Loading...
APPROVED 7.28.22 - FINAL 105100514 WASHINGTON APTSN Vicinity Map 46.9430, -122.6104 Owner / Developer Contact Info officeATTN: FIRST FINISHERS, LLC PO BOX 986 YELM, WA 98597 KAI FYRST 360.400.7767 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 511692187 105100514 N/A 105100609 N/A 593246145 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Street Lights Refuse Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 105100514 N/A Phone INTOLIGHT Contact Information: LARS LARSON 425.456.2701 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . CE FEASEL 253.263.5276 06.28.22 N/A .N/A D. WALKER .06.23.22 REDT # ( RW-126602 )YELM WASHINGTON APTS 1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS P# 75300901400, 300 BLOCK, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105100514 N/A 1 OF 3 THURSTON N/A N/A QSTHLE 19SW-T17N-R02E N/A N/A 1702E075 1702E116 1702E075 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN/CENTURYLINK MICHELLE PALMER 360.956.7692 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:DON BETTENCOURT 206.445.5958 Don.Bettencourt@pse.com x x x x Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE ... ... ... KAI@FIRSTFINISHERS.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN POWER GENERAL NOTES - MULTIFAMILY PROJECT 11. 7. 6. 5. 4. 3. 2. 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. VAULT DETAIL @ V01 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 SITE MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES NOT TO SCALE FIRE ESCAPE SERVICE GAS RELIEF DOOR, WINDOW, VENT, OR OTHER OPENING TANK FUEL VENT OIL-FILLED ELECTRICAL EQUIPMENT SPRINKLER VALVE, STANDPIPE, OR HYDRANT 20' 3' 10' 6' 10' (TRANSFORMER) Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT 1. 2. 3. 4. 5. ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD 6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL". ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE POLE. BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN 6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.) APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE REQUIRED. THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC (NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THE DEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUS GRAVEL AT EACH STREET LIGHT LOCATION. IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE MUST BE LEVELED. DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET LIGHT TUBE. 6. SCALE: NONE STREET LIGHT TUBE DETAIL Plan View Detail of Street Light Tube Wire Entrance Slot Street Light Tube Field Side Road Side Wire Entrance Slot 45° 45° Position 3" x 6" wire entrance slot 45 degrees left or right from a line perpendicular to road- way through center of tube. Field Side 3" x 6" Wire Entrance Slot 45° 45° Street light tube set 2" below grade. Road Side 18" - 24" Minimum Depending on Pole Type 5'-0" 20" 26" STREET LIGHT NOTES POTELCO: 7/28/22 R.Wilson 360.536.1944 7/28/22 1 0 1 1 8 7 6 5 4 3 2 1 B L O C K 9 3 2 1 FEEDYEL 25 Y E L M A V E W ( S R 5 1 0 ) W A S H I N G T O N A V E SWRICE ST. SW A L L E Y 3 9 7 A A C 3 9 7 A A C ABCABCANANAN404 109 313 RE-FUSE @ 100T FUSE @ 65T SW#T87606 BLDG 2 8 UNITS ~1000 SQFT (4) 250KCMIL BLDG 1 7 UNITS ~1000 SQFT (4) 250KCMIL DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM VAULT/HH TO METER LOCATION (TYPICAL)#6CU#6CU'A' 2 4 '60'6 0 '60''B' FL1 - Frontage Light To be installed by PSE Pole Services. 1" = 30' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . CE FEASEL 253.263.5276 06.28.22 N/A .N/A D. WALKER .06.23.22 REDT # ( RW-126602 )YELM WASHINGTON APTS 1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS P# 75300901400, 300 BLOCK, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105100514 AS SHOWN 2 OF 3 THURSTON N/A N/A QSTHLE 19SW-T17N-R02E N/A N/A 1702E075 1702E116 1702E075 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN/CENTURYLINK MICHELLE PALMER 360.956.7692 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-25 12.02.21 287 340 326 12 N/A N/A 299 340 326 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 195 17 1000 65 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #1 7 + HP 1000 125A ELEC 41KW 65 1.7 @ V01 0.5 @ V01 CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS 1 8 V01 4 250KCMIL - 2 8 V01 4 250KCMIL - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #2 8 1000 125A ELEC 38KW 65 1.7 @ V01 0.5 @ V01 Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS SITE SPECIFIC NOTES AT P01 (559433-147316) 1967 CLASS 3 - 45' -INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER C/O & SURGE ARRESTOR (TSU1L1) 6043.1000 -INSTALL (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000 -STIRRUP (2254000) -ALUM "H" CONNECTOR (2167000) -FUSE @ 65T (3412600), TAP 'A' PHASE -INSTALL SWITCH# T87606 AT P02 (559446-147327) 1966 CLASS 3 - 45' -REMOVE EXISTING LINK BREAK C/O & 40T FUSE (SW # Y503) -INSTALL 1Ø LOAD INTERRUPTOR C/O (DLS115F) 6022.1000 -RE-FUSE @ 100T (3412700), TAP 'A' PHASE CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A' 'B' 2 DB120 1 90 ( )'NCL PRIMARY 2" DB120 GREY PVC = 90 FT 2" PVC PLUG /CAPS = 2 EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE SITE 7/28/22 R.Wilson 360.536.1944 7/28/22 FEEDYEL 25 3 9 7 A A C 3 9 7 A A C ABCABCANANAN404 109 313 RE-FUSE @ 100T FUSE @ 65T SW#T87606 #6CU#6CU'A' 'B' BLDG 2 8 UNITS ~1000 SQFT (4) 250KCMIL BLDG 1 7 UNITS ~1000 SQFT (4) 250KCMIL 'A' 'B' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. BETTENCOURT 206.445.5958 . CE FEASEL 253.263.5276 06.28.22 N/A .N/A D. WALKER .06.23.22 REDT # ( RW-126602 )YELM WASHINGTON APTS 1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS P# 75300901400, 300 BLOCK, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105100514 N/A 3 OF 3 THURSTON N/A N/A QSTHLE 19SW-T17N-R02E N/A N/A 1702E075 1702E116 1702E075 YEL-25 COMCAST TED AXTELL 253.878.2794 LUMEN/CENTURYLINK MICHELLE PALMER 360.956.7692 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 1702E075 NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL P01 V01 2 1 105 1 - - -49 123 1/0 AL JKT 235 EJD663 ---0.9 2" PVC (FT) & BENDS =105 1 0 0 0 1/0 AL JKT TOTAL (FT) =235 TTL (Gal.)0.9 VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559433 147326 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 1 1 MINU1LR 6045.1010 AØ NOT TO SCALE NEW CONDUIT DIAGRAM CUST. OWNED PRIMARY 2" CONDUIT LEGEND SITE NEW 1/O AL EJD663-AØ STREET LIGHT CIRCUITRY TABLE SITE # FROM CABLE INFO AS-BUILT REMARKSTYPE LF TYPE LENGTH FL1 V01 #6 TPX 250 TOTAL FT =250 TOTAL FT = ST. LT. CIC #6 7/28/22 R.Wilson 360.536.1944 7/28/22