 -
MINU1SL 6045.1010 BØ
V03 559164
147338
42"x48"x38"
Unistrut HH
Matid: 7663001
50kVA RF MP
120/240
Matid: 9995529
1 1
MINU1SR 6045.1010 BØ
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
P01 V01 2 1 130 -1 --67 134 1/0 AL JKT 235 -EJC871 --0.9
V01 V02 2 1 170 ----96 96 1/0 AL JKT 180 -EJC872 --0.7
V02 V03 2 1 230 --2 -125 120 1/0 AL JKT 240 -EJC873 --1.0
2" PVC (FT) & BENDS =530 0 1 2 0 1/0 AL JKT TOTAL (FT) =655 TTL (Gal.) = 2.6
SITE
MON
IRR
'A'
LOT 15 LOT 14
LOT 21
LOT 13
LOT 20
LOT 19 LOT 18
LOT 17 LOT 16
LOT 6LOT 5LOT 4
LOT 11
LOT 3
LOT 10
LOT 2
LOT 9
LOT 1
LOT 8
LOT 7
LOT 12
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
H1A TO METER LOCATION
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
C.GESTRING 253.234.6394 1.13.22
C. GESTRING 253.234.6394 1.13.22
A. VASQUEZ .12.14.21
REDT # ( RW-124370 )YELM
THE MEADOWS AT MILL POND
1Ø PRIMARY U/G LINE EXTENSION - 21 S/F LOTS
P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107061204 105098782
N/A 4 OF 4
THURSTON 344 CIONC QSTHLE
30SE-T17N-R02E 284.044 284.044
1702E120 1702E116 1702E118 YEL-26
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
NOT TO SCALE
NEW CONDUIT DIAGRAM
1.
2.
3.
4.
5.
ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD
6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL".
ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET
PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE
POLE.
BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN
6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.)
APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE
REQUIRED.
THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC
(NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO
AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THE
DEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUS
GRAVEL AT EACH STREET LIGHT LOCATION.
IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE
MUST BE LEVELED.
DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET
LIGHT TUBE.
6.
NOT TO SCALE
STREET LIGHT TUBE DETAIL
Plan View Detail
of Street Light Tube
Wire Entrance
Slot
Street Light
Tube
Field
Side
Road
Side
Wire
Entrance Slot
45°
45°
Position 3" x 6" wire entrance slot 45 degrees
left or right from a line perpendicular to road-
way through center of tube.
Field Side
3" x 6" Wire
Entrance Slot
45°
45°
Street light tube
set 2" below grade.
Road Side
18" - 24" Minimum
Depending on
Pole Type
5'-0"
20"
26"
STREET LIGHT CIRCUITRY TABLE - 105099387
SITE
#FROM
CABLE INFO AS-BUILT
REMARKSTYPELFTYPELENGTH
FL1 -#6 CIC -- BY INTOLIGHT
FL2 -#6 CIC -- BY INTOLIGHT
FL3 -#6 CIC -- BY INTOLIGHT
FL4 -#6 CIC -- BY INTOLIGHT
SL1 -#6 CIC -
SL2 -#6 CIC -
SL3 -#6 CIC -
SL4 -#6 CIC -
SL5 -#6 CIC -
SL6 -#6 CIC -
TOTAL FT =###TOTAL FT =
STREET LIGHT TABLE (BY INTOLIGHT)
SITE
#
STATION
OFFSET
POLE LUMINAIRE TUBE
WO #
(INTOLIGHT)
BILLING
SCH.GRID #INTOLIGHT
TAG #TYPE ARM MTG HT.WATTS STYLE TUBE
LENGTH
TUBE
DIAMETER
SL1 -XXXXX
XXXXX ----------
SL2 -XXXXX
XXXXX ----------
SL3 -XXXXX
XXXXX ----------
SL4 -XXXXX
XXXXX ----------
SL5 -XXXXX
XXXXX ----------
SL6 -XXXXX
XXXXX ----------
SL7 -XXXXX
XXXXX ----------
SL8 -XXXXX
XXXXX ----------
SL9 -XXXXX
XXXXX ----------
SL10 -XXXXX
XXXXX ----------
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CUST. OWNED
ST. LT. CIC #6
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 5 - SEPL6 6050.1000
H2A PEDESTAL 5 - SEPL6 6050.1000
H3A PEDESTAL 4 - SEPS4 6050.1000
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 155 3 85 4 3.3 2.8
V01 LOT 18 4/O 65 60 3 65 1 3.9 3.5
V01 LOT 19 4/O 10 60 3 10 1 3.5 3.0
V01 LOT 20 4/O 10 60 3 10 1 3.5 3.0
V01 LOT 21 4/O 70 60 3 70 1 3.9 3.6
H1A LOT 1 4/O 60 3 4.0 3.4 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H1A LOT 2 4/O 60 3 4.0 3.4 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V02 H2A 350 120 3 120 2 3.3 2.0
V02 LOT 3 4/O 85 60 3 15 3 3.6 3.2
V02 LOT 4 4/O 85 60 3 15 2 3.6 3.2
V02 LOT 16 4/O 10 60 3 10 1 3.1 2.4
V02 LOT 17 4/O 10 60 3 10 1 3.1 2.4
H2A LOT 5 4/O 95 60 3 25 2 4.4 3.5 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H2A LOT 6 4/O 95 60 3 25 3 4.4 3.5 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H2A LOT 14 4/O 60 3 4.1 3.1
H2A LOT 15 4/O 60 3 4.1 3.1
V03 H3A 350 135 3 135 2 2 3.0 2.1
V03 LOT 10 4/O 80 115 3 80 1 1 3.3 3.1 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V03 LOT 11 4/O 55 105 3 55 1 1 3.8 3.7
V03 LOT 12 4/O 10 60 3 10 1 2.9 2.4
V03 LOT 13 4/O 10 60 3 10 1 2.9 2.4
H3A LOT 7 4/O 45 60 3 45 1 4.2 3.6
H3A LOT 8 4/O 60 3 3.9 3.2
H3A LOT 9 4/O 75 3 4.1 3.5
4/O UG Triplex (ft) =735 3" PVC & BENDS (ft)=795 29 0 4 0
350 UG Triplex (ft) =410 TOTAL QTS OF GLUE 3.0