Loading...
22-031 Wyndstone Building 4 Hyd Calc Final 8-2-22 stampKnight Fire Protection Inc. 9702 Lathrop Industrial Dr.SW Olympia, Washington 98512 360 786 8606 Job Name :Wyndstone Bldg 4 Building :1 of 1 Location :Yelm, WA System :301 Contract :22-031 Data File :22-031 Wyndstone Bldg 4 - 301.WXF Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 1 Wyndstone Bldg 4 Date 8-2-22 HYDRAULIC CALCULATIONS for Project name:Wyndstone Bldg 4 Location:Yelm, WA Drawing no:1 of 1 Date:8-2-22 Design Remote area number:301 Remote area location:3rd Floor Apartment Occupancy classification:Residential 13R Density:.05 - Gpm/SqFt Area of application:1200 - SqFt Coverage per sprinkler:400 - SqFt Type of sprinklers calculated:4.9k Residential Pendents No. of sprinklers calculated:3 In-rack demand:N/A - GPM Hose streams:N/A - GPM Total water required (including hose streams):62 - GPM @ 50 - Psi Type of system:Wet Tree Volume of dry or preaction system:NA - Gal Water supply information Date:7-5-2018 Location:14940 Tahoma Blvd - Yelm Source:Tony Edwards - Yelm Public Works Name of contractor:Knight Fire Protection, Inc. Address:9702 Lathrop Industrial Drive SW Phone number:360-786-8606 Name of designer:Joe Pennell Authority having jurisdiction:Yelm Fire Department Notes: (Include peaking information or gridded systems here.) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 2 Wyndstone Bldg 4 Date 8-2-22 10 20 30 40 E 50 R 60 U 70 S 80 S 90 E 100 R 110 P 120 130 140 150 200 400 600 800 1000 1200 1400 1600 1800 FLOW ( N ^ 1.85 ) City Water Supply:Demand: C1 C2 C1 - Static Pressure :56 C2 - Residual Pressure:54 C2 - Residual Flow :1130 D1 - Elevation : 12.560 D2 - System Flow :62.387 D2 - System Pressure : 49.723 Hose ( Demand ):_______ D3 - System Demand :62.387 Safety Margin : 6.268 D1 D2 Water Supply Curve C Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 3 Wyndstone Bldg 4 Date 8-2-22 Fitting Legend Abbrev.Name ½¾1 1¼1½2 2½3 3½4 5 6 8 10 12 14 16 18 20 24 B NFPA 13 Butterfly Valve 0 0 0 0 0 6 7 10 0 12 9 10 12 19 21 0 0 0 0 0 Fsp Flow Switch Potter VSR Fitting generates a Fixed Loss Based on Flow G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 H 45' Grvd-Vic Elbow #11 0 0 1 1.5 2 2 3 3 3.5 3.5 4.5 5 6.5 8.5 10 18 20 23 25 30 L NFPA 13 Long Turn Elbow 0.5 1 2 2 2 3 4 5 5 6 8 9 13 16 18 24 27 30 34 40 N *CPVC 90'Ell Harvel-Spears 7 7 8 9 11 12 13 0 0 0 0 0 0 0 0 0 0 0 0 O *CPVC Tee - Branch 3 3 5 6 8 10 12 15 0 0 0 0 0 0 0 0 0 0 0 0 T NFPA 13 90' Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Zia Wilkins 350 Fitting generates a Fixed Loss Based on Flow Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Fittings Used Summary Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 4 Wyndstone Bldg 4 Date 8-2-22 Node Elevation K-Fact Pt Pn Flow Density Area Press No.Actual Actual Req. 301H 30.0 4.9 19.98 na 21.9 0.05 400 16.7 302H 30.0 4.9 16.7 na 20.02 0.05 400 16.7 303H 30.0 4.9 17.44 na 20.46 0.05 400 16.7 301 30.75 20.12 na 302 30.75 16.91 na 303 30.75 18.1 na A 30.75 21.51 na B 30.75 21.69 na C 30.75 24.6 na D 9.75 34.97 na E 9.75 35.5 na F 0.0 40.63 na TOR 7.0 38.29 na BOR 3.0 43.1 na FLG 0.5 44.19 na SRC1 -4.0 51.85 na SRC 1.0 49.72 na The maximum velocity is 13.64 and it occurs in the pipe between nodes 303 and B Pressure / Flow Summary - STANDARD Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 5 Wyndstone Bldg 4 Date 8-2-22 Hyd.Qa Dia.Fitting Pipe Pt Pt Ref."C"or Ftng's Pe Pv *******Notes ****** Point Qt Pf/Ft Eqv.Ln.Total Pf Pn *FLOWING 301H 21.90 1.101 O 5.0 0.833 19.976 K Factor = 4.90 to 150.0 0.0 5.000 -0.325 301 21.9 0.0804 0.0 5.833 0.469 Vel = 7.38 0.0 21.90 20.120 K Factor = 4.88 302H 20.02 1.101 N 7.0 0.833 16.700 K Factor = 4.90 to 150.0 0.0 7.000 -0.325 302 20.02 0.0682 0.0 7.833 0.534 Vel = 6.75 0.0 20.02 16.909 K Factor = 4.87 303H 20.46 1.101 N 7.0 1.833 17.440 K Factor = 4.90 to 150.0 O 5.0 12.000 -0.325 303 20.46 0.0710 0.0 13.833 0.982 Vel = 6.89 0.0 20.46 18.097 K Factor = 4.81 *BRANCHES 301 21.90 1.101 O 5.0 12.250 20.120 to 150.0 0.0 5.000 0.0 A 21.9 0.0805 0.0 17.250 1.389 Vel = 7.38 0.0 21.90 21.509 K Factor = 4.72 302 20.02 1.101 0.0 17.417 16.909 to 150.0 0.0 0.0 0.0 303 20.02 0.0682 0.0 17.417 1.188 Vel = 6.75 303 20.47 1.101 O 5.0 9.333 18.097 to 150.0 0.0 5.000 0.0 B 40.49 0.2508 0.0 14.333 3.595 Vel = 13.64 0.0 40.49 21.692 K Factor = 8.69 *MAIN A 21.90 1.598 0.0 14.000 21.509 to 150.0 0.0 0.0 0.0 B 21.9 0.0131 0.0 14.000 0.183 Vel = 3.50 B 40.49 1.598 0.0 32.000 21.692 to 150.0 0.0 0.0 0.0 C 62.39 0.0910 0.0 32.000 2.911 Vel = 9.98 C 0.0 2.003 N 11.0 21.083 24.603 to 150.0 O 10.0 21.000 9.095 D 62.39 0.0303 0.0 42.083 1.274 Vel = 6.35 D 0.0 2.003 O 10.0 7.500 34.972 to 150.0 0.0 10.000 0.0 E 62.39 0.0303 0.0 17.500 0.530 Vel = 6.35 E 0.0 2.003 O 10.0 20.000 35.502 to 150.0 0.0 10.000 4.223 F 62.39 0.0303 0.0 30.000 0.908 Vel = 6.35 Final Calculations - Hazen-Williams - 2007 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Knight Fire Protection Inc.Page 6 Wyndstone Bldg 4 Date 8-2-22 Hyd.Qa Dia.Fitting Pipe Pt Pt Ref."C"or Ftng's Pe Pv *******Notes ****** Point Qt Pf/Ft Eqv.Ln.Total Pf Pn F 0.0 2.423 3N 36.0 9.417 40.633 to 150.0 O 12.0 48.000 -3.032 TOR 62.39 0.0120 0.0 57.417 0.689 Vel = 4.34 0.0 62.39 38.290 K Factor = 10.08 *RISER TOR 62.39 3.334 Fsp 0.0 4.500 38.290 to 120.0 B 14.992 14.992 4.732 * * Fixed Loss = 3 BOR 62.39 0.0038 0.0 19.492 0.075 Vel = 2.29 BOR 0.0 3.334 0.0 1.833 43.097 to 120.0 0.0 0.0 1.083 FLG 62.39 0.0033 0.0 1.833 0.006 Vel = 2.29 FLG 0.0 4.07 L 9.559 56.500 44.186 to 150.0 T 31.864 44.609 7.569 * * Fixed Loss = 5.62 SRC1 62.39 0.0010 G 3.186 101.109 0.097 Vel = 1.54 Zia 0.0 SRC1 0.0 7.68 T 43.857 744.000 51.852 to 150.0 4H 32.58 91.474 -2.166 SRC 62.39 0.0 3G 15.037 835.474 0.037 Vel = 0.43 0.0 62.39 49.723 K Factor = 8.85 Final Calculations - Hazen-Williams Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087