Loading...
Gee Gee new furnace specification 12-3-18GENERAL VENTING REQUIREMENTS AND GUIDELINES DIRECT VENT (cont.) Figure 23 below shows the necessary detail for the roof penetration on a standard direct -vent vertical termination. FIGURE 23 DIRECT VENT VERTICAL TERMINATION DETAIL TOP OF EXHAUST 15" MIN. 12" MIN. (38 cm) (31 cm) 48" MAX. 45' MAX. I (122 cm) (114 cm) 3" MIN. 1 1 (8 cm) DETAIL A TERMINATION HEIGHT REQUIREMENTS COMBUSTION AIR Terminations more than 24" TERMINATION above roof penetration re- quire additional support. INLET ELEVATION 12" (31cm) U.S. MAX. AVERAGE 36" MAX. CANADA: TERMINATIONS ANTICIPATION (91 cm) MUST CONFORM TO SNOW LEVEL CSA B149.1-10, SECT. 8.14 *3" (8cm) minimum only if no snow accumulation is anticipated. ROOF LINE OR PENETRATION NOTE: IF 3" 0 VENTING IS USED, BOTH PIPES (INTAKE AND EXHAUST) MUST BE REDUCED TO 2" 0 BEFORE PENETRATING ROOF. 3" VENT = REDUCER/ ADAPTER 2" VENT = START OF TERMINATION AND END EQUIV. VENT LENGTH ST -A1194 -18-X0 Ar