PSE FINAL 105099185 TAHOMA TERRA APTSN
Vicinity Map
46.9406, -122.6306
Owner / Developer Contact Info
officeATTN:
TAHOMA TERRA HOLDINGS, LLC
PO BOX 73790
PUYALLUP, WA 98373
EVAN MANN 253.820.7835
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
512082454 105099185
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA 105099185N/ADESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
E. ORTIZ .03.11.22
N/A .N/A
E. ORTIZ .03.11.22
REDT # ( RW-124539 )YELM
TAHOMA TERRA APARTMENTS
2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS
14301 TAHOMA BLVD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105099185
N/A 1 OF 3
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DON BETTENCOURT
206.445.5958
Don.Bettencourt@pse.com
x
x
x
...
...
...
x
EVAN@SOUNDBUILTHOMES.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
SITE
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
J-BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
VAULT DETAIL @ J01
NOT TO SCALE
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
SINGLE PHASE SECONDARY CONCRETE HANDHOLE
NOT TO SCALE @H2A
Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on
the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be
removed by customer or cut off at the vault wall.
TOP VIEW
SIDE VIEW
2'-4"
EXCAVATION: 5-1/3 CUBIC YARDS
7'-0"
6'-0"
2"
6" Crushed rock
2'-6"
Install PVC bell ends
and grout into wall
2'-6"
Handhole
820 lbs
Conduits and conductors shall enter from
ends of handhole through knockouts provided
Typical customer run
service conductors in duct
Steel Door
Seal conduit
with foam
VAULT DETAIL @ V01 & V02
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Combustible walls using a reduced-flammability transformer. Gas
service meter relief vent.3 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Generators, customer-owned transformers, fire sprinkler valves,
standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and reduced flammability oil.
100 FT
1+002+003+00PR
C
2
+
5
7
.
2
1 54+0055+0056+0057+0010+00
11+00
12+00
13+00 14+00
15+0
0
16+00
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+00P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+00PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
PC 13+41.14PC 14+43.64P
C
1
4
+
8
9
.
5
6
PT 13+65.35P
T
1
4
+
7
0
.
1
8PT 15+09.1115+0016+0017+0018+00P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+00PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+0018+54P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+0019+0019+21PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
16+66
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+0018+54P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+00PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+00P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+00PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
16+66
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+0018+54P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+0019+0019+21PC 15+53.31
PT 16+
2
5
.
8
2
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+00P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+00PC 15+53.31
PT 16+
2
5
.
8
2
TPN 78640000015
TRACT 12 326330STORM TRACT C
LOT 56
LOT 55
LOT 54
LOT 57 LOT 78
LOT 7
LOT 8
LOT 9
LOT 10
LOT 11
LOT 12
LOT 6
LOT 5
LOT 3
LOT 2
LOT 1
LOT 4
STORM TRACT D
9+
7
5
10
+
0
0
11+00
12+00
13+00
14+00
15+00
15+23
10+00
11+00
12+00
13+00 14+00
15+0
0
16+00
16+66
PC 13+41.14PT 13+65.35PC 14+43.64P
T
1
4
+
7
0
.
1
8
P
C
1
4
+
8
9
.
5
6 PT 15+09.1115+0016+0017+0018+0018+54P
R
C
1
5
+
4
7
.
8
9
15+0016+0017+0018+0019+0019+21PC 15+53.31
PT 16+
2
5
.
8
2 326330STORM TRACT C
LOT 56
LOT 55
LOT 54
LOT 57 LOT 78
LOT 7
LOT 8
LOT 9
LOT 10
LOT 11
LOT 12
LOT 6
LOT 5
LOT 3
LOT 2
LOT 1
LOT 4
STORM TRACT D
TPN 78640000015
TRACT 12
BLDG A
12 UNITS
~1053 SQ. FT.BLDG B
12 UNITS
~964 SQ. FT.BLDG C
12 UNITS
~964 SQ. FT.
BLDG D
12 UNITS
~870 SQ. FT.
TAHOMA BLVD
H ROADDRIVE A J ROADFUTURE R
O
A
D
EX: 1-4"
FEED
YEL
25
JENSEN D
R
S
EDOTSON ST SELO
N
G
M
I
R
E
S
T
S
E
3-6"
DEVELOPER RESPONSIBLE FOR
CONDUIT/WIRE FROM VAULT/HH
TO METER LOCATION (TYPICAL)
FUT: 1-2"
4-4"
1-4"
4-6"
3-6"2-4"
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
14301
ST LTS??
FUT: 1-4"90'130'
56'
56'56'26'25'56'
56'
'A'
'B'
'C'
'D'
'E'
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
E. ORTIZ .03.11.22
N/A .N/A
E. ORTIZ .03.11.22
REDT # ( RW-124539 )YELM
TAHOMA TERRA APARTMENTS
2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS
14301 TAHOMA BLVD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105099185
AS SHOWN 2 OF 3
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
06.11.21
301 310 317
13 13 0
314 323 317
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 930
17 1,053
65 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #A
12 + HP
1,053
600A
ELEC
56kW
65
3.0 @ H2A
1.0 @ H2A
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
A 13 H2A 3 300KCMIL -
B 13 V02 3 300KCMIL -
C 13 V01 3 300KCMIL -
D 13 V01 3 300KCMIL -
-TBD V01 TBD TBD STREET LIGHTS
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #B
12 +HP
964
600A
ELEC
53kW
65
1.7 @ V02
0.3 @ V02
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #C
12 + HP
964
600A
ELEC
53kW
65
1.7 @ V01
0.3 @ V01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #D
12 + HP
870
600A
ELEC
53kW
65
1.7 @ V01
0.3 @ V01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #STREET LIGHTS
N/A
N/A
TBD
N/A
1KW
N/A
1.7 @ V01
0.3 @ V01
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 & V02 100kVA 0.5 2.43 57,300 AMPS 1.90 36,600 AMPS
H2A ---7,200 AMPS -11,900 AMPS
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY
X01 'A''B'2 DB120 2 70 ( )'NCL PRIMARY
X02 'C''D'
2 DB120 1 70 ( )'NCL PRIMARY
3 DB120 1 70 ( )'NCL SECONDARY
X03 'D''E'2 DB120 1 40 ( )'WCL PRIMARY
2" DB120 GREY PVC = 250 FT 2" PVC PLUG /CAPS = 8
3" DB120 GREY PVC = 70 FT 3" PVC PLUG /CAPS = 2
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
SITE
FEED
YEL
25
'A'
'B'
CØAFP526
AØAFA000
BØAFA001
CØAFA002
AØAEN000
BØAEN001
CØAEN002
AØAEN979
BØAEN980
CØAEN981
AØAFA003
BØAFA004
CØAFA005
NEW 1/O AL
EJF654-AØ
EJF655-BØ
EJF656-CØ
NEW 1/O AL
EJF657-AØ
NEW 1/O AL
EJF658-BØ
BLDG A
12 UNITS
~1053 SQ. FT.BLDG B
12 UNITS
~964 SQ. FT.BLDG C
12 UNITS
~964 SQ. FT.
BLDG D
12 UNITS
~870 SQ. FT.
DEVELOPER RESPONSIBLE FOR
CONDUIT/WIRE FROM VAULT/HH
TO METER LOCATION (TYPICAL)
FUT: 1-2"
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
ST LTS??
FUT: 1-4"
'A'
'B'
'C'
'D'
'E'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
E. ORTIZ .03.11.22
N/A .N/A
E. ORTIZ .03.11.22
REDT # ( RW-124539 )YELM
TAHOMA TERRA APARTMENTS
2Ø PRIMARY U/G LINE EXTENSION - 4 M/F BLDGS, 48 UNITS
14301 TAHOMA BLVD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105099185
N/A 3 OF 3
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP 1701E095
NOT TO SCALE
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559328
146817
54"x54"x38"
Unistrut HH
Matid: 7663002
100KVA MP TRF
120/240
Matid: 6247200
1 1
MINU1LR 6045.1010 AØ
V02 559324
146794
54"x54"x38"
Unistrut HH
Matid: 7663002
100KVA MP TRF
120/240
Matid: 6247200
1 1
MINU1LR 6045.1010 BØ
J01 559339
146830
4'8"x7'x5'
w/2-3' Sq Doors
Matid: 7663200
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: 7625900
5 7
JBOX15L 6055.1030 3Ø
ELB10J 6041.1000
CAP (7630600)
Existing
J02
559338
146840
4'8"x7'x5'
w/2-3' Sq Doors
Matid: Existing
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: Existing
3 -
ELB10J 6041.1000 TAP 3Ø
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
E03 J01 4 1 25 -2 --CONDUIT ONLY -----
J02 J01 CABLE ONLY 387 346 3Ø 1/0 AL JKT 230 EJF654 EJF655 EJF656 -1.6
J01 V01 2 1 155 1 ---109 96 1/0 AL JKT 235 EJF657 ---0.9
J01 V02 2 1 410 1 2 1 -218 193 1/0 AL JKT 490 -EJF658 --2.0
V02 E02 2 1 55 1 -2 -CONDUIT ONLY ---FUT -
J01 E01 4 1 170 ----CONDUIT ONLY ---FUT -
2" PVC (FT) & BENDS =620 3 2 3 0 1/0 AL JKT TOTAL (FT) =725 TTL (Gal)4.5
4" PVC (FT) & BENDS =195 0 2 0 0 3Ø 1/0 AL JKT TOTAL (FT) =230
NOT TO SCALE
NEW CONDUIT DIAGRAM
CUST. OWNED
SECONDARY 3"
PRIMARY 4"
PRIMARY 2"
CONDUIT LEGEND
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H2A HANDHOLE 4 - 3030 HH14350SP 6050.2020
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit
V02 H2A 350 95 3 25 1 2 3.0 1.0
350 UG Triplex (ft) =95 3" PVC & BENDS (ft)=25 1 0 2 0 0.2
TOTAL QTS OF GLUE 0.2