APPROVED 7.28.22 - FINAL 105100514 WASHINGTON APTSN
Vicinity Map
46.9430, -122.6104
Owner / Developer Contact Info
officeATTN:
FIRST FINISHERS, LLC
PO BOX 986
YELM, WA 98597
KAI FYRST 360.400.7767
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
511692187 105100514
N/A 105100609
N/A 593246145
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Street Lights
Refuse
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA 105100514 N/A
Phone
INTOLIGHT Contact Information:
LARS LARSON
425.456.2701
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
CE FEASEL 253.263.5276 06.28.22
N/A .N/A
D. WALKER .06.23.22
REDT # ( RW-126602 )YELM
WASHINGTON APTS
1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS
P# 75300901400, 300 BLOCK, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105100514
N/A 1 OF 3
THURSTON N/A N/A QSTHLE
19SW-T17N-R02E N/A N/A
1702E075 1702E116 1702E075 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN/CENTURYLINK
MICHELLE PALMER
360.956.7692
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DON BETTENCOURT
206.445.5958
Don.Bettencourt@pse.com
x
x
x x
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
KAI@FIRSTFINISHERS.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
VAULT DETAIL @ V01
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
SITE
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
1.
2.
3.
4.
5.
ALL STREET LIGHTING POLES ARE TO BE INSTALLED PER STANDARD
6375.4800 (page #2) IN THE "LINE WORK PRACTICES MANUAL".
ALL POLES (WOOD, CONCRETE OR FIBERGLASS) ARE TO BE SET
PLUMB AND EMBEDDED TO THE GROUND LINE MARKED ON THE
POLE.
BACKFILL AROUND POLE WITH 5/8" MINUS GRAVEL AND COMPACT IN
6" LIFTS. (PEA GRAVEL AND NATIVE SOILS ARE NOT ACCEPTABLE.)
APPROXIMATELY 1 CU. YD. OF 5/8" MINUS CRUSHED ROCK WILL BE
REQUIRED.
THE DEVELOPER IS REQUIRED TO SUPPLY AND INSTALL PLASTIC
(NON PAPER) STREET LIGHT TUBES (MINIMUM 18" DIAMETER) TO
AID IN THE INSTALLATION OF THE STREET LIGHTING POLES. THE
DEVELOPER MUST ALSO SUPPLY THE REQUIRED 5/8" MINUS
GRAVEL AT EACH STREET LIGHT LOCATION.
IN ALL SHOEBOX AND COBRAHEAD INSTALLATIONS, THE LUMINAIRE
MUST BE LEVELED.
DEVELOPER MUST SUPPLY DURABLE LID/COVER AT EACH STREET
LIGHT TUBE.
6.
SCALE: NONE
STREET LIGHT TUBE DETAIL
Plan View Detail
of Street Light Tube
Wire Entrance
Slot
Street Light
Tube
Field
Side
Road
Side
Wire
Entrance Slot
45°
45°
Position 3" x 6" wire entrance slot 45 degrees
left or right from a line perpendicular to road-
way through center of tube.
Field Side
3" x 6" Wire
Entrance Slot
45°
45°
Street light tube
set 2" below grade.
Road Side
18" - 24" Minimum
Depending on
Pole Type
5'-0"
20"
26"
STREET LIGHT NOTES
POTELCO:
7/28/22
R.Wilson 360.536.1944 7/28/22
1
0
1
1
8
7
6
5
4
3
2
1
B
L
O
C
K
9
3
2
1 FEEDYEL
25
Y
E
L
M
A
V
E
W
(
S
R
5
1
0
)
W
A
S
H
I
N
G
T
O
N
A
V
E
SWRICE ST. SW
A
L
L
E
Y
3
9
7
A
A
C
3
9
7
A
A
C
ABCABCANANAN404
109
313
RE-FUSE @ 100T
FUSE @ 65T
SW#T87606
BLDG 2
8 UNITS
~1000 SQFT
(4) 250KCMIL
BLDG 1
7 UNITS
~1000 SQFT
(4) 250KCMIL
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
VAULT/HH TO METER
LOCATION (TYPICAL)#6CU#6CU'A'
2
4
'60'6
0
'60''B'
FL1 - Frontage Light
To be installed by PSE Pole Services.
1" = 30'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
CE FEASEL 253.263.5276 06.28.22
N/A .N/A
D. WALKER .06.23.22
REDT # ( RW-126602 )YELM
WASHINGTON APTS
1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS
P# 75300901400, 300 BLOCK, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105100514
AS SHOWN 2 OF 3
THURSTON N/A N/A QSTHLE
19SW-T17N-R02E N/A N/A
1702E075 1702E116 1702E075 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN/CENTURYLINK
MICHELLE PALMER
360.956.7692
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
12.02.21
287 340 326
12 N/A N/A
299 340 326
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 195
17 1000
65 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #1
7 + HP
1000
125A
ELEC
41KW
65
1.7 @ V01
0.5 @ V01
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
1 8 V01 4 250KCMIL -
2 8 V01 4 250KCMIL -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #2
8
1000
125A
ELEC
38KW
65
1.7 @ V01
0.5 @ V01
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X
MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 75kVA 0.5 2.30
36,200 AMPS 1.80 23,100 AMPS
SITE SPECIFIC NOTES
AT P01 (559433-147316) 1967 CLASS 3 - 45'
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER C/O
& SURGE ARRESTOR (TSU1L1) 6043.1000
-INSTALL (1) 2" PRIMARY RISER ON NEW STANDOFF BRACKETS
(RIS2CSS) 6042.1000
-STIRRUP (2254000)
-ALUM "H" CONNECTOR (2167000)
-FUSE @ 65T (3412600), TAP 'A' PHASE
-INSTALL SWITCH# T87606
AT P02 (559446-147327) 1966 CLASS 3 - 45'
-REMOVE EXISTING LINK BREAK C/O & 40T FUSE (SW # Y503)
-INSTALL 1Ø LOAD INTERRUPTOR C/O (DLS115F) 6022.1000
-RE-FUSE @ 100T (3412700), TAP 'A' PHASE
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY
X01 'A' 'B' 2 DB120 1 90 ( )'NCL PRIMARY
2" DB120 GREY PVC = 90 FT 2" PVC PLUG /CAPS = 2
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
SITE
7/28/22
R.Wilson 360.536.1944 7/28/22
FEEDYEL
25
3
9
7
A
A
C
3
9
7
A
A
C
ABCABCANANAN404
109
313
RE-FUSE @ 100T
FUSE @ 65T
SW#T87606
#6CU#6CU'A'
'B'
BLDG 2
8 UNITS
~1000 SQFT
(4) 250KCMIL
BLDG 1
7 UNITS
~1000 SQFT
(4) 250KCMIL
'A'
'B'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. BETTENCOURT 206.445.5958 .
CE FEASEL 253.263.5276 06.28.22
N/A .N/A
D. WALKER .06.23.22
REDT # ( RW-126602 )YELM
WASHINGTON APTS
1Ø PRIMARY U/G LINE EXTENSION - 2 M/F BLDGS, 15 UNITS
P# 75300901400, 300 BLOCK, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105100514
N/A 3 OF 3
THURSTON N/A N/A QSTHLE
19SW-T17N-R02E N/A N/A
1702E075 1702E116 1702E075 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN/CENTURYLINK
MICHELLE PALMER
360.956.7692
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP 1702E075
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO
SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
P01 V01 2 1 105 1 - - -49 123 1/0 AL JKT 235 EJD663 ---0.9
2" PVC (FT) & BENDS =105 1 0 0 0
1/0 AL JKT TOTAL (FT) =235 TTL (Gal.)0.9
VAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559433
147326
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 6247150
1 1
MINU1LR 6045.1010 AØ
NOT TO SCALE
NEW CONDUIT DIAGRAM
CUST. OWNED
PRIMARY 2"
CONDUIT LEGEND
SITE
NEW 1/O AL
EJD663-AØ
STREET LIGHT CIRCUITRY TABLE
SITE
# FROM
CABLE INFO AS-BUILT
REMARKSTYPE LF TYPE LENGTH
FL1 V01 #6 TPX 250
TOTAL FT =250 TOTAL FT =
ST. LT. CIC #6
7/28/22
R.Wilson 360.536.1944 7/28/22