107061294 THE VISTA AT MILL PONDssssssssssssssssssssssssssss1+002+003+00LOT 15 LOT 16
LOT 9
LOT 17
LOT 10
LOT 18
LOT 11
LOT 12
LOT 5
LOT 13 LOT 14
LOT 24 LOT 23
LOT 22 LOT 21
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
TRACT 'A'
LOT 6
LOT 1
LOT 2
LOT 3
LOT 4
LOT 7
LOT 8
TRACT 'B'
LOT 19
LOT 20
104TH AVE SE
MILL RD SE104TH PL SE
VISTA RD 1VISTA RD 2BARRY BRIDGES ST SE24'S
26'S
10'N
5/8" MPE2004-E637'W15341
6" MPE IP 14'S
9808506
4" MPE IP 16'E96120794" MPE IP 30'S
9612079 JT
FLOW
17'E12'S 22'S
58'58'20'49'60'
R50'
R50'21'WOwner / Developer Contact Info
officeATTN:
RUSH RESIDENTIAL, INC.
6622 WOLLOCHET DR
GIG HARBOR, WA 98335
JOE FLANSBURG 253.858.3636
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
GENERAL NOTES - GAS (JOINT TRENCH):
1" = 50'105098904107061294Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two
working days prior to construction. 1-800-424-5555
Notify appropriate permitting agency prior to job start (see permit requirements).
Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion
and Sediment Control and any additional local jurisdiction requirements.
Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the
appropriate Engineer/Project Manager.
Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.
Check box on report for wire box (Test Lead) installation.
Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating
Standard 2525.2500.
To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on
this design, unless approved by the appropriate Engineer/Project Manager.
System MAOP denoted by System MAOP = 60 PSIG
Install Main Valves out of traffic where possible.
Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.
Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas
Operating Standards 2525.1200 and 2525.2300.
If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .
Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas
Field Procedures Manual 0812 and 0813.
Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.
Unless otherwise noted:
All pipes installed in plat to be 2" MPE-___.
All crossings to be Yellow 4" PVC.
All Services to be 1-1/8" PE.
/ denotes service stub location.
(________') denotes footage between fittings.
Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas
Operating Standards 2525.1500, 2525.1600 and 2525.1700.
Note all recordable footages, locations and material changes on the as-built in red.
Upon completion of the project send the print copy, along with the completed work order, listing crew & actual
materials used to the appropriate design group.
On site pre-con required before start of job.
At symbol: install natural gas main piping and fixtures. Size as indicated on tables and
work sketch (gas main is to parallel power system unless otherwise shown on work sketch).
Inclement weather conditions may cause delays in construction times and dates.
19.
20.
18.
16.
17.
15.
14.
13.
6.
9.
11.
12.
10.
8.
7.
3.
5.
4.
2.
1.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELEC Order Number
SAP Sup Order Nbr
PC APPROVAL
D. BETTENCOURT 206.445.5958 .
C.GESTRING 253.234.6394 12.16.21
S. LEWISON .12.1.21
REDT # ( RW-124176 )YELM
THE VISTA AT MILL POND
2" MPE-___ GAS MAIN EXTENSION - 29 S/F LOTS
10447 MILL RD SE, YELM, WA 98597
PUGET SOUND ENERGY
107061294
105098904
1" = 50'1 OF 2
THURSTON 344 CIONC
25SE-T17N-R01E 284.038 284.043
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
N/A N/A N/A
...
21.
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
511968941 107061294
N/A 106381786
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service Stubs
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Service/Meter
4680 06/11
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 02/18
TEST RESULTS
/ /
/ /
/ /
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
INSTALL 2"MPE-___2 FT
JOINT 2"MPE-___1,087 FT
....
....
....
....
Cell Phone:
Project Manager Contact Information:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:DON BETTENCOURT
206.445.5958
Don.Bettencourt@pse.com
60 IP 344-60
N/A N/A
SITE PLAN
xx
INSTALL 2" = 2 FT
JOINT 2" = 1,087 FT
...
...
...
JFLANSBURG@THERUSHCOMPANIES.COM
CFH / HOME = 125
N
Vicinity Map
46.9359, -122.6132
SITE
6" X 2" HVTT TIE-IN
14'S C/L & 31'E C/L
______'S C/L & _____'E C/L
INSTALL 2" MPE-___
2' @ 31'E C/L
(______)' @ _____'E C/L
BEGIN JOINT MAIN
16'S C/L & 31'E C/L
______'S C/L & _____'E C/L JOINT 2" MPE-___
17' @ 31'E C/L
(______)' @ _____'E C/L
2" POLYVALVE/OPEN
W/ BOX & SUPPORT
33'S C/L & 31'E C/L
______'S C/L & _____'E C/L
JOINT 2" MPE-___
403' @ 31'E C/L
(______)' @ _____'E C/L
2" INLINE TEE
31'S C/L & 31'E C/L
______'S C/L & _____'E C/L
JOINT 2" MPE-___
299' @ 31'S C/L TO 52'R
(______)' @ _____'S C/L TO _____'R
2" CAP EOM/WIREBOX
67'N C/L & 52'R
______'N C/L & _____'R
2" CAP EOM/WIREBOX
91'N C/L & 52'R
______'N C/L & _____'R
JOINT 2" MPE-___
368' @ 31'S C/L TO 52'R
(______)' @ _____'S C/L TO _____'R
IP 344-60
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
60
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 LOT 29 LOT 1 2 40 1 S 3 DB120 2 70 ( )' SCL GAS SVC, SECONDARY
X02 LOT 26 LOT 4
2 40 1 N 2 DB120 1 70 ( )' NCL PRIMARY
----3 DB120 2 70 ( )' NCL GAS SVC, SECONDARY
X03 LOT 26 LOT 25 4 40 1 E 2 DB120 2 30 ( )' ECL GAS MAIN, PRIMARY
X04 LOT 25 LOT 15 4 40 1 E 2 DB120 1 80 ( )' ECL GAS MAIN, PRIMARY
X05 LOT 15 LOT 25 2 40 1 E 3 DB120 1 70 ( )' ECL GAS SVC, SECONDARY
X06 LOT 13 LOT 5 2 40 1 W 3 DB120 1 70 ( )' WCL GAS SVC, SECONDARY
2" PVC PLUG /CAPS = 8 2" YELLOW SCH 40 PVC = 280 FT 2" DB120 GREY PVC = 210 FT 2" PVC PLUG /CAPS = 8
4" PVC PLUG /CAPS = 4 4" YELLOW SCH 40 PVC = 110 FT 3" DB120 GREY PVC = 420 FT 3" PVC PLUG /CAPS = 12