105098904 THE VISTA AT MILL PONDssssssssssssssssssssssssssss1+002+003+00LOT 15 LOT 16
LOT 9
LOT 17
LOT 10
LOT 18
LOT 11
LOT 12
LOT 5
LOT 13 LOT 14
LOT 24 LOT 23
LOT 22 LOT 21
LOT 25
LOT 26
LOT 27
LOT 28
LOT 29
TRACT 'A'
LOT 6
LOT 1
LOT 2
LOT 3
LOT 4
LOT 7
LOT 8
TRACT 'B'
LOT 19
LOT 20
104TH AVE SE
MILL RD SE104TH PL SE
VISTA RD 1VISTA RD 2BARRY BRIDGES ST SE15510
15501
10518
10440
ABC#2ACSRABC#2ACSRB#4AC
S
R
FUSE @ 65T
SW#T86497
REMOVE
REMOVE
IRR
MON
ST LT
FEEDYEL
26
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
H1A TO METER LOCATION
#2ACSR58'58'20'49'60'
R50'
R50'
FUSE @ 25T
SW#T86740
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
C. GESTRING 253.234.6394 12.16.21
C.GESTRING 253.234.6394 12.16.21
S. LEWISON .12.1.21
REDT # ( RW-124176 )YELM
THE VISTA AT MILL POND
1Ø PRIMARY U/G LINE EXTENSION - 29 S/F LOTS
10447 MILL RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A IP 344-60
107061294 105098904
1" = 50'2 OF 4
THURSTON 344 CIONC QSTHLE
25SE-T17N-R01E 284.038 284.043
1701E100 1702E116 1701E097 YEL-26
COMCAST
TED AXTELL
.
WAVE BROADBAND
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-26
06.11.21
260 256 272
N/A 23 N/A
260 279 272
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 1137
17 3,200
115 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #IRRIGATION
N/A
N/A
TBD
N/A
1kW
N/A
2.7 @ H1A
2.0 @ H1A
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 H1A 1 #1AL IRRIGATION
-1 H1A 1 #1AL MONUMENT
-1 H1A 1 TBD STREET LIGHTS
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V02 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #MONUMENT
N/A
N/A
TBD
N/A
1kW
N/A
2.7 @ H1A
2.0 @ H1A
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #STREET LIGHTS
N/A
N/A
TBD
N/A
1kW
N/A
2.7 @ H1A
2.0 @ H1A
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Combustible walls using a reduced-flammability transformer. Gas
service meter relief vent.3 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Generators, customer-owned transformers, fire sprinkler valves,
standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and reduced flammability oil.
100 FT
SITE SPECIFIC NOTES
AT P01 (559125-147280) 1993 CLASS 3 - 45'
-INSTALL (1) 2" PRIMARY RISER ON EXISTING STANDOFF BRACKETS
-STIRRUP (2254000)
-ALUM "H" CONNECTOR (2167000)
(RIS2CSS) 6042.1000
-FUSE @ 65T (3412600), TAP 'B' PHASE
-INSTALL SWITCH# T86497
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTOR
C/O & SURGE ARRESTOR (TSU1L1) 6043.1000
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 LOT 29 LOT 1 2 40 1 S 3 DB120 2 70 ( )' SCL GAS SVC, SECONDARY
X02 LOT 26 LOT 4
----2 DB120 1 70 ( )' NCL PRIMARY
2 40 1 N 3 DB120 2 70 ( )' NCL GAS SVC, SECONDARY
X03 LOT 26 LOT 25 4 40 1 E 2 DB120 2 30 ( )' ECL GAS MAIN, PRIMARY
X04 LOT 25 LOT 15 4 40 1 E 2 DB120 1 80 ( )' ECL GAS MAIN, PRIMARY
X05 LOT 15 LOT 25 2 40 1 E 3 DB120 1 70 ( )' ECL GAS SVC, SECONDARY
X06 LOT 13 LOT 5 2 40 1 W 3 DB120 1 70 ( )' WCL GAS SVC, SECONDARY
2" PVC PLUG /CAPS = 8 2" YELLOW SCH 40 PVC = 280 FT 2" DB120 GREY PVC = 210 FT 2" PVC PLUG /CAPS = 8
4" PVC PLUG /CAPS = 4 4" YELLOW SCH 40 PVC = 110 FT 3" DB120 GREY PVC = 420 FT 3" PVC PLUG /CAPS = 12
DEDICATED FACILITIES (105098904) for Dedicated Stub Locations & RF Transformers
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
-V01 LOT 2 55 DED. CONDUIT & WIRE 2-36, 2-54A
-V03 LOT 5 25 DED. CONDUIT & WIRE 2-36, 2-54A
-V03 LOT 9 15 DED. CONDUIT & WIRE 2-36, 2-54A
-V03 LOT 11 40 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 14 50 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 18 25 DED. CONDUIT & WIRE 2-36, 2-54A
-H2B LOT 20 35 DED. CONDUIT & WIRE 2-36, 2-54A
-H2B LOT 21 15 DED. CONDUIT & WIRE 2-36, 2-54A
V01 - V03 ---REDUCED FLAMMABILITY -
TOTAL FT=260
→SEE PSE HANDBOOKS←
SEE 1218 (SF),1220 (MF), 6080,
FOR TRENCH SEE 3061, 2809
LABOR UNITS
-
-
-
-
-
-
-
-
-
-
-
2-24
2-26
-
-
-
-
-
-
-
-
2-26
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
AT P02 (559131-147256) 2013 CLASS 2 - 45'
-REMOVE POLE & ALL PSE EQUIPMENT
-
-
-
-
-REMOVE 15kVA OH 120/240V TRF & C/O
AT P03 (559133-147241) 2013 CLASS 3 - 45'
-
-
-
-
-
-REMOVE POLE & ALL PSE EQUIPMENT
AT P04 (559138-147233 )
-INSTALL (1) 2" PRIMARY RISER
-STIRRUP (2254000)
-ALUM "H" CONNECTOR (2167000)
(RIS2CSS) 6042.1000
-FUSE @ xx (3412600), TAP 'B' PHASE
-INSTALL SWITCH# T86740
-INSTALL NEW 45' CLASS 3 POLE (PD453)
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTOR
C/O & SURGE ARRESTOR (TSU1L1) 6043.1000
-DEEP SET POLE +1' REQUIRED FOR CROSSWIND
-