Loading...
PSE FINAL 105099185 TAHOMA TERRA APTSN Vicinity Map 46.9406, -122.6306 Owner / Developer Contact Info officeATTN: TAHOMA TERRA HOLDINGS, LLC PO BOX 73790 PUYALLUP, WA 98373 EVAN MANN 253.820.7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 512082454 105099185 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 105099185N/ADESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . E. ORTIZ .03.11.22 N/A .N/A E. ORTIZ .03.11.22 REDT # ( RW-124539 )YELM TAHOMA TERRA APARTMENTS 2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS 14301 TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105099185 N/A 1 OF 3 THURSTON N/A N/A QSTHLE 24SW-T17N-R01E N/A N/A 1701E095 1702E116 1701E095 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:DON BETTENCOURT 206.445.5958 Don.Bettencourt@pse.com x x x ... ... ... x EVAN@SOUNDBUILTHOMES.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN SITE POWER GENERAL NOTES - MULTIFAMILY PROJECT 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN J-BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" VAULT DETAIL @ J01 NOT TO SCALE MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES NOT TO SCALE FIRE ESCAPE SERVICE GAS RELIEF DOOR, WINDOW, VENT, OR OTHER OPENING TANK FUEL VENT OIL-FILLED ELECTRICAL EQUIPMENT SPRINKLER VALVE, STANDPIPE, OR HYDRANT 20' 3' 10' 6' 10' (TRANSFORMER) SINGLE PHASE SECONDARY CONCRETE HANDHOLE NOT TO SCALE @H2A Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. TOP VIEW SIDE VIEW 2'-4" EXCAVATION: 5-1/3 CUBIC YARDS 7'-0" 6'-0" 2" 6" Crushed rock 2'-6" Install PVC bell ends and grout into wall 2'-6" Handhole 820 lbs Conduits and conductors shall enter from ends of handhole through knockouts provided Typical customer run service conductors in duct Steel Door Seal conduit with foam VAULT DETAIL @ V01 & V02 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Combustible walls using a reduced-flammability transformer. Gas service meter relief vent.3 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Generators, customer-owned transformers, fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and reduced flammability oil. 100 FT 1+002+003+00PR C 2 + 5 7 . 2 1 54+0055+0056+0057+0010+00 11+00 12+00 13+00 14+00 15+0 0 16+00 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+00P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+00PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 PC 13+41.14PC 14+43.64P C 1 4 + 8 9 . 5 6 PT 13+65.35P T 1 4 + 7 0 . 1 8PT 15+09.1115+0016+0017+0018+00P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+00PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+0018+54P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+0019+0019+21PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 16+66 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+0018+54P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+00PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+00P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+00PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 16+66 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+0018+54P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+0019+0019+21PC 15+53.31 PT 16+ 2 5 . 8 2 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+00P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+00PC 15+53.31 PT 16+ 2 5 . 8 2 TPN 78640000015 TRACT 12 326330STORM TRACT C LOT 56 LOT 55 LOT 54 LOT 57 LOT 78 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 6 LOT 5 LOT 3 LOT 2 LOT 1 LOT 4 STORM TRACT D 9+ 7 5 10 + 0 0 11+00 12+00 13+00 14+00 15+00 15+23 10+00 11+00 12+00 13+00 14+00 15+0 0 16+00 16+66 PC 13+41.14PT 13+65.35PC 14+43.64P T 1 4 + 7 0 . 1 8 P C 1 4 + 8 9 . 5 6 PT 15+09.1115+0016+0017+0018+0018+54P R C 1 5 + 4 7 . 8 9 15+0016+0017+0018+0019+0019+21PC 15+53.31 PT 16+ 2 5 . 8 2 326330STORM TRACT C LOT 56 LOT 55 LOT 54 LOT 57 LOT 78 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 6 LOT 5 LOT 3 LOT 2 LOT 1 LOT 4 STORM TRACT D TPN 78640000015 TRACT 12 BLDG A 12 UNITS ~1053 SQ. FT.BLDG B 12 UNITS ~964 SQ. FT.BLDG C 12 UNITS ~964 SQ. FT. BLDG D 12 UNITS ~870 SQ. FT. TAHOMA BLVD H ROADDRIVE A J ROADFUTURE R O A D EX: 1-4" FEED YEL 25 JENSEN D R S EDOTSON ST SELO N G M I R E S T S E 3-6" DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM VAULT/HH TO METER LOCATION (TYPICAL) FUT: 1-2" 4-4" 1-4" 4-6" 3-6"2-4" (3) 300KCMIL (3) 300KCMIL (3) 300KCMIL (3) 300KCMIL 14301 ST LTS?? FUT: 1-4"90'130' 56' 56'56'26'25'56' 56' 'A' 'B' 'C' 'D' 'E' 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . E. ORTIZ .03.11.22 N/A .N/A E. ORTIZ .03.11.22 REDT # ( RW-124539 )YELM TAHOMA TERRA APARTMENTS 2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS 14301 TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105099185 AS SHOWN 2 OF 3 THURSTON N/A N/A QSTHLE 24SW-T17N-R01E N/A N/A 1701E095 1702E116 1701E095 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . .SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-25 06.11.21 301 310 317 13 13 0 314 323 317 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 930 17 1,053 65 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #A 12 + HP 1,053 600A ELEC 56kW 65 3.0 @ H2A 1.0 @ H2A CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS A 13 H2A 3 300KCMIL - B 13 V02 3 300KCMIL - C 13 V01 3 300KCMIL - D 13 V01 3 300KCMIL - -TBD V01 TBD TBD STREET LIGHTS ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #B 12 +HP 964 600A ELEC 53kW 65 1.7 @ V02 0.3 @ V02 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #C 12 + HP 964 600A ELEC 53kW 65 1.7 @ V01 0.3 @ V01 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #D 12 + HP 870 600A ELEC 53kW 65 1.7 @ V01 0.3 @ V01 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #STREET LIGHTS N/A N/A TBD N/A 1KW N/A 1.7 @ V01 0.3 @ V01 Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 & V02 100kVA 0.5 2.43 57,300 AMPS 1.90 36,600 AMPS H2A ---7,200 AMPS -11,900 AMPS CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A''B'2 DB120 2 70 ( )'NCL PRIMARY X02 'C''D' 2 DB120 1 70 ( )'NCL PRIMARY 3 DB120 1 70 ( )'NCL SECONDARY X03 'D''E'2 DB120 1 40 ( )'WCL PRIMARY 2" DB120 GREY PVC = 250 FT 2" PVC PLUG /CAPS = 8 3" DB120 GREY PVC = 70 FT 3" PVC PLUG /CAPS = 2 EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE SITE FEED YEL 25 'A' 'B' CØAFP526 AØAFA000 BØAFA001 CØAFA002 AØAEN000 BØAEN001 CØAEN002 AØAEN979 BØAEN980 CØAEN981 AØAFA003 BØAFA004 CØAFA005 NEW 1/O AL EJF654-AØ EJF655-BØ EJF656-CØ NEW 1/O AL EJF657-AØ NEW 1/O AL EJF658-BØ BLDG A 12 UNITS ~1053 SQ. FT.BLDG B 12 UNITS ~964 SQ. FT.BLDG C 12 UNITS ~964 SQ. FT. BLDG D 12 UNITS ~870 SQ. FT. DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM VAULT/HH TO METER LOCATION (TYPICAL) FUT: 1-2" (3) 300KCMIL (3) 300KCMIL (3) 300KCMIL (3) 300KCMIL ST LTS?? FUT: 1-4" 'A' 'B' 'C' 'D' 'E' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . E. ORTIZ .03.11.22 N/A .N/A E. ORTIZ .03.11.22 REDT # ( RW-124539 )YELM TAHOMA TERRA APARTMENTS 2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS 14301 TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105099185 N/A 3 OF 3 THURSTON N/A N/A QSTHLE 24SW-T17N-R01E N/A N/A 1701E095 1702E116 1701E095 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 1701E095 NOT TO SCALE VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559328 146817 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 AØ V02 559324 146794 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 BØ J01 559339 146830 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/4-Pos J-Bus x3 Matid: 7625900 5 7 JBOX15L 6055.1030 3Ø ELB10J 6041.1000 CAP (7630600) Existing J02 559338 146840 4'8"x7'x5' w/2-3' Sq Doors Matid: Existing J-Box Below Grade w/4-Pos J-Bus x3 Matid: Existing 3 - ELB10J 6041.1000 TAP 3Ø THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL E03 J01 4 1 25 -2 --CONDUIT ONLY ----- J02 J01 CABLE ONLY 387 346 3Ø 1/0 AL JKT 230 EJF654 EJF655 EJF656 -1.6 J01 V01 2 1 155 1 ---109 96 1/0 AL JKT 235 EJF657 ---0.9 J01 V02 2 1 410 1 2 1 -218 193 1/0 AL JKT 490 -EJF658 --2.0 V02 E02 2 1 55 1 -2 -CONDUIT ONLY ---FUT - J01 E01 4 1 170 ----CONDUIT ONLY ---FUT - 2" PVC (FT) & BENDS =620 3 2 3 0 1/0 AL JKT TOTAL (FT) =725 TTL (Gal)4.5 4" PVC (FT) & BENDS =195 0 2 0 0 3Ø 1/0 AL JKT TOTAL (FT) =230 NOT TO SCALE NEW CONDUIT DIAGRAM CUST. OWNED SECONDARY 3" PRIMARY 4" PRIMARY 2" CONDUIT LEGEND SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H2A HANDHOLE 4 - 3030 HH14350SP 6050.2020 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V02 H2A 350 95 3 25 1 2 3.0 1.0 350 UG Triplex (ft) =95 3" PVC & BENDS (ft)=25 1 0 2 0 0.2 TOTAL QTS OF GLUE 0.2