Loading...
107061204 THE MEADOWS AT MILL POND APPROVEDs s s s ssssssss s s sssssss0+75 1+00 2+00 3+00 4+00 5+00 6+00 0+42 0+50 0+56 0+080+170+250+330+4021'W24'S 26'S 10'N 423'N 24'W709 FLOWLOT 15 LOT 14 LOT 21 LOT 13 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 6LOT 5LOT 4 LOT 11 LOT 3 LOT 10 LOT 2 LOT 9LOT 1 LOT 8 TRACT 'A'LOT 7 LOT 12 TRACT 'B'6" MPE IP 14'S 9808506 4" MPE IP 16'E96120791-1/4" MPE1997104TH PL SE 104TH AVE SE MILL RD SEMEADOWS ROAD 1 4" MPE IP 16'E961207958'50' R50'9612079ELEC ONLY 30'S N Vicinity Map 46.9362, -122.6103 Owner / Developer Contact Info officeATTN: RUSH RESIDENTIAL, INC 6622 WOLLOCHET DR GIG HARBOR, WA 98335 JOE FLANSBURG 253.858.3636 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105098782 107061204 Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol:install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL D. BETTENCOURT 206.445.5958 . C. GESTRING 253.234.6394 1.13.22 A. VASQUEZ . 12.14.21 REDT # ( RW-124370 )YELM THE MEADOWS AT MILL POND 2" MPE-___ GAS MAIN EXTENSION - 21 S/F LOTS P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597 PUGET SOUND ENERGY 107061204 105098782 1" = 50' 1 OF 2 THURSTON 344 CIONC 30SE-T17N-R02E 284.044 284.044 COMCAST TED AXTELL 253.878.2794 WAVE BROADBAND . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 511881654 107061204 N/A 106381434 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2" MPE-___ 4 FT JOINT 2" MPE-___ 689 FT .. .. .. .. .. .. .. .. Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:DON BETTENCOURT 206.445.5958 Don.Bettencourt@pse.com 60 IP 344-60 N/A N/A SITE PLAN xx INSTALL 2" = 4 FT JOINT 2" = 689 FT ... ... ... SITE JFLANSBURG@THERUSHCOMPANIES.COM IP 344-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CFH / HOME = 125 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 'A'LOT 21 ELECTRIC ONLY 2 DB120 1 70 ( )' NCL GAS MAIN, PRIMARY X02 LOT 18 LOT 2 2 40 1 W 3 DB120 1 70 ( )' ECL GAS SVC, SECONDARY X03 LOT 16 LOT 4 2 40 1 W 3 DB120 2 70 ( )' ECL GAS SVC, SECONDARY X04 LOT 15 LOT 5 2 40 1 E 3 DB120 2 70 ( )' ECL GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 6 2" YELLOW SCH 40 PVC = 210 FT 2" DB120 GREY PVC = 70 FT 2" PVC PLUG /CAPS = 2 4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 70 FT 3" DB120 GREY PVC = 350 FT 3" PVC PLUG /CAPS = 10 4 x 2" HVTT TIE-IN 35'N C/L & 16'E C/L ______'N C/L & _____'E C/L INSTALL 2" MPE-___ 4' @ 35'N C/L (______)' @ _____'N C/L BEGIN JOINT MAIN 35'N C/L & 20'E C/L ______'N C/L & _____'E C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 35'N C/L & 25'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 684' @ 35'N C/L TO 31'N C/L TO 52'R (______)' @ _____'N C/L TO _____'N C/L TO _____'R 2" CAP EOM/WIREBOX 709'E C/L & 52'R ______'E C/L & _____'R JOINT 2" MPE-___ 5' @ 35'N C/L (______)' @ _____'N C/L THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL D. BETTENCOURT 206.445.5958 . C. GESTRING 253.234.6394 1.13.22 A. VASQUEZ . 12.14.21 REDT # ( RW-124370 )YELM THE MEADOWS AT MILL POND 2" MPE-___ GAS MAIN EXTENSION - 21 S/F LOTS P# 22730220600; 700 BLOCK MILL ROAD SE, YELM, WA 98597 PUGET SOUND ENERGY 107061204 105098782 N/A 2 OF 2 THURSTON 344 CIONC 30SE-T17N-R02E 284.044 284.044 COMCAST TED AXTELL 253.878.32794 WAVE BROADBAND . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . N/A N/A N/A ... ... ... ... EX PLAT MAP 284.044 NOT TO SCALE SITE Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS LS TWIN 2" MAIN 1 & 2 1 1/8 MPE-___70 ( ')ECL 2600 LS TWIN 2" MAIN 3 & 4 1 1/8 MPE-___70 ( ')ECL 2600 LS TWIN 2" MAIN 5 & 6 1 1/8 MPE-___70 ( ')ECL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 9 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 10 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 11 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 13 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 14 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 15 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 16 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 17 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 18 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 19 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 20 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLE 2" MAIN 21 1 1/8 MPE-___10 ( ')ECL 2600 SS SINGLES = 15 360 FT 1 1/8" PE PIPE LS TWIN = 3 NOT TO SCALE CROSS SECTION - MEADOWS ROAD 1 LOOKING EAST S 58' ROW PROP. 2" MPE IP - 35'NCL TO 31'NCL TO 52'RG N NOT TO SCALE CROSS SECTION - MILL ROAD SE LOOKING NORTH 50' ROW W G EX. 4" MPE IP - 16'ECL 9612079 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE