Loading...
RELOCATE 101152454 WYNDSTONE CONDOSBUILDING 320 UNITSBUILDING 419 UNITSTAHOMA TERRA PHASE 1, DIVISION 1 TRACT J OPEN SPACEDRIVE AISLE"C"ROAD "A"DRIVE AISLE "A" DRIVE AISLE "B' TAHOMA BLVD SE DURANT ST SEEX: 3-6" EX: 1-4" EX: 3-6" EX: 1-4" #4ACSR EX: 2-4" EX: 1-2" EX: 1-4" EX: 1-4"C#2ACSRC 56'24'EX: 2-4" EX: 3-6"92'YEL 25FEED EX: 1-4" EX: 1-4" 24' 24' NEW RELOCATE WYNDSTONE CONDOS (105099121) 30'C1" = 50' N Vicinity Map 46.9437, -122.6218 Owner / Developer Contact Info officeATTN: HCDI WYNDSTONE, LLC 11505 BURNHAM DRIVE GIG HARBOR, WA 98332 SCOTT ANDERSON 253.649.0630 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 513225927 101152454 N/A 108139914 N/A 593246392 N/A 594151292 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Removal OH Modification UG Modification Temporary Job Order Distribution Service Stubs HP Svc/MSA 101152454N/ADESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. VASQUEZ .09.10.22 N/A .N/A A. VASQUEZ .09.10.22 REDT # ( RW-121398 )YELM WYNDSTONE CONDOS RELOCATE (1) POLE 15025 TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 101152454 1" = 50'1 OF 2 THURSTON N/A N/A QSTHLE SE24-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY BRADLEY COLINS ROW TEL TBD . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 Jessica.Callahan@pse.com SITE PLAN x x x x RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 559436-147021 45'3 1972 COMCAST Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE ... ... ... POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P1A 559440-147028 45 3 2022 PSE Equip # PSE GENERAL SPECIFICATIONS GENERAL -ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST. -WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS; EQUIPMENT AND PACKING SHALL BE REMOVED DAILY. -RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE, STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS. -RETURN ALL STREETLIGHTS, AREA LIGHTS AND FLOODLIGHTS TO SUMNER YARD. PRE-CONSTRUCTION -NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT. -ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS (425-882-4652) A MINIMUM OF 48 HOURS IN ADVANCE. -NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE. WORK DRAWINGS & DOCUMENTS -PSE PROJECT MANAGER OR ENGINEER SHALL APPROVE FIELD DESIGN CHANGES. -MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE INFORMATION IN RED ON FOREMAN'S COPY OF WORK SKETCH. -RETURN ONE FOREMAN'S COPY OF WORK SKETCH TO PROJECT MANGER AT COMPLETION OF JOB. -WHEN PERMITS ARE REQUIRED, A COPY OF THE PERMITS SHALL BE AVAILABLE ON WORK SITE AT ALL TIMES. SAFETY -EFER TO PSE STANDARDS 6275.3000 FOR REQUIREMENTS ON SYSTEM GROUNDING -REFER TO PSE STANDARDS 6275.9210, 6275.9230 AND 6275.9250 FOR PERSONAL PROTECTIVE GROUNDING REQUIREMENTS. -REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS. -PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF EACH WORKDAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR. -PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT REGULATIONS. -UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE WITH LOCAL TRAFFIC REGULATIONS. -MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY. JOINT FACILITIES -COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS. OVERHEAD CONSTRUCTION POLES & STRUCTURES -POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, ALL POLE LOCATION MEASUREMENTS ARE FROM THE CENTER OF THE POLE. -ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO NOT SET A LOWER CLASS POLE THAN SPECIFIED. -INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. INSTALL SWITCH GROUND ASSEMBLY PER STANDARD SPECIFICATION 6014.1000 AT NEW GANG OPERATED SWITCH LOCATIONS. -INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH. -STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY. -TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE. -REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND RETURN TO PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE THE AREA SIMILAR TO ADJACENT LANDSCAPING. CONDUCTORS & EQUIPMENT -TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE CONDUCTORS AND GUYS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH. -TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS SKETCH. -USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND TRANSFORMERS ABOVE 25 KVA. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE PROJECT WHERE THEY ARE CURRENTLY MISSING. -FOR 12VK CONSTRUCTION, INSTALL AVIAN PROTECTION WITH #4 CU-COVERED JUMPERS (MID#9998076) AND #4 SD ALUMINUM COVERED TIE-WIRE (MID#8309760). FOR 34VK CONSTRUCTION USE BARE WIRE PRIMARY JUMPERS WITH PRE-FORMED HELICAL-GRIP TIES AND AVIAN PROTECTION DEVICES WHEN REQUIRED PER STD. 6015.2000. JUMPERS FOR POLES THAT ARE DOUBLE DEAD ENDED WITH TREE WIRE CAN BE EITHER THE SAME SIZE TREE WIRE CONDUCTOR OR COVERED CU. -APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS. -CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS OTHERWISE SHOWN ON THE DRAWING. -ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. CONNECT ALL POLE GROUNDS TO COMMON NEUTRAL. -USE LOAD-INTERRUPTER CUTOUTS (WITH ARC SHIELDS) ON ALL PRIMARY OVERHEADS AND UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T. -INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS. SANDERSON@HARBORCUSTOMDEV.COM SITE DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES CIRCUIT FEET REMOVED: 0' CIRCUIT FEET ADDED: 35' NOT TO SCALE ANCHOR DETAIL - SINGLE HELIX UTILITY POLE EROSION CONTROL DETAIL NOT TO SCALE Drainage ditches or Dry vegetated sites TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE 6" to 12" Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix LABOR UNITS - - - - - - - - - - - - - - - - - - - - SITE SPECIFIC NOTES AT P01 (559436-147021) 45' CLASS 3, 1972 -TO BE RELOCATED APPROX 2' EAST, 25' SOUTH, OUTSIDE OF PROP COVERED PARKING -TRANSFER EXISTING #2ACSR OH PRI & NEUT WIRES (S) TO P1A -SPLICE & SHORTEN AS NECESSARY -TRANSFER 15kVA TRANSFORMER & LINKBREAK C/O TO P1A -TRANSFER AMR MCC TO P1A -REMOVE POLE & ALL PSE EQUIPMENT AT P1A -INSTALL NEW 45' CL 3 POLE (PD453) 6010.1000 -INSTALL 1Ø DE #2ACSR (DE2115) 6031.1040 -INSTALL 1Ø TERM ON NEW BI-UNIT (8721000) FIBERGLASS ARM W/ LOAD INTERRUPTER C/O & SURGE ARRESTOR (TSU1L1) 6043.1000 -STIRRUP (2254000) -ALUM "H" CONNECTOR (2167000) -FUSE @ 65T (3412600); TAP 'C' PHASE -INSTALL SWITCH # Y2044 -INSTALL 2" PRI RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000 -INSTALL SINGLE HELIX ANCHOR (ANDH1) 6012.1000 (L = 10' N) -INSTALL 3/8" PRI (GYD3SA) & 3/8" NEUT (GYD3SAN) DG'S TO NEW ANCHOR -INSTALL GRID # 559440-147028 AT IP1 -INTERCEPT EXISTING 2" CONDUIT & RE-ROUTE TO P1A PER PRIMARY CABLE & CONDUIT TABLE (PAGE 2) New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P1A 559440-147028 15kVA COORDINATE WITH PSE ON MAINTAINING ELECTRIC SERVICE TO EXISTING CUSTOMERS DURING ALL PHASES OF CONSTRUCTION SPAN NOTES IP1 TO P1A SPLICE AND EXTEND ±70' #2ACSR OH PRI ACTUAL FOOTAGE ADDED ( ') SPLICE AND EXTEND ±70' #2ACSR OH NEUT ACTUAL FOOTAGE ADDED ( ') NEW 1/O AL ADX959-CØ AØAEN988 BØAEN989 CØAEN990 #4ACSRC #2ACSRC YEL 25FEEDNEWCCØADX959 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. VASQUEZ .09.10.22 N/A .N/A A. VASQUEZ .09.10.22 REDT # ( RW-121398 )YELM WYNDSTONE CONDOS RELOCATE (1) POLE 15025 TAHOMA BLVD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 101152454 AS SHOWN 2 OF 2 THURSTON N/A N/A QSTHLE SE24-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTELL 253.878.2794 TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY BRADLEY COLINS ROW TEL TBD . . . ... ... ... EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE EX UNDERGROUND CIRCUIT MAP 1701E096 NOT TO SCALE SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE NOT TO SCALE NEW CONDUIT DIAGRAM PRIMARY 2" CONDUIT LEGEND PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL P1A IP1 2 1 35 ----11 74 1/0 AL JKT 70 --ADX959 -0.5 2" PVC (FT) & BENDS =35 0 0 0 0 1/0 AL JKT TOTAL (FT) =70 TTL(Gal) = 0.5 SITE JOINT TRENCH DETAIL Primary-Direct Buried or DB 120 (NTS) Phone & TV Primary Power Cable Direct Buried or in PSE provided Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit/Direct Buried Cable 4" Min Separation 6" or 12" of sand, 5/8" minus 4" of sand, 5/8" minus, or clean backfill bedding 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading DB120 Grade Conduit - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter.