Loading...
107061294 THE VISTA AT MILL PONDssssssssssssssssssssssssssss1+002+003+00LOT 15 LOT 16 LOT 9 LOT 17 LOT 10 LOT 18 LOT 11 LOT 12 LOT 5 LOT 13 LOT 14 LOT 24 LOT 23 LOT 22 LOT 21 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 TRACT 'A' LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 7 LOT 8 TRACT 'B' LOT 19 LOT 20 104TH AVE SE MILL RD SE104TH PL SE VISTA RD 1VISTA RD 2BARRY BRIDGES ST SE24'S 26'S 10'N 5/8" MPE2004-E637'W15341 6" MPE IP 14'S 9808506 4" MPE IP 16'E96120794" MPE IP 30'S 9612079 JT FLOW 17'E12'S 22'S 58'58'20'49'60' R50' R50'21'WOwner / Developer Contact Info officeATTN: RUSH RESIDENTIAL, INC. 6622 WOLLOCHET DR GIG HARBOR, WA 98335 JOE FLANSBURG 253.858.3636 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105098904107061294Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL D. BETTENCOURT 206.445.5958 . C.GESTRING 253.234.6394 12.16.21 S. LEWISON .12.1.21 REDT # ( RW-124176 )YELM THE VISTA AT MILL POND 2" MPE-___ GAS MAIN EXTENSION - 29 S/F LOTS 10447 MILL RD SE, YELM, WA 98597 PUGET SOUND ENERGY 107061294 105098904 1" = 50'1 OF 2 THURSTON 344 CIONC 25SE-T17N-R01E 284.038 284.043 COMCAST TED AXTELL . WAVE BROADBAND . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 511968941 107061294 N/A 106381786 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2"MPE-___2 FT JOINT 2"MPE-___1,087 FT .... .... .... .... Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:DON BETTENCOURT 206.445.5958 Don.Bettencourt@pse.com 60 IP 344-60 N/A N/A SITE PLAN xx INSTALL 2" = 2 FT JOINT 2" = 1,087 FT ... ... ... JFLANSBURG@THERUSHCOMPANIES.COM CFH / HOME = 125 N Vicinity Map 46.9359, -122.6132 SITE 6" X 2" HVTT TIE-IN 14'S C/L & 31'E C/L ______'S C/L & _____'E C/L INSTALL 2" MPE-___ 2' @ 31'E C/L (______)' @ _____'E C/L BEGIN JOINT MAIN 16'S C/L & 31'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 17' @ 31'E C/L (______)' @ _____'E C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 33'S C/L & 31'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 403' @ 31'E C/L (______)' @ _____'E C/L 2" INLINE TEE 31'S C/L & 31'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 299' @ 31'S C/L TO 52'R (______)' @ _____'S C/L TO _____'R 2" CAP EOM/WIREBOX 67'N C/L & 52'R ______'N C/L & _____'R 2" CAP EOM/WIREBOX 91'N C/L & 52'R ______'N C/L & _____'R JOINT 2" MPE-___ 368' @ 31'S C/L TO 52'R (______)' @ _____'S C/L TO _____'R IP 344-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 29 LOT 1 2 40 1 S 3 DB120 2 70 ( )' SCL GAS SVC, SECONDARY X02 LOT 26 LOT 4 2 40 1 N 2 DB120 1 70 ( )' NCL PRIMARY ----3 DB120 2 70 ( )' NCL GAS SVC, SECONDARY X03 LOT 26 LOT 25 4 40 1 E 2 DB120 2 30 ( )' ECL GAS MAIN, PRIMARY X04 LOT 25 LOT 15 4 40 1 E 2 DB120 1 80 ( )' ECL GAS MAIN, PRIMARY X05 LOT 15 LOT 25 2 40 1 E 3 DB120 1 70 ( )' ECL GAS SVC, SECONDARY X06 LOT 13 LOT 5 2 40 1 W 3 DB120 1 70 ( )' WCL GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 8 2" YELLOW SCH 40 PVC = 280 FT 2" DB120 GREY PVC = 210 FT 2" PVC PLUG /CAPS = 8 4" PVC PLUG /CAPS = 4 4" YELLOW SCH 40 PVC = 110 FT 3" DB120 GREY PVC = 420 FT 3" PVC PLUG /CAPS = 12