RELOCATE 101152454 WYNDSTONE CONDOSBUILDING 320 UNITSBUILDING 419 UNITSTAHOMA TERRA PHASE 1, DIVISION 1
TRACT J OPEN SPACEDRIVE AISLE"C"ROAD "A"DRIVE AISLE
"A"
DRIVE AISLE
"B'
TAHOMA BLVD SE DURANT ST SEEX: 3-6"
EX: 1-4"
EX: 3-6"
EX: 1-4"
#4ACSR
EX: 2-4"
EX: 1-2"
EX: 1-4"
EX: 1-4"C#2ACSRC
56'24'EX: 2-4"
EX: 3-6"92'YEL
25FEED EX: 1-4"
EX: 1-4"
24'
24'
NEW
RELOCATE
WYNDSTONE CONDOS
(105099121)
30'C1" = 50'
N
Vicinity Map
46.9437, -122.6218
Owner / Developer Contact Info
officeATTN:
HCDI WYNDSTONE, LLC
11505 BURNHAM DRIVE
GIG HARBOR, WA 98332
SCOTT ANDERSON 253.649.0630
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
513225927 101152454
N/A 108139914
N/A 593246392
N/A 594151292
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Removal
OH Modification
UG Modification
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA 101152454N/ADESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. VASQUEZ .09.10.22
N/A .N/A
A. VASQUEZ .09.10.22
REDT # ( RW-121398 )YELM
WYNDSTONE CONDOS
RELOCATE (1) POLE
15025 TAHOMA BLVD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 101152454
1" = 50'1 OF 2
THURSTON N/A N/A QSTHLE
SE24-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
BRADLEY COLINS
ROW TEL TBD
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
Jessica.Callahan@pse.com
SITE PLAN
x
x
x x
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID #HEIGHT CLASS YEAR XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 559436-147021 45'3 1972 COMCAST
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P1A 559440-147028 45 3 2022 PSE Equip #
PSE GENERAL SPECIFICATIONS
GENERAL
-ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE
STANDARDS ARE AVAILABLE UPON REQUEST.
-WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS; EQUIPMENT
AND PACKING SHALL BE REMOVED DAILY.
-RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE,
STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE
POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
-RETURN ALL STREETLIGHTS, AREA LIGHTS AND FLOODLIGHTS TO SUMNER YARD.
PRE-CONSTRUCTION
-NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY
PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT.
-ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS (425-882-4652) A MINIMUM OF
48 HOURS IN ADVANCE.
-NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
WORK DRAWINGS & DOCUMENTS
-PSE PROJECT MANAGER OR ENGINEER SHALL APPROVE FIELD DESIGN CHANGES.
-MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE INFORMATION IN
RED ON FOREMAN'S COPY OF WORK SKETCH.
-RETURN ONE FOREMAN'S COPY OF WORK SKETCH TO PROJECT MANGER AT COMPLETION OF JOB.
-WHEN PERMITS ARE REQUIRED, A COPY OF THE PERMITS SHALL BE AVAILABLE ON WORK SITE AT
ALL TIMES.
SAFETY
-EFER TO PSE STANDARDS 6275.3000 FOR REQUIREMENTS ON SYSTEM GROUNDING
-REFER TO PSE STANDARDS 6275.9210, 6275.9230 AND 6275.9250 FOR PERSONAL PROTECTIVE
GROUNDING REQUIREMENTS.
-REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS.
-PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF
EACH WORKDAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR.
-PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT
REGULATIONS.
-UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE
WITH LOCAL TRAFFIC REGULATIONS.
-MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY.
JOINT FACILITIES
-COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS.
OVERHEAD CONSTRUCTION
POLES & STRUCTURES
-POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, ALL POLE
LOCATION MEASUREMENTS ARE FROM THE CENTER OF THE POLE.
-ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO NOT SET A
LOWER CLASS POLE THAN SPECIFIED.
-INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. INSTALL SWITCH GROUND ASSEMBLY PER
STANDARD SPECIFICATION 6014.1000 AT NEW GANG OPERATED SWITCH LOCATIONS.
-INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
-STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY.
-TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
-REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND RETURN TO
PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE THE AREA SIMILAR TO ADJACENT
LANDSCAPING.
CONDUCTORS & EQUIPMENT
-TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE CONDUCTORS
AND GUYS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH.
-TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS
SKETCH.
-USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND
TRANSFORMERS ABOVE 25 KVA. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE
PROJECT WHERE THEY ARE CURRENTLY MISSING.
-FOR 12VK CONSTRUCTION, INSTALL AVIAN PROTECTION WITH #4 CU-COVERED JUMPERS
(MID#9998076) AND #4 SD ALUMINUM COVERED TIE-WIRE (MID#8309760). FOR 34VK CONSTRUCTION
USE BARE WIRE PRIMARY JUMPERS WITH PRE-FORMED HELICAL-GRIP TIES AND AVIAN PROTECTION
DEVICES WHEN REQUIRED PER STD. 6015.2000. JUMPERS FOR POLES THAT ARE DOUBLE DEAD
ENDED WITH TREE WIRE CAN BE EITHER THE SAME SIZE TREE WIRE CONDUCTOR OR COVERED CU.
-APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS.
-CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS OTHERWISE
SHOWN ON THE DRAWING.
-ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. CONNECT ALL
POLE GROUNDS TO COMMON NEUTRAL.
-USE LOAD-INTERRUPTER CUTOUTS (WITH ARC SHIELDS) ON ALL PRIMARY OVERHEADS AND
UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T.
-INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS.
SANDERSON@HARBORCUSTOMDEV.COM
SITE
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
CIRCUIT FEET REMOVED: 0'
CIRCUIT FEET ADDED: 35'
NOT TO SCALE
ANCHOR DETAIL - SINGLE HELIX
UTILITY POLE EROSION CONTROL DETAIL
NOT TO SCALE Drainage ditches or Dry vegetated sites
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
6" to 12"
Under Normal
Conditions
40" Min for Single Helix
65" Min for Triple Helix
LABOR UNITS
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SITE SPECIFIC NOTES
AT P01 (559436-147021) 45' CLASS 3, 1972
-TO BE RELOCATED APPROX 2' EAST, 25' SOUTH, OUTSIDE OF PROP COVERED PARKING
-TRANSFER EXISTING #2ACSR OH PRI & NEUT WIRES (S) TO P1A
-SPLICE & SHORTEN AS NECESSARY
-TRANSFER 15kVA TRANSFORMER & LINKBREAK C/O TO P1A
-TRANSFER AMR MCC TO P1A
-REMOVE POLE & ALL PSE EQUIPMENT
AT P1A
-INSTALL NEW 45' CL 3 POLE (PD453) 6010.1000
-INSTALL 1Ø DE #2ACSR (DE2115) 6031.1040
-INSTALL 1Ø TERM ON NEW BI-UNIT (8721000) FIBERGLASS ARM W/
LOAD INTERRUPTER C/O & SURGE ARRESTOR (TSU1L1) 6043.1000
-STIRRUP (2254000)
-ALUM "H" CONNECTOR (2167000)
-FUSE @ 65T (3412600); TAP 'C' PHASE
-INSTALL SWITCH # Y2044
-INSTALL 2" PRI RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000
-INSTALL SINGLE HELIX ANCHOR (ANDH1) 6012.1000 (L = 10' N)
-INSTALL 3/8" PRI (GYD3SA) & 3/8" NEUT (GYD3SAN) DG'S TO NEW ANCHOR
-INSTALL GRID # 559440-147028
AT IP1
-INTERCEPT EXISTING 2" CONDUIT & RE-ROUTE TO
P1A PER PRIMARY CABLE & CONDUIT TABLE (PAGE 2)
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P1A
559440-147028
15kVA
COORDINATE WITH PSE ON MAINTAINING
ELECTRIC SERVICE TO EXISTING CUSTOMERS
DURING ALL PHASES OF CONSTRUCTION
SPAN NOTES
IP1 TO P1A
SPLICE AND EXTEND ±70' #2ACSR OH PRI
ACTUAL FOOTAGE ADDED ( ')
SPLICE AND EXTEND ±70' #2ACSR OH NEUT
ACTUAL FOOTAGE ADDED ( ')
NEW 1/O AL
ADX959-CØ
AØAEN988
BØAEN989
CØAEN990
#4ACSRC
#2ACSRC
YEL
25FEEDNEWCCØADX959
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. VASQUEZ .09.10.22
N/A .N/A
A. VASQUEZ .09.10.22
REDT # ( RW-121398 )YELM
WYNDSTONE CONDOS
RELOCATE (1) POLE
15025 TAHOMA BLVD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 101152454
AS SHOWN 2 OF 2
THURSTON N/A N/A QSTHLE
SE24-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTELL
253.878.2794
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
BRADLEY COLINS
ROW TEL TBD
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 1701E096
NOT TO SCALE
SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
NOT TO SCALE
NEW CONDUIT DIAGRAM
PRIMARY 2"
CONDUIT LEGEND
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
P1A IP1 2 1 35 ----11 74 1/0 AL JKT 70 --ADX959 -0.5
2" PVC (FT) & BENDS =35 0 0 0 0 1/0 AL JKT TOTAL (FT) =70 TTL(Gal) = 0.5
SITE
JOINT TRENCH DETAIL
Primary-Direct Buried or DB 120 (NTS)
Phone & TV Primary Power Cable
Direct Buried or in PSE provided
Excavated Dirt Pile
Final Grade
24" Min
48"
Max
18"
Backfill for DB 120 Conduit/Direct Buried Cable
4" Min
Separation
6" or 12" of sand, 5/8" minus
4" of sand, 5/8" minus, or clean backfill bedding
36"
Min
Cover
ROADSIDE
Typical To Excavated Dirt Pile
(No Rocks over 10" Diameter)
or clean backfill shading
DB120 Grade Conduit
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.