Loading...
PSE FINAL 107061200 MOUNTAIN MEADOWS1 2 3 4 5 14 13 12 11 109 TRACT A OPEN SPACE 17 16 15 19 18 76 8 202122 56' 2" MPE IP 28' N 107023655-2005 JT2" MPE IP 28' E107023655-2005 JT2" MPE IP84' E2" MPE IP 28' E107023655-2005 JT14740 14867 148725/8" MPE 150' N 89TH WAY SE89TH AVE SEBURNETT RD SE89TH WAY SE 14822 14834FLOW14770 ELEC ONLYBURNETT RD SE50' 150'N FLOW56'56'40' Owner / Developer Contact Info officeATTN: COPPER RIDGE, LLC PO BOX 73790 PUYALLUP, WA 98373 EVAN MANN 253.820.7835 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105098738107061200Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL D. BETTENCOURT 206.445.5958 . ... A. VASQUEZ .04.13.22 REDT # ( RW-124573 )YELM MOUNTAIN MEADOWS 2" MPE-___ GAS MAIN EXTENSION - 22 S/F LOTS P# 21713310400, 8818 BURNETT RD SE, YELM, WA, 98597 PUGET SOUND ENERGY 107061200 105098738 1" = 50'1 OF 2 THURSTON 344 CIONC 13SW-T17N-R01E 281.042 280.038 COMCAST TED AXTELL 253.878.2794 LUMEN . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 511877256 107061200 N/A 106381322 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 JOINT 2"MPE-___941 FT .... .... .... .... .... Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:DON BETTENCOURT 206.445.5958 Don.Bettencourt@pse.com 60 IP 344-60 N/A N/A SITE PLAN xx JOINT 2" = 941 FT ... ... ... EVAN@SOUNDBUILTHOMES.COM IP 344-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CFH / HOME = 90 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 'A'TR. A ELEC ONLY 2 DB120 1 105 ( )' SCL PRIMARY X02 TR. A 'B'4 40 1 W GAS ONLY 65 ( )' ECL GAS MAIN X03 LOT 21 LOT 1 2 40 1 E 3 DB120 2 65 ( )' ECL GAS SVC, SECONDARY X04 LOT 18 LOT 4 2 40 1 W 3 DB120 2 65 ( )' WCL GAS SVC, SECONDARY X05 LOT 18 LOT 5 4 40 1 E 2 DB120 1 65 ( )' WCL GAS MAIN, PRIMARY ----3 DB120 1 65 ( )' WCL SECONDARY X06 LOT 14 LOT 15 2 40 1 N 3 DB120 2 65 ( )' SCL GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 6 2" YELLOW SCH 40 PVC = 195 FT 2" DB120 GREY PVC = 170 FT 2" PVC PLUG /CAPS = 4 4" PVC PLUG /CAPS = 4 4" YELLOW SCH 40 PVC = 130 FT 3" DB120 GREY PVC = 455 FT 3" PVC PLUG /CAPS = 14 N Vicinity Map 46.9591, -122.6274 SITE 2" FUSED TIE-IN & BEGIN JOINT MAIN 202'N C/L & 28'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 113' @ 28'E C/L TO 32'E C/L (______)' @ _____'E C/L TO _____'E C/L JOINT 2" MPE-___ 57' @ 32'E C/L (______)' @ _____'E C/L 2" CAP EOM/WIREBOX 26'N C/L & 32'E C/L ______'N C/L & _____'E C/L 2" INLINE TEE 32'S C/L & 32'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 348' @ 32'S C/L (______)' @ _____'S C/L JOINT 2" MPE-___ 60' @ 160'W C/L (______)' @ _____'W C/L 2" 90° ELBOW 32'S C/L & 160'W C/L ______'S C/L & _____'W C/L 2" 90° ELBOW 28'N C/L & 160'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 363' @ 28'N C/L TO 28'E C/L (______)' @ _____'N C/L TO _____'E C/L 2" FUSED TIE-IN & BEGIN JOINT MAIN 202'N C/L & 28'E C/L ______'N C/L & _____'E C/L THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL D. BETTENCOURT 206.445.5958 . ... A. VASQUEZ .04.13.22 REDT # ( RW-124573 )YELM MOUNTAIN MEADOWS 2" MPE-___ GAS MAIN EXTENSION - 22 S/F LOTS P# 21713310400, 8818 BURNETT RD SE, YELM, WA, 98597 PUGET SOUND ENERGY 107061200 105098738 N/A 2 OF 2 THURSTON 344 CIONC 13SW-T17N-R01E 281.042 280.038 COMCAST TED AXTELL 253.878.2794 LUMEN . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . N/A N/A N/A ... ... ... ... EX PLAT MAP 280.038 NOT TO SCALE Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS LS TWIN 2" MAIN 1 & 2 1 1/8 MPE-___65 ( )' ECL 2600 LS TWIN 2" MAIN 3 & 4 1 1/8 MPE-___65 ( )' WCL 2600 SS SINGLE 2" MAIN 5 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 6 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 9 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 10 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 11 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 13 1 1/8 MPE-___10 ( )' SCL 2600 SS SINGLE 2" MAIN 14 1 1/8 MPE-___10 ( )' SCL 2600 LS TWIN 2" MAIN 15 & 16 1 1/8 MPE-___65 ( )' SCL 2600 SS SINGLE 2" MAIN 17 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 18 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 19 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 20 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 21 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 22 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLES =16 355 FT 1 1/8" PE PIPE LS TWIN =3 SITE NOT TO SCALE CROSS SECTION - BURNETT RD SE LOOKING NORTH E 50' ROW PROP. 2" MPE IP - 32'ECL N G GEX. 2" MPE IP - 28'ECL 107023655-2005 JT NOT TO SCALE CROSS SECTION - 89TH WAY SE LOOKING EAST / SOUTH S / W 56' ROW PROP. 2" MPE IP - 32'SCL N / E PROP. 2" MPE IP - 28'ECL GG G EX.2" MPE IP - 28'ECL 107023655-2005 JT